Utah pumping contracts

6 contracts tracked across 1 municipality.

Contracts
6
municipalities
1
Distinct vendors
5

municipalities with the most pumping contracts

Top vendors in Utah pumping

VendorContractsVolume
WASTE AND WATER LOGISTICS, LLC2$40K
WEBBS SELECT-A-SERVICE INC1$13K
CLINTON CITY CORPORATION1$2.0M
WHEELER MACHINERY CO1$20K
NIBLEY CITY OFFICE1$400K

Recent pumping contracts in Utah

TitlemunicipalityVendorValueSolicitation
FG POWERPLANT SEWER PUMPINGUtah (Bureau of Reclamation federal awards)WEBBS SELECT-A-SERVICE INC$13K—
PROVO RIVER RESTORATION VAULT RESTROOM PUMPINGUtah (Bureau of Reclamation federal awards)WASTE AND WATER LOGISTICS, LLC$20K—
CLINTON CITY (CITY), IN DAVIS COUNTY, UTAH WILL IMPLEMENT A SUPPLEMENTAL WATER SUPPLY PROJECT TO INCREASE WATER SUPPLIES AND STORAGE CAPACITY TO REDUCE THE CITYS DROUGHT VULNERABILITIES. THE CITY HAS ACQUIRED THE WATER RIGHT TO PUMP 585 ACRE-FEET OF GROUNDWATER PER YEAR TO OFFSET DROUGHT IMPACTS. WITH THIS PROJECT, THE CITY WILL CONSTRUCT A WELL TO ACCESS THE 585 ACRE-FEET AND WILL BUILD A STORAGE TANK TO MANAGE AND REGULATE THE DISTRIBUTION OF THE PUMPED GROUNDWATER. THE ADDITIONAL SUPPLY AND STORAGE WILL INCREASE THE CITY S ABILITY TO PROVIDE WATER TO RESIDENTS DURING DROUGHT WHEN SURFACE WATER ALLOCATIONS ARE REDUCED. THIS PROJECT IS PRIORITIZED IN CLINTON CITY S 2021 DROUGHT RESILIENCY PLAN.Utah (Bureau of Reclamation federal awards)CLINTON CITY CORPORATION$2.0M—
VAULT TOILET PUMPING - PROVO RECREATIONUtah (Bureau of Reclamation federal awards)WASTE AND WATER LOGISTICS, LLC$21K—
HYDRAULIC PUMP REPAIRUtah (Bureau of Reclamation federal awards)WHEELER MACHINERY CO$20K—
NIBLEY CITY, LOCATED IN CACHE COUNTY, UTAH, WILL COMPLETE A 90% FINAL DESIGN PACKAGE FOR A NEW CULINARY WATER WELL AND A TWO-MILLION-GALLON WATER STORAGE TANK TO PROVIDE A MORE RELIABLE WATER SUPPLY. EXTENDED PERIODS OF DROUGHT HAVE LED TO REDUCED GROUND WATER RECHARGE, LOWER WELL YIELDS, AND INCREASED COMPETITION FOR LIMITED WATER RESOURCES. THE CITY HAS EXPERIENCED SEVERE DROUGHT CONDITIONS OR WORSE ROUGHLY 54% OF THE TIME IN THE PAST SIX YEARS. THE NEW WELL AND TANK WILL ADDRESS THE WATER DEFICIENCIES DUE TO POPULATION GROWTH IN ADDITION TO IMPROVING RELIABILITY, REDUNDANCY, WATER SECURITY, AND DROUGHT RESILIENCY. THE 2020 MASTER PLAN IDENTIFIED A WELL, TANK, AND POTENTIAL BOOSTER PUMP STATION AS A PRIORITY TO ADDRESS THE DEFICIENCIES IN WATER AND STORAGE CAPACITY.Utah (Bureau of Reclamation federal awards)NIBLEY CITY OFFICE$400K—