Category
Pumping
144 contracts tracked across 12 states.
Contracts
144
States covered
12
Vendors
8+
Top states for pumping
Top vendors in pumping
| Vendor | Contracts | Volume |
|---|---|---|
| HERITAGE HYDRO GOVERNOR SERVICE INC | 5 | $202K |
| KINGMAN SEPTIC PUMPING, LLC | 3 | $13K |
| CENTRAL PUMP COMPANY, LLC | 3 | $223K |
| 1831 LOGISTICS L.L.C. | 2 | $37K |
| PHOENIX PUMPS INC | 2 | $2.7M |
| AMES FEDERAL CONTRACTING GROUP LLC | 2 | $129.5M |
| ARCHER WESTERN CONSTRUCTION, LLC | 2 | $124.9M |
| NAVAJO TRIBAL UTILITY AUTHORITY | 2 | $642K |
Recent pumping contracts (40)
| Title | State | Vendor | Value | Solicitation |
|---|---|---|---|---|
| LMDT DEWATERING WELL & PUMP MAINTENANCE | CO | TIDAL MARINE CONSTRUCTION INC | $47K | — |
| VAULT TOILET PUMPING | NV | 1831 LOGISTICS L.L.C. | $9K | — |
| FG POWERPLANT SEWER PUMPING | UT | WEBBS SELECT-A-SERVICE INC | $13K | — |
| DIESEL TRAILER PUMP | MT | SRS CRISAFULLI INC | $235K | — |
| SEPTIC TANK PUMPING SERVICE | MT | READY FREDDY, INC | — | — |
| JOHN W. KEYS III PUMP-GENERATING PLANT DISCHARGE TUBE COATING-LINING REHABILITATION | WA | HARTMAN-WALSH PAINTING COMPANY | $37.7M | — |
| KACHESS DROUGHT RELIEF PUMPING PLANT (KDRPP) PROJECT ENVIRONMENTAL IMPACT STATEMENT (EIS) TASK ORDER | WA | ENVIRONMENTAL MANAGEMENT & PLANNING SOLUTIONS LLC | $113K | — |
| FURNISH AND INSTALL PUMP HOIST ASSEMBLY FOR IA DRILL CREW | WA | B & P CONSORT, INC. | $110K | — |
| MT-CF-OFFICE WELL PUMP REPLACEMENT | MT | LINDSAY DRILLING AND CONTRACTING | $17K | — |
| FLOWAY PUMP SYSTEM REPLACEMENTS IN THE YUMA, ARIZONA AREA. | AZ | PHOENIX PUMPS INC | $2.6M | — |
| CALL 1 OFF VAULT TOILET PUMPING SERVICES BPA | NV | 1831 LOGISTICS L.L.C. | $28K | — |
| THE SANTA CLARITA VALLEY WATER AGENCY WILL UPDATE THEIR GROUNDWATER FLOW MODEL TO BETTER DESCRIBE THE RECHARGE AND STORAGE PATHS IN KEY AQUIFERS IN THE UPPER SANTA CLARA RIVER VALLEY GROUNDWATER BASIN TO DETERMINE THE FUTURE RELIABILITY OF ITS AQUIFERS AND RECHARGING NEEDS. THIS UPDATED MODEL WILL BE USED TO CONDUCT SENSITIVITY TESTING OF A POTENTIAL OPERATIONAL ALTERNATIVES FOR GROUNDWATER PUMPING AND THE PERFORMANCE OF THE SYSTEM DUE TO CLIMATE CHANGE IMPACTS. IT IS EXPECTED THAT THE IMPROVED UNDERSTANDING OF THE GROUND WATER BASIN DUE TO THIS STUDY WILL ALLOW FOR WATER MANAGERS TO IDENTIFY STRATEGIES TO OFFSET EXPECTED FUTURE DECLINES IN AVAILABLE GROUNDWATER SUPPLIES WITHIN THE BASIN. | CA | SANTA CLARITA VALLEY WATER AGENCY | $363K | — |
| BOOSTER PUMP ENG-TIER 4 EMISSION COMPLNT | AZ | EMPIRE SOUTHWEST, LLC | $214K | — |
| GC DE-WATERING PUMP FOR POWERHOUSE | AZ | AANTILIA LLC | $155K | — |
| PUMPING - GUARD RESTROOMS | AZ | 3 PEAKS GLASS, INC. | $32K | — |
| THE TOWN OF GILBERT, LOCATED NEAR PHOENIX, WILL INSTALL 38,642 ADVANCED METERING INFRASTRUCTURE (AMI) METERS AND RADIOS FOR RESIDENTIAL CUSTOMERS, WHICH WILL BE CONNECTED TO THE CITYS AMI RADIO NETWORK, ALONG WITH A CUSTOMER PORTAL. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 2,172 ACRE-FEET BY PROVIDING CUSTOMERS WITH DETAILED USAGE AND LEAK DETECTION INFORMATION ON A NEAR REAL-TIME BASIS. THE CITY RELIES ON TREATED WATER FROM THE COLORADO RIVER AND SUPPLEMENTS ITS SUPPLIES WITH GROUNDWATER WELLS TO MEET DEMANDS DURING SUMMER PEAKS AND PLANNED WATER TREATMENT PLANT OUTAGES. THE CONVERSION TO AMI METERS WILL HELP THE CITY OFFSET ITS GROUNDWATER PUMPING AND CONTINUE TO MEET ITS WATER DEMANDS. | AZ | TOWN OF GILBERT TOWN HALL | $1.9M | — |
| THE HOPI VILLAGE OF OLD ORAIBI ORAYVI IS CONSIDERED THE OLDEST CONTINUOUSLY INHABITED SETTLEMENT IN NORTH AMERICA HOPI TRIBAL MEMBERS LIVING IN ORAYVI DO NOT HAVE PIPED WATER AND SEWER TO THEIR HOMES MOST HOMES DO NOT HAVE ELECTRICITY, AND 72 OF 77 HOMES IN ORAYVI LACK ANY TYPE WATER AND SEWER FACILITIES RESIDENT S HAUL WATER FROM A SPIGOT AT THE HOPI VETERANS MEMORIAL CENTER HVMC LOCATED OVER 5 MILES AWAY FROM THE VILLAGE USING A VARIETY OF CONTAINERS RESIDENTS ARE LIMITED IN THEIR CAPACITY TO HAUL WATER AS MANY ARE ELDERS AND OTHERS DO NOT HAVE TRUCKS AND WATER TRAILERS IN 2020, THE ORAVYI VILLAGE BOARD BOARD WAS SUCCESSFUL IN SECURING CARES FUNDS TO SUBCONTRACT WITH HOPI UTILITIES CORPORATION HUC TO DRILL A WELL FOR THE COMMUNITY TODAY, THE WATER IS NOT RATED SAFE DRINKING WATER BY EPA STANDARDS INDIAN HEALTH SERVICES IHS HAS SUBMITTED AN APPLICATION TO IHS HEADQUARTERS TO SECURE ARPA FUNDS, AND IF AWARDED, THE FUNDS WILL BE USED TO BEGIN THE PLANNING PROCESS TO INSTALL A CHLORINATION SYSTEM, A PERMANENT TANK, A WASHETERIA AND A LAGOON ALTHOUGH THE WELL DRILLING WAS COMPLETED, IT DID NOT PROVIDE A WATER TANK, WATER LINES NOR A SPIGOT ONCE AGAIN, THE BOARD SECURED ADDITIONAL CARES FUNDS TO INSTALL A THREE PHASE GENERATOR, PROPANE TANK, AND TEMPORARY WATER TANK TO PUMP WATER FROM THE WELL VILLAGE SECURITY ROUTINELY TURN ON AND OFF THE GENERATOR TO FILL THE TEMPORARY WATER TANK THAT IS BEING USED BY OUR LOCAL RANCHERS AND FARMERS THE EXISTENCE OF THIS NEW WATER SOURCE HAS BEEN A RESOURCE TO LOCAL FARMERS AND RANCHERS HOWEVER, THE CONSTANT NEED TO TURN ON AND OFF THE GENERATORS HAS TAKEN A TOLL ON SECURITY STAFF DURING THE EXTREME HEAT AT TIMES THE BATTERY GOES DEAD, AND THE BATTERY HAS TO BE RECHARGED OR JUMPED TO START THE GENERATOR THIS TASK WILL BECOME MORE BURDENSOME FOR SECURITY ONCE WINTER ARRIVES AS A RESULT, A RELIABLE THREE PHASE POWER SOURCE IS WILL BE BUILT AND CONNECTED TO THE WELL UNDER THIS AGREEMENT, THE RECIPIENT SHALL UPGRADE 1 5 TO 2 MILES OF EXISTING POWER INFRASTRUCTURE TO THREE PHASE POWER THE RECIPIENT WILL THEN EXTEND A NEW LINE TO THE WELL SITE, INSTALL A METER BOX AND A POWER POLE AT THE WELL SITE, AND TIE THIS NEW POWER LINE TO THE CLOSEST EXISTING THREE PHASE POWER SOURCE THE PROJECT IS LOCATED IN THE OLD ORAIBI COMMUNITY IN NAVAJO COUNTY, ARIZONA WITHIN THE HOPI RESERVATION | AZ | HOPI TRIBE | $462K | — |
| THE OBJECTIVE OF THIS EFFORT IS TO PURCHASE TWO MINI-SPLIT STYLE DUCTLESS AIR CONDITIONER/HEAT PUMP SYSTEMS FOR SUPPLEMENTAL TEMPERATURE ADJUSTMENT OF UNDER VENTILATED WORKSPACES. | CO | OCEAN AC, INC | $11K | — |
| THE COCONINO PLATEAU WATERSHED PARTNERSHIP IN NORTHERN ARIZONA IS AN ENGAGED GROUP OF DIVERSE PARTICIPANTS REPRESENTING COCONINO COUNTY, GRAND CANYON AND OTHER NATIONAL PARKS, RANCHERS, NAVAJO, HAVASUPAI, WATER PROVIDERS, LANDOWNERS, COCONINO NATURAL RESOURCES CONSERVATION DISTRICT, SIERRA CLUB, COCONINO COUNTY AND THE CITY OF FLAGSTAFF, LOCAL, STATE, AND FEDERAL AGENCIES, NEIGHBORING WATERSHED PARTNERSHIPS, AND COMMUNITIES ACROSS THE COCONINO PLATEAU. IN THIS AREA, ACCESS TO THE REGIONAL WATER SUPPLIES OF THE COCONINO AND REDWALL MUAV AQUIFERS VARIES GREATLY AMONG COMMUNITIES. AREAS WITHIN THE COCONINO PLATEAU ARE POPULAR RECREATION AND TOURIST DESTINATIONS. AS GROUNDWATER LEVELS DECLINE, THE PARTNERSHIP REMAINS CONCERNED AND FOCUSED ON EFFORTS TO COOPERATIVELY MANAGE AND PROTECT THE AQUIFERS FROM OVER PUMPING BY LARGER USERS OR AS A RESULT OF GROWTH DUE TO THE POPULARITY OF THE FLAGSTAFF AREA. OVERALL, THE OBJECTIVES OF THE PARTNERSHIP S PROJECT WORK INCLUDE SUSTAINABLE WATER USE TO MEET THE NEEDS OF DOMESTIC USES IN RURAL AND TRIBAL AREAS THOUGHTFUL GROWTH FOR LARGER COMMUNITIES ACKNOWLEDGING THE CULTURAL SIGNIFICANCE OF WATER SOURCES AND MAINTAINING THE ENVIRONMENTAL FLOW NEEDS OF STREAMS AND SPRINGS. THE FOLLOWING PROJECTS AND ACTIVITIES SUPPORT THESE OBJECTIVES COMPILATION OF COCONINO PLATEAU WATER DEMAND DATA, COMPLETION OF GROUNDWATER MODELING SIMULATIONS FOR SUSTAINABILITY, DEVELOPMENT OF AN ECOSYSTEM SERVICES DATA DASHBOARD, CONDUCTING INFORMATIVE PUBLIC OUTREACH, AND UPDATING A WATER ETHICS PROGRAM. EACH PROJECT AND ACTIVITY WILL TAKE INTO ACCOUNT THE IMPACTS OF PROLONGED SEVERE AND EXTREME DROUGHT CONDITIONS ON THE COCONINO PLATEAU. | AZ | COCONINO PLATEAU WATERSHED PARTNERSHIP | $155K | — |
| TOHLAKAI PUMPING PLANT (TPP) FIBER OPTIC INSTALL | NM | RUTHERFORD DIVERSIFIED INDUSTRIES INC | $52K | — |
| PUMP VAULT TOILETS | NV | KINGMAN SEPTIC PUMPING, LLC | $5K | — |
| THE UNITED STATES BUREAU OF RECLAMATION NORTHERN CALIFORNIA AREA OFFICE (NCAO) HAS A NEED TO REFURBISH OF (4) EXISTING JET PUMP ASSEMBLIES BACK TO THE DESIGN CRITERIA SPECIFICATIONS. | CA | WILLIAMSVILLE RESOURCES II, INC. | $527K | — |
| BGNDRF REPLACEMENT OF 15 TON HEAT PUMP | NM | FOUR WINDS MECHANICAL HTC/AC INC. | $104K | — |
| EO 14398 - RG-EBHD LIFT STATION PUMPING | NM | TALON SEPTIC LLC | $143K | — |
| NGWSP PUMPING PLANT 1 | NM | AMES FEDERAL CONTRACTING GROUP LLC | $61.8M | — |
| SAN JUAN LATERAL PUMPING PLANTS NO. 4 & 7 | NM | ARCHER WESTERN CONSTRUCTION, LLC | $51.3M | — |
| PUMPING PLANT 4&7 ELECTRIC SERVICE | NM | NAVAJO TRIBAL UTILITY AUTHORITY | $332K | — |
| PUMPING PLANT 2&3 ELECTRIC SERVICE | NM | NAVAJO TRIBAL UTILITY AUTHORITY | $310K | — |
| CRPP PUMP RELOCATE | OR | K & N ELECTRIC MOTORS INC | $20K | — |
| BRACKISH GROUNDWATER NATIONAL DESALINATION RESEARCH FACILITY HEAT PUMP (ACU-01) REPAIR SERVICE | NM | CONCEPT CREATIVE SOLUTIONS INC | $9K | — |
| THE CITY OF GALLUP WATER & SANATATION DEPARTMENT IN MCKINLEY COUNTY, NEW MEXICO, WILL CONTRCUST A NEW WATER PRODUCTION WELL FOR THE NAVAJO GALLUP WATER SUPPLY PROJECT INTERM CONJUNCTIVE WATER SUPPLY. THE NEW WELL WILL ADD APROX. 2170 ACRE-FEET PER TEN YEARS OF LOACAL, HIGH-QUALITY WATER TO THE CITY'S AND REGIONS DRINKING WATER SUPPLY. THE NAVAJO GALLUP WATER SUPPLY PROJECT WORK ALSO INCLUDES IMPROVING STORAGE TANKS, WATER LINES, PUMP STATIONS AND TREATMENT PLANT COMPONENTS.SECTION 9504(A) OF THE SECURE WATER ACT, SUBTITLE F OF TITLE IX OFTHE OMNIBUS PUBLIC LAND MANAGEMENT ACT OF 2009, PUBLIC LAW(P.L.) 111-11 (42 UNITED STATES CODE (U.S.C.) 10364), AS AMENDED,AND THE FISH AND WILDLIFE COORDINATION ACT, 16 U.S.C. 661-666C, ASDELEGATED TO RECLAMATION IN DEPARTMENTAL MANUAL 255 DM 1.1B. | NM | CITY OF GALLUP | $2.0M | — |
| OPTIMIZED DIVERSION PRECISION AT THE CROOKED RIVER PUMP STATION | OR | NORTH UNIT IRRIGATION DISTRICT | $116K | — |
| THIS PROJECT IS DESIGNED TO INCREASE THE CURRENT UNDERSTANDING OF BRACKISH GROUNDWATER AVAILABILITY IN SOUTHERN NEW MEXICO AND TO EVALUATE THE FEASIBILITY OF DESALINATING BRACKISH GROUNDWATER USING GREEN ENERGY FOR THE PURPOSE OF AUGMENTING WATER-SUPPLY AVAILABILITY IN THE LOWER RIO GRANDE VALLEY REGION IN NEW MEXICO.THIS WILL BE EXECUTED IN THREE MAIN PHASES: PHASE I - PERFORM A DESKTOP STUDY TO AUGMENT AND INCREASE UNDERSTANDING OF POTENTIAL SOURCE AQUIFERS FOR BRACKISH WATER ON THE EAST AND WEST SIDES OF THE RIO GRANDE IN SOUTHERN NEW MEXICO.PHASE I OUTCOMES. RANKING OF SOUTHERN NEW MEXICO S AVAILABLE BRACKISH GROUNDWATER AQUIFERS, WITH ESTIMATES OF ANNUAL PRODUCTION CAPACITIES AND VIABLE PUMPING TIMELINE HORIZONS. PHASE II - EVALUATE THE FEASIBILITY OF LOCATING, BUILDING, AND OPERATING A DESALINATION FACILITY.PHASE II OUTCOMES: A RANKED SET OF AT LEAST THREE POTENTIAL DESALINATION PLANT ALTERNATIVES, WITH CONCEPTUAL COSTS. PHASE ILL - EVALUATE THE FEASIBILITY OF OPERATING THE DESALINATION FACILITY WITH GREEN ENERGY SUCH AS SOLAR POWER.PHASE III OUTCOMES: FEASIBILITY ANALYSIS TO DETERMINE IF THERE IS A REASONABLE PROBABILITY TO POWER THE PROPOSED DESALINATION PLANT USING GREEN ENERGY SUCH AS SOLAR. | NM | STATE ENGINEER, NEW MEXICO OFFICE OF THE | $300K | — |
| DELIVERY ORDER NO. 5 PUMP/MOTOR TO (MSCP) | AZ | PHOENIX PUMPS INC | $117K | — |
| FOLSOM PUMPING PLANT VARIABLE FREQUENCY DRIVES (VFD) REPLACEMENT FOR PUMPS 7 AND 8 MOTORS | CA | REHBEIN ENTERPRISES INC | $1.9M | — |
| IGF::OT::IGF ECHO #2 AND #3 PUMP REPAIRS | WA | EASTSIDE ELECTRIC MOTORS | $8K | — |
| EFO HEAT PUMP #36 REPLACEMENT | WA | BASIN REFRIGERATION & HEATING, INC. | $13K | — |
| MRG SFD RM60 SOIL CEMENT & PUMP TRUCK | NM | AMERICAN CLASSIC CONSTRUCTION INC. | $118K | — |
| WY- SEWAGE PUMPING FOR POWERPLANTS | WY | JW ELEMENTS LLC | $81K | — |
| CHILLER PUMP AND CONTROL BOARD | PA | SP INDUSTRIES INC | $12K | — |