California pumping contracts

43 contracts tracked across 1 municipality.

Contracts
43
municipalities
1
Distinct vendors
37

municipalities with the most pumping contracts

Top vendors in California pumping

VendorContractsVolume
REHBEIN ENTERPRISES INC2$3.2M
KOFFLER ELECTRICAL MECHANICAL APPARATUS REPAIR INC2$37K
LONG BEACH, CITY OF2$200K
SANTA ANA, CITY OF2$3.3M
D&M PUMPING LLC2$65K
AGUA CALIENTE BAND OF CAHUILLA INDIANS2$203K

Recent pumping contracts in California

TitlemunicipalityVendorValueSolicitation
THE SANTA CLARITA VALLEY WATER AGENCY WILL UPDATE THEIR GROUNDWATER FLOW MODEL TO BETTER DESCRIBE THE RECHARGE AND STORAGE PATHS IN KEY AQUIFERS IN THE UPPER SANTA CLARA RIVER VALLEY GROUNDWATER BASIN TO DETERMINE THE FUTURE RELIABILITY OF ITS AQUIFERS AND RECHARGING NEEDS. THIS UPDATED MODEL WILL BE USED TO CONDUCT SENSITIVITY TESTING OF A POTENTIAL OPERATIONAL ALTERNATIVES FOR GROUNDWATER PUMPING AND THE PERFORMANCE OF THE SYSTEM DUE TO CLIMATE CHANGE IMPACTS. IT IS EXPECTED THAT THE IMPROVED UNDERSTANDING OF THE GROUND WATER BASIN DUE TO THIS STUDY WILL ALLOW FOR WATER MANAGERS TO IDENTIFY STRATEGIES TO OFFSET EXPECTED FUTURE DECLINES IN AVAILABLE GROUNDWATER SUPPLIES WITHIN THE BASIN.California (Bureau of Reclamation federal awards)SANTA CLARITA VALLEY WATER AGENCY$363K—
THE UNITED STATES BUREAU OF RECLAMATION NORTHERN CALIFORNIA AREA OFFICE (NCAO) HAS A NEED TO REFURBISH OF (4) EXISTING JET PUMP ASSEMBLIES BACK TO THE DESIGN CRITERIA SPECIFICATIONS.California (Bureau of Reclamation federal awards)WILLIAMSVILLE RESOURCES II, INC.$527K—
FOLSOM PUMPING PLANT VARIABLE FREQUENCY DRIVES (VFD) REPLACEMENT FOR PUMPS 7 AND 8 MOTORSCalifornia (Bureau of Reclamation federal awards)REHBEIN ENTERPRISES INC$1.9M—
BUREAU OF RECLAMATION, NORTHERN CALIFORNIA AREA OFFICE SHASTA PUMPING PLANT 400 HORSEPOWER MOTOR REPLACEMENTCalifornia (Bureau of Reclamation federal awards)KOFFLER ELECTRICAL MECHANICAL APPARATUS REPAIR INC$33K—
DMC INTERTIE PUMP UNITS 3 AND 4 INSTALLATIONCalifornia (Bureau of Reclamation federal awards)UNICO MECHANICAL CORP.$1.4M—
TO INSPECT, REPAIR, AND COMMISSION PUMPS 2, 4, 5 AND 6 AT THE FOLSOM PUMPING PLANT IN FOLSOM, CACalifornia (Bureau of Reclamation federal awards)DXP ENTERPRISES, INC.$507K—
REPAIR UTILITY PUMP MOTORCalifornia (Bureau of Reclamation federal awards)KOFFLER ELECTRICAL MECHANICAL APPARATUS REPAIR INC$4K—
AWARD PURPOSE: THE CITY WILL CONSTRUCT THE AWPS AT THE REGIONAL WATER QUALITY CONTROL PLANT (RWQCP) TO FURTHER TREAT A PORTION OF THE EFFLUENT THROUGH MEMBRANE FILTRATION FOLLOWED BY REVERSE OSMOSIS (RO). THE PROJECT WILL RESULT IN IMPROVED RECYCLED WATER QUALITY WITH REDUCED LEVELS OF TOTAL DISSOLVED SOLIDS (TDS), WHICH IS INTENDED TO ENCOURAGE INCREASED RECYCLED WATER USE. THE AWPS WILL BE CONSTRUCTED IN TWO PHASES. UPON COMPLETION OF BOTH, IT IS EXPECTED TO OFFSET POTABLE SUPPLIES BY 3,100 ACRE-FEET PER YEAR BY PROVIDING ENHANCED RECYCLED WATER TO LOCAL USERS WHO WOULD OTHERWISE USE POTABLE WATER TO MEET THEIR RECYCLED WATER DEMANDS.ACTIVITIES TO BE PERFORMED: PALO ALTOS PRIMARY OBJECTIVE FOR THE PROJECT IS TO IMPROVE THE QUALITY OF ITS EXISTING AND FUTURE RECYCLED WATER BY REDUCING TDS THROUGH AN ADVANCED WATER PURIFICATION SYSTEM. THE OBJECTIVE IS TO REDUCE TDS FROM ITS EXISTING 770-1,100 MILLIGRAMS PER LITER (MG L) TO 400-500 MG L IN THE PRODUCT WATER. THIS WILL ENCOURAGE RECYCLED WATER USE AND ATTRACT NEW RECYCLED WATER USERS. ITS SECONDARY OBJECTIVE IS TO PRODUCE ADVANCED TREATED WATER SUITABLE FOR POTABLE REUSE.PROJECTED DELIVERABLES OR OUTCOMES: OBJECTIVE 1: PLANNING AND DESIGN. OBJECTIVE 1 OUTCOMES: COMPLETION OF FINAL DESIGN OF THE AWPS AND ENGINEERING SERVICES DURING BIDDING AND CONSTRUCTION. OBJECTIVE 2: ENVIRONMENTAL AND PERMITTING. OBJECTIVE 2 OUTCOMES: COMPLETION OF ENVIRONMENTAL DOCUMENTATION INCLUDING COORDINATION WITH RECLAMATION TO DETERMINE NEPA COVERAGE. OBJECTIVE 3: CONSTRUCTION. OBJECTIVE 3 OUTCOMES: CONSTRUCTION OF THE PHASE 1 AWPS, INCLUDING MEMBRANE FILTRATION EQUIPMENT, REVERSE OSMOSIS EQUIPMENT, AND ONE STORAGE TANK.. OBJECTIVE 4: PROGRAM MANAGEMENT AND ADMINISTRATION. OBJECTIVE 4 OUTCOMES: ADMINISTRATIVE PROGRAM MANAGEMENT OVERSIGHT OF CONSULTANTS, CONTRACTORS, DESIGN ENGINEER, AND CONSTRUCTION CONTRACTORS COORDINATION WITH PROJECT PARTNERS PROJECT MANAGEMENT GRANT ADMINISTRATION, INCLUDING CONTRACTING, QUARTERLY REPORTING, AND INVOICING AND LEGAL AND ADMINISTRATIVE SERVICES THROUGHOUT THE DURATION OF THE PROJECT.INTENDED BENEFICIARIES: BY REDUCING DEMANDS ON GROUNDWATER (CURRENT AND POTENTIAL FUTURE), GROUNDWATER LEVELS ARE LESS AT RISK, REDUCING THE POTENTIAL FOR PROBLEMS ASSOCIATED WITH DECREASED GROUNDWATER LEVELS, SUCH AS SUBSIDENCE. SUBSIDENCE DAMAGES STRUCTURES AND INFRASTRUCTURE, DECREASES PROPERTY VALUE, AND INCREASES THE NEED TO SECURE OTHER WATER SUPPLIES FOR EMERGENCY SERVICES. IT ALSO REDUCES THE FUTURE VALUE OF THE AQUIFER BY PERMANENTLY REDUCING THE AQUIFERS CAPACITY. GROUNDWATER QUALITY DEGRADATION (FROM CONTINUED GROUNDWATER PUMPING OR RECHARGE WITH HIGH TDS WATER) COULD IMPACT COSTS OF EMERGENCY GROUNDWATER BECAUSE OF POTENTIAL ADDITIONAL TREATMENT REQUIREMENTS OR REDUCE AVAILABILITY OF GROUNDWATER FOR POTABLE USE.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N ACalifornia (Bureau of Reclamation federal awards)CITY OF PALO ALTO$12.9M—
LONG BEACH WATER DEPARTMENT (DEPARTMENT), LOCATED IN LONG BEACH, CALIFORNIA, WILL DEVELOP AND UTILIZE TOOLS AND TECHNOLOGY TO MAXIMIZE GROUNDWATER WITHDRAWAL SUSTAINABLY AND RELIABLY. THE PROJECT INCLUDES THE DEVELOPMENT OF THE TOOLS AND PROCEDURES NECESSARY TO MONITOR WELLFIELD OPERATIONS EFFECTIVELY, ASSESS CRITICAL FACTORS AFFECTING CURRENT AND FUTURE GROUNDWATER PRODUCTION, AND PROVIDE THE FOUNDATIONS FOR PROACTIVE DECISION MAKING. THROUGH COMPLETION OF THE PROJECT, THE DEPARTMENT WILL IMPROVE ACCESS AND USE OF WATER RESOURCES DATA, DEVELOP A DIGITAL WATER MANAGEMENT TOOL TO HELP PROVIDE SHORT AND LONG TERM ESTIMATES OF GROUNDWATER PUMPING TO IMPROVE MODELING AND FORECASTING CAPABILITIES, AND PERFORM REAL TIME ANALYTICS. IMPROVED KNOWLEDGE ABOUT GROUNDWATER WILL INCREASE AND IMPROVE THE UTILIZATION OF LOCAL WATER RESOURCES, MAXIMIZING ALLOWABLE PUMPING RATES FROM THE AQUIFER, REDUCING WATER IMPORTS, AND ASSISTING IN THE SUSTAINABLE MANAGEMENT OF GROUNDWATER RESOURCES.California (Bureau of Reclamation federal awards)LONG BEACH, CITY OF$200K—
THE CITY OF SANTA ANA WILL CONSTRUCT THE NEW FLOWER STREET WELL TO AUGMENT THE LOW PRESSURES IN THE WATER SYSTEM BY PUMPING GROUNDWATER INTO THE CITY'S EXISTING WATER DISTRIBUTION SYSTEM AT A STRATEGIC LOCATION. IMPLEMENTATION OF THIS PROJECT WILL INCREASE LOCAL SUPPLIES BY OVER 4,032 ACRE-FEET PER YEAR. THIS PROJECT WILL HELP THE CITY DIVERSIFY ITS WATER SUPPLY AND IMPROVE WATER MANAGEMENT BY ENHANCING SYSTEM FLEXIBILITY. WATER DIVERSIFICATION IS SUPPORTED BY THE CITY'S DROUGHT ACTION PLAN.California (Bureau of Reclamation federal awards)SANTA ANA, CITY OF$1.5M—
1. AWARD PURPOSE -RECLAMATION OPERATES THE CENTRAL VALLEY PROJECT (CVP) IN CLOSE COORDINATION WITH THE CALIFORNIA DEPARTMENT OF WATER RESOURCES (DWR), WHICH OPERATES THE STATE WATER PROJECT (SWP). UNDER SEVERAL WATER RIGHTS PERMITS ISSUED TO RECLAMATION AND DWR BY THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD, THE CVP AND SWP DIVERT WATER FROM THE SOUTHERN DELTA VIA PUMPING FACILITIES LOCATED IN TRACY, CA AND BYRON, CA. THESE PERMITS, SPECIFICALLY WATER RIGHTS DECISION D-1641 (D-1641), REQUIRE RECLAMATION AND DWR TO MAINTAIN A NETWORK OF DISCRETE AND CONTINUOUS MONITORING STATIONS COLLECTIVELY KNOWN AS THE ENVIRONMENTAL MONITORING PROGRAM (EMP). D-1641 SPECIFIES WHERE THESE STATIONS ARE TO BE LOCATED AND WHAT IS TO BE MONITORED THERE: WATER QUALITY (CONTINUOUS AND DISCRETE), PHYTOPLANKTON, ZOOPLANKTON, AND BENTHIC INVERTEBRATES.2. ACTIVITIES TO BE PERFORMED - THE PRIMARY OBJECTIVE OF THIS PROJECT IS TO CONDUCT AND MANAGE EMP MONITORING DATA, ANALYSES, QUALITY ASSURANCE, QUALITY CONTROL, AND COMMUNICATION PRODUCTS TO STAKEHOLDERS TO FURTHER UNDERSTANDING OF THE ESTUARINE ECOLOGY AND FACILITATE THE MANAGEMENT AND CONSERVATION OF THE UPPER SAN FRANCISCO ESTUARY.3. EXPECTED DELIVERABLE OR OUTCOME - THE PRINCIPAL ACTIVITIES TO BE FUNDED THROUGH THIS ACTION INCLUDE: MONTHLY DISCRETE WATER QUALITY SAMPLING AT 24 FIXED AND UP TO FOUR FLOATING SITES THROUGHOUT THE ESTUARY. MONTHLY DISCRETE SAMPLING FOR PHYTOPLANKTON (24 FIXED AND UP TO FOUR FLOATING SITES), ZOOPLANKTON (UP TO 20 FIXED AND FOUR FLOATING SITES) AND BENTHOS (TEN FIXED SITES). CONTINUOUS WATER QUALITY MONITORING AT 15 FIXED STATIONS. QUALITY ASSURANCE PROJECT PLANS (QAPPS) FOR DISCRETE WATER QUALITY MONITORING, BIOLOGICAL MONITORING, AND CONTINUOUS MONITORING. ANNUAL REPORTING OF RESULTING DATA TO STATE WATER RESOURCES CONTROL BOARD (SWRCB).4. INTENDED BENEFICIARY(IES) -THE RECIPIENT MUST MEET THE REQUIREMENTS OF WATER RIGHT DECISION D-1641 AND WORKS IN CLOSE COORDINATION AND COLLABORATION WITH RECLAMATION TO MAINTAIN THE EMP. THE RECIPIENT HAS PROPOSED TO RECLAMATION TO PROVIDE THE TECHNICAL SKILLS, EQUIPMENT AND FACILITIES NEEDED TO MAINTAIN THE EMP. THE DATA COLLECTED AND KNOWLEDGE GAINED THROUGH THE EMP HELPS THE RECIPIENT FULFILL ITS MISSION TO SUSTAINABLY MANAGE THE WATER RESOURCES OF CALIFORNIA, IN COOPERATION WITH OTHER AGENCIES, TO BENEFIT THE STATE PEOPLE AND PROTECT, RESTORE, AND ENHANCE THE NATURAL AND HUMAN ENVIRONMENTS.5. SUBRECIPIENT ACTIVITIES -THERE ARE NO SUBRECIPIENTS FOR THIS AGREEMENT.California (Bureau of Reclamation federal awards)STATE OF CALIFORNIA DEPARTMENT OF WATER RESOURCES$8.4M—
FOLSOM DROUGHT 30 CFS PUMPING SYSTEMCalifornia (Bureau of Reclamation federal awards)REHBEIN ENTERPRISES INC$1.4M—
NEW MELONES RECREATION AREA - SERVICE & MAINTENANCE OF RESTROOM AND SEPTIC PUMPINGCalifornia (Bureau of Reclamation federal awards)EL DORADO SEPTIC SERVICE, INC$497K—
CT FUP PUMP 3 LEAD & ASBESTOS WORKCalifornia (Bureau of Reclamation federal awards)JM ENVIRONMENTAL, INC.$493K—
PUMP AND MOTORCalifornia (Bureau of Reclamation federal awards)LOTUSUSA, INC.$150K—
SCCAO SEPTIC PUMPING SERVICES - BRADBURY SEPTIC SERVICES 2026-2027California (Bureau of Reclamation federal awards)D&M PUMPING LLC$40K—
EO 14398 PD-GOVERNOR OIL PUMP REHAB TO #5California (Bureau of Reclamation federal awards)HERITAGE HYDRO GOVERNOR SERVICE INC$38K—
CARPINTERIA VALLEY WATER DISTRICT (DISTRICT) IS PROPOSING TO CONSTRUCT AN AQUIFER STORAGE AND RECOVERY (ASR) COMPATIBLE WELL TO REPLACE THE FAILING SMILLIE WELL, LOCATED AT THE INTERSECTION OF LILLINGSTON CANYON ROAD AND CASITAS PASS ROAD. THE PROPOSED PROJECT WILL INCLUDE DEMOLITION OF THE EXISTING WELL SITE, CONSTRUCTION OF AN ASR CAPABLE REPLACEMENT WELL, PERMITTING OF THE NEW WELL FOR ASR OPERATIONS, AND DEVELOPMENT OF THE SITE TO EQUIP THE FACILITY FOR WELL EXTRACTION AND INJECTION. THE EXISTING SMILLIE WELL WILL BE CONVERTED TO A MONITORING WELL.ASR WELLS PROVIDE THE DISTRICT WITH THE OPTION TO STORE WATER IN THE CARPINTERIA GROUNDWATER BASIN (BASIN) DURING WET PERIODS FOR USE IN DRY PERIODS. THE WELL COULD INJECT UP TO 500 ACRE-FEET PER YEAR (AFY). THE WELL WILL ALSO INCREASE THE DISTRICTS RELIABLE NUMBER OF PRODUCTION WELLS FROM 2 TO 3 AND PROVIDE MUCH-NEEDED PRODUCTION CAPACITY. THE EXISTING SMILLIE WELL CAN ONLY PRODUCE 240 AFY WHILE THE NEW WELL IS EXPECTED TO PRODUCE UP TO 1,000 AFY (900 GPM), WHICH WOULD INCREASE THE DISTRICTS MONTHLY WELL PRODUCTION CAPACITY BY 27%. THE DISTRICT WOULD BE ABLE TO MEET CUSTOMER DEMAND DURING A STAGE 2 DROUGHT SOLELY FROM GROUNDWATER, IF NECESSARY. THE CARPINTERIA GROUNDWATER BASIN WAS DESIGNATED BY CALIFORNIA DEPARTMENT OF WATER RESOURCES (DWR) AS A HIGH PRIORITY BASIN UNDER THE SUSTAINABLE GROUNDWATER MANAGEMENT ACT (SGMA) IN 2019. THE BASIN GROUNDWATER SUSTAINABILITY PLAN (GSP) IDENTIFIES GROUNDWATER OVERDRAFT DURING EXTENDED DROUGHTS AS THE PRIMARY RISK FOR THE BASIN. THE GSP IDENTIFIED SEVERAL PROJECTS OR MANAGEMENT ACTIONS TO ADDRESS THE ISSUE, INCLUDING IMPLEMENTATION OF ASR WELLS TO STORE WATER DURING WET YEARS FOR USE DURING DRY YEARS AND PUMPING REDISTRIBUTION TO REDUCE THE RISK OF SEAWATER INTRUSION. THE DEVELOPMENT OF ASR WELLS WOULD PROVIDE A MEANS TO RECHARGE THE GROUNDWATER BASIN MORE QUICKLY THAN OTHER METHODS. REDISTRIBUTION OF PUMPING WAS IDENTIFIED AS MOVING PUMPING AWAY FROM THE COAST SO THAT WATER LEVELS WOULD REMAIN STABLE AT THE COAST AND REDUCE MOVEMENT OF SEAWATER INTO THE BASIN. THE SMILLIE WELL IS CURRENTLY THE MUNICIPAL WELL FURTHEST FROM THE COAST.California (Bureau of Reclamation federal awards)CARPINTERIA VALLEY WATER DISTRICT$2.9M—
THE MCMULLIN AREA GROUNDWATER SUSTAINABILITY AGENCY, LOCATED IN CENTRAL CALIFORNIA, WILL INSTALL A GROUNDWATER WELL MEASUREMENT AND MONITORING ARRAY WITH A TELEMETRICALLY SUPPORTED DATA COLLECTION SYSTEM TO IMPROVE WATER MANAGEMENT FOR ITS AGRICULTURAL CUSTOMERS. THE PROJECT INCLUDES THE INSTALLATION OF ELECTROMAGNETIC FLOW METERS WITH TELEMETRY AT 925 GROUNDWATER WELLS, ALONG WITH SIX WEATHER STATIONS LOCATED THROUGHOUT THE AGENCYS SERVICE AREA. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 20,508 ACRE-FEET AS A RESULT OF REDUCED PUMPING. THE KINGS GROUNDWATER SUB-BASIN, PART OF THE SAN JOAQUIN GROUNDWATER BASIN, IS THE MAIN SOURCE OF WATER FOR THE AGENCY AND THE PROJECT SUPPORTS ITS EFFORTS TO REDUCE GROUNDWATER OVERDRAFT BY AN ANNUAL AVERAGE OF OVER 90,000 ACRE-FEET.California (Bureau of Reclamation federal awards)MCMULLIN AREA GROUNDWATER SUSTAINABILITY AGENCY$2.8M—
SCCAO SEPTIC PUMPING SERVICES - TRACY FISH COLLECTION FACILITY CALL 0002California (Bureau of Reclamation federal awards)D&M PUMPING LLC$25K—
THE WESTLANDS WATER DISTRICT (DISTRICT), LOCATED IN THE SAN JOAQUIN VALLEY CALIFORNIA, WILL EXPAND ITS WESTLANDS ADVANCED METERING INFRASTRUCTURE (AMI) PROJECT BY INSTALLING AND UPGRADING 1,603 METERS ALONG ITS DISTRIBUTION SYSTEM. THE PROJECT WILL INSTALL 150 VICTAULIC METERS AND CONVERT 1,453 EXISTING MECHANICAL METERS INTO DIGITAL METERS WITH AMI CAPABILITIES. THE 1,603 METERS WILL BE INTEGRATED INTO THE DISTRICTS AMI SYSTEM, ALLOWING FOR NEAR REAL-TIME DATA AVAILABILITY. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 4,345 ACRE-FEET, CURRENTLY LOST TO UNIDENTIFIED LEAKS AND OVER DELIVERIES. CONSERVED WATER WILL BE USED TO OFFSET GROUNDWATER PUMPING IN A CRITICALLY OVER-DRAFTED GROUNDWATER BASIN, BOOSTING WATER SUPPLY RELIABILITY IN A DROUGHT PRONE AREA.California (Bureau of Reclamation federal awards)WESTLANDS WATER DISTRICT$1.8M—
CHARLES E. MEYER DESALINATION PLANT PRODUCT WATER PUMP STATION UPGRADES PROJECTCalifornia (Bureau of Reclamation federal awards)CITY OF SANTA BARBARA$1.5M—
THE HENRY MILLER RECLAMATION DISTRICT NO. 2131, LOCATED IN CENTRAL CALIFORNIA, WILL MODERNIZE THE PICK ANDERSON PUMP STATION AT THE NORTH END OF THE DISTRICTS SURFACE WATER CONVEYANCE SYSTEM. THE PROJECT INCLUDES UPGRADING TWO EXISTING SPILL STRUCTURES WITH AUTOMATIC GATES AND FLOW METERS, CONSTRUCTING A LONG-CRESTED WEIR, AND INSTALLING THREE NEW PUMPS. THE PROJECT ALSO INCLUDES LINING 5,560 FEET OF EARTHEN CANALS WITH A GEOMEMBRANE LINER AND CEMENT, AND THREE NEW SUPERVISORY CONTROL AND DATA ACQUISITION SITES FOR REMOTE MONITORING AND AUTOMATED PUMPING CONTROL. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 3,162 ACRE-FEET, CURRENTLY LOST TO SEEPAGE, OVER-PUMPING, AND OPERATIONAL SPILLS. CONSERVED WATER WILL REDUCE THE NEED FOR DEEP WELL PUMPING AND ALLOW WATER TO REMAIN IN THE SAN JOAQUIN RIVER.California (Bureau of Reclamation federal awards)HENRY MILLER RECLAIMATION DISTRICT 2131$1.5M—
THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR AND COMMISSION MOTOR 2 AT THE FOLSOM PUMPING PLANT TO ENSURE RELIABLE OPERATION OF THE PUMPING SYSTEM AND MAINTAIN CONTINUOUS WATER DELIVERY.California (Bureau of Reclamation federal awards)VALLEJO ELECTRIC MOTOR, INC$15K—
TRACY FISH COLLECTION FACILITY SEPTIC TANK PUMPING SERVICECalifornia (Bureau of Reclamation federal awards)PRO PUMPING LLC$5K—
PURPOSE: THE GENERAL SCOPE OF THE PROJECT ENTAILS THE INSTALLATION OF A MANGANESE DIOXIDE FILTRATION SYSTEM WITH PRE-OXIDATION AT PUMP STATION 345-1 TO REMOVE IRON, MANGANESE, AND HYDROGEN SULFIDE FROM THE GROUNDWATER PRIOR TO SERVING THE WATER TO THE PUBLIC. THE STATION S WATER CURRENTLY EXCEEDS SECONDARY MAXIMUM CONTAMINANT LEVELS (SMCLS) FOR THESE ELEMENTS, NECESSITATING THE INSTALLATION OF A WELLHEAD TREATMENT SYSTEM. THE CITY HAS SELECTED AN IRON AND MANGANESE REMOVAL SYSTEM FROM ATEC WATER SYSTEMS, WHICH WILL BE FURNISHED BY THE OWNER AND INSTALLED BY THE CONTRACTOR.ACTIVITIES TO BE PERFORMED: UNDER THIS AGREEMENT, THE RECIPIENT SHALL INSTALL A WELLHEAD TREATMENT SYSTEM TO REMOVE NATURALLY OCCURRING CONTAMINANTS FROM AN EXISTING MUNICIPAL POTABLE WATER SUPPLY WELL AND BRING THE WELL SYSTEM BACK ONLINE. THE WELLHEAD TREATMENT SYSTEM WILL INCLUDE TWO STATIC MIXERS WITH ASSOCIATED SODIUM HYPOCHLORITE AND SODIUM PERMANGANATE STORAGE AND INJECTION PROCESSES TO REMOVE HYDROGEN SULFIDE AND BALANCE CHLORINE LEVELS, AND A SIX-VESSEL MANGANESE DIOXIDE FILTRATION SYSTEM TO REMOVE ELEVATED LEVELS OF MANGANESE. PRIOR TO INSTALLATION, A CONCRETE PAD WILL BE INSTALLED TO SUPPORT THE TREATMENT SYSTEM COMPONENTS. ADDITIONALLY, ELECTRICAL IMPROVEMENTS FOR EQUIPMENT AND INSTRUMENTATION POWER WILL BE PERFORMED. THE TREATMENT SYSTEM WILL BE EQUIPPED WITH INSTRUMENTATION TO PROVIDE AN AUTOMATED SYSTEM THAT CAN BE CONTROLLED AND MONITORED BOTH LOCALLY AND FROM THE CITYS EXISTING SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SYSTEM. PROCESS AND SERVICE PIPING WILL BE INSTALLED TO CONVEY SPENT BACKWASH WATER RESULTING FROM SYSTEM OPERATIONS AND CONNECTED TO AN EXISTING CITY SEWER LINE LOCATED ON BURGAN AVENUE. THE WELL SITE IS SECURED WITH A SIX-FOOT CEMENT BLOCK WALL ENCLOSING THE ENTIRE SITE AND A SIX-FOOT WROUGHT IRON FENCE AS THE LONE ENTRY POINT. THE TREATMENT SYSTEM WILL BE LOCATED AT 185 S. BURGAN AVENUE, FRESNO, CALIFORNIA,DELIVERABLES AND EXPECTED OUTCOMES: THE INSTALLATION OF THE ATEC MANGANESE DIOXIDE FILTRATION SYSTEM WILL ENSURE THAT PUMP STATION 345-1 MEETS WATER QUALITY STANDARDS FOR IRON AND MANGANESE. THIS PROJECT WILL ENHANCE THE STATION S ABILITY TO DELIVER CLEAN WATER TO THE COMMUNITY, WITH THE CONTRACTOR RESPONSIBLE FOR EXECUTING THE INSTALLATION ACCORDING TO DESIGN SPECIFICATIONS AND REGULATORY REQUIREMENTS.BENEFICIARIES: THE PUBLICSUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N ACalifornia (Bureau of Reclamation federal awards)FRESNO, CITY OF$734K—
THE TRABUCO CANYON WATER DISTRICT (DISTRICT) PROVIDES PORTABLE WATER, RECYCLED WATER, AND WASTEWATER SERVICES TO A TOTAL POPULATION OF APPROXIMATELY 14,000. THE DISTRICT MANAGES A 66-MILE WATER DISTRIBUTION SYSTEM WITH APPROXIMATELY 4,118 SERVICE CONNECTIONS. THE DOVE AND TICK CREEK PUMP STATION IMPROVEMENTS DROUGHT RESILIENCY PROJECT WILL UPGRADE THE DOVE AND TICK CREEK PUMP STATIONS TO INCREASE CAPTURE OF BOTH DRY WEATHER RUNOFF AND STORMWATER (WET WEATHER FLOWS) TO PRODUCE 200 ACRE-FEET PER YEAR OF NEW NON-POTABLE WATER, DELIVERING WATER FROM ALTERNATIVE SOURCES, REDUCING LOCALIZED FLOODING, AND IMPROVING ECOSYSTEM BENEFITS TO DOWNSTREAM NATIVE HABITAT THROUGH REDUCED IMPACTS OF DRY WEATHER FLOWS.THE MAJOR COMPONENTS OF THE PROJECT INCLUDE BUT ARE NOT LIMITED TO: MODIFYING EXISTING BYPASS STRUCTURE TO MINIMIZE DEBRIS BUILDUPDEBRIS CAPTURE SYSTEM IMPROVEMENTS INSTALLATION OF PRECAST WET WELL TOP AND LID AT THE TICK CREEK PUMP STATIONINSTALLATION OF PRECAST WET WELL TOP AND LID AT THE TICK CREEK PUMP STATIONINSTALLATION OF TWO PUMPS AT THE TICK CREEK PUMP STATIONMODIFY DISCHARGE PIPING TO FACILITATE NEW PUMPS AND REPLACE FLOWMETERELECTRICAL UPGRADES, INCLUDING A LOCAL DISCONNECT AT TICK CREEK PUMP STATIONPROGRAMMING AND SYSTEM INTEGRATION AT THE TICK CREEK PUMP STATION NEW DESILTING BASIN AT TICK CREEK PUMP STATIONCHANNEL, INLET, APPROACH ENTRY, AND PIPING IMPROVEMENTS AT DOVE PUMP STATIONCalifornia (Bureau of Reclamation federal awards)TRABUCO CANYON WATER DISTRICT$578K—
THE VENTURA RIVER WATER DISTRICT (DISTRICT), LOCATED IN VENTURA COUNTY, CALIFORNIA, WILL INSTALL SOLAR FACILITIES AT TWO OF THE DISTRICTS PUMPING STATIONS TO INCREASE ENERGY EFFICIENCY IN WATER MANAGEMENT. THE FACILITIES ARE RATED FOR A COMBINED CAPACITY OF 414 KILOWATTS AND WILL DECREASE THE DISTRICT S RELIANCE ON FOSSIL FUELS AND CONTRIBUTE TO ITS PORTFOLIO OF RENEWABLE AND SUSTAINABLE WATER MANAGEMENT PRACTICES. THE PROJECT IS EXPECTED TO PROVIDE POWER FOR A MAJORITY OF THE DISTRICTS ENERGY DEMANDS.California (Bureau of Reclamation federal awards)VENTURA RIVER WATER DISTRICT$500K—
PURPOSE:THE PROPOSED PROJECT WILL ASSIST THE TRIBE TO DEVELOP, MANAGE, AND PROTECT THEIR WATER AND RELATED RESOURCES, AS AUTHORIZED BY PUBLIC LAW. ALSO, MAKING FUNDING AVAILABLE TO THE TRIBE FOR THE PROJECT, RECLAMATION IS HELPING THE TRIBE BECOME MORE SELF-SUFFICIENT AND SUSTAINABLE.ACTIVITIES TO BE PERFORMED:TASK 1: INSTALL WATER LEVEL TRANSDUCERS:WATER LEVEL DATALOGGERS WILL BE INSTALLED IN THE TWO TRIBAL WELLS TO AUTOMATICALLY AND CONTINUOUSLY RECORD FLUCTUATIONS IN WATER LEVEL IN THE WELL INCLUDING STATIC AND PUMPING WATER LEVELS TO DETERMINE AQUIFER PERFORMANCE AND BEHAVIOR DURING DROUGHT. WATER LEVEL DATA LOGS WILL BE STORED IN THE DATALOGGER S MEMORY AND WILL BE DOWNLOADED USING SOFTWARE, TO SMART DEVICE APP, TELEMETRY, OR ASSOCIATED DATA ACQUISITION SYSTEM. AN ABSOLUTE WATER LEVEL DATALOGGER WILL BE PREFERRED SINCE IT MEASURES BOTH WATER AND ATMOSPHERIC PRESSURE THEREFORE WATER LEVEL DATA NEEDS TO BE BAROMETRICALLY COMPENSATED.TASK 2: REHABILITATE EXISTING WATER STORAGE TANK:THE 274,00-GALLON WATER STORAGE IS OLD AND CORRODED WHICH COMPROMISE ITS INTEGRITY AND NEEDS UPGRADES TO CONTINUE SERVING THE TRIBAL COMMUNITY WITH WATER STORAGE FOR DRINKING WATER AND FIRE SUPPRESSION CAPACITY.HIS WILL COMPLETED BY FIRST CLEANING THE INTERIOR WATER STORAGE TANK AND REMOVING SLUDGE THAT HAS ACCUMULATED IN THE TANK. THEN, THE WATER STORAGE TANK WILL BE REHABILITATED. THIS PROCESS INVOLVES CORROSION CONTROL THROUGH CATHODIC PROTECTION AND PLUMBING REPAIRS, COATING, AND PAINTING.EXPECTED OUTCOME(S) DELIVERABLE(S):TASK 1 OUTCOMES:. TWO WATER LEVEL TRANSDUCERS INSTALLED IN THE WATER STORAGE TANKS.TASK 2 OUTCOMES: THE INTERIOR OF THE WATER STORAGE TANK WILL BE SAND BLASTED AND RECEIVE NEW ELASTOMERIC POLYURETHANE COATING. THE EXTERIOR OF THE WATER STORAGE TANK WILL HAVE HARDWARE REPLACED (IF WARRANTED), STEEL AND STRUCTURAL REPAIRS WELDS, AND HE EXTERIOR OVERCOATED WITH EPOXY POLYSILOXANE.BENEFICIARY: THE PUBLICCalifornia (Bureau of Reclamation federal awards)BIG VALLEY BAND OF POMO INDIANS$300K—
PURPOSE: THE BUREAU OF RECLAMATION (RECLAMATION), THROUGH THE NATIVE AMERICAN AFFAIRS TECHNICAL ASSISTANCE TO TRIBES PROGRAM (PROGRAM), PROVIDES TECHNICAL ASSISTANCE TO INDIAN TRIBES AND TRIBAL ORGANIZATIONS.THIS PROGRAM IS ADMINISTERED IN ACCORDANCE WITH THE RECLAMATION ACT OF 1902, AS AMENDED AND SUPPLEMENTED, INCLUDING 43 UNITED STATES CODE (USC) 373D, WHICH AUTHORIZES RECLAMATION TO PROVIDE FINANCIAL ASSISTANCE TO INDIAN TRIBES AND TRIBAL ORGANIZATIONS TO INCREASE OPPORTUNITIES TO DEVELOP, MANAGE, AND PROTECT TRIBAL WATER AND RELATED RESOURCES.ACTIVITIES TO BE PERFORMED: THE OBJECTIVE OF THE PROJECT WITHIN THE TWO-YEAR PERIOD PROPOSED THE FOLLOWING ACTIVITIES ARE ANTICIPATED:A. INSTALLATION OF MONITORING WELL(S) AND IMPROVEMENTS ON EXISTING WELLS USED TO MONITOR RECHARGE AND AQUIFER CHARACTERISTICS.B. MONITORING OF WATER USE AND PERMITTING IN THE WATERSHED TO ESTABLISH WATER QUALITY PARAMETERS.C. ESTABLISH BASELINE WATER QUALITY MONITORING.D. DESIGN AND PERMITTING FOR CRITICAL EROSION CONTROL MEASURESDELIVERABLES: COMPLETED WELLS WITH WATER QUALITY TESTS, AND WELL DEVELOPMENT REPORT, AND PUMP TEST RESULTS.BENEFICIARIES: THE PUBLICCalifornia (Bureau of Reclamation federal awards)MIDDLETOWN RANCHERIA OF POMO INDIANS OF CALIFORNIA$293K—
THE AGUA CALIENTE BAND OF CAHUILLA INDIANS, LOCATED IN RIVERSIDE COUNTY, CALIFORNIA, WILL DEVELOP A STRATEGIC PLAN TO AUGMENT WATER SUPPLIES IN THE COACHELLA VALLEY AND ENSURE LONG TERM WATER SUPPLY RELIABILITY. THE TRIBE AND WATER DISTRICTS IN THE VALLEY RELY ON IMPORTED WATER SUPPLIES FOR DIRECT USE AND REPLENISHMENT OF THE GROUNDWATER BASIN AND ONGOING DROUGHT CONDITIONS HAVE REDUCED THEIR ABILITY TO IMPORT WATER FROM EXISTING SOURCES AND INCREASED PUMPING HAS CAUSED A SIGNIFICANT DECLINE IN GROUNDWATER LEVELS. THE TRIBE WILL CONDUCT OUTREACH TO LOCAL, REGIONAL, STATE, AND OTHER WATER PROVIDERS AND WATER MANAGEMENT ORGANIZATIONS, ANALYZE FUTURE WATER SUPPLY NEEDS AND CONSTRAINTS, EVALUATE THE RISKS THAT IMPACT EXISTING WATER IMPORTATION ACTIVITIES, COMPARE AND PRIORITIZE WATER SUPPLY ALTERNATIVES, AND DEVELOP AND IMPLEMENTATION PLAN FOR ADDITIONAL WATER SUPPLY ENHANCEMENT PROJECTS. THIS EFFORT IS SUPPORTED BY THE COACHELLA VALLEY REGIONAL WATER MANAGEMENT GROUP AND RIVERSIDE COUNTY.California (Bureau of Reclamation federal awards)AGUA CALIENTE BAND OF CAHUILLA INDIANS$148K—
THE WESTERN MUNICIPAL WATER DISTRICT (DISTRICT), LOCATED IN RIVERSIDE, CALIFORNIA, WILL INSTALL SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) AT THREE POTABLE WATER PUMP STATIONS. THE DISTRICT WILL INSTALL PROGRAMMABLE LOGIC CONTROLLERS TO COLLECT REAL-TIME DATA AT EACH PUMP STATION. THE INSTALLATION OF THE SYSTEM WILL OPTIMIZE PROCESS CONTROL, ENHANCING WATER SUPPLY RELIABILITY AND OPERATIONAL RELIABILITY, REDUCING WATER LOSSES, STREAMLINING DATA COLLECTION, AND IMPROVING INFORMATION SHARING. THE PROJECT WILL IMPROVE THE OVERALL MANAGEMENT AND SUSTAINABILITY OF THE WATER SUPPLY SYSTEM WHILE REDUCING COSTS RELATED TO WATER LOSSES BY IDENTIFYING LEAKS EARLY. THE PROJECT IS A PRIORITY IN THE DISTRICTS 2018 SUPERVISORY CONTROL AND DATA ACQUISITION MASTER PLAN AND ADDRESSES THE PLANS GOALS OF OPTIMIZING AND IMPROVING THE CONTROL SYSTEM.California (Bureau of Reclamation federal awards)WESTERN MUNICIPAL WATER DISTRICT OF RIVERSIDE COUNTY$100K—
THE YUCAIPA VALLEY WATER DISTRICT, LOCATED IN SAN BERNARDINO COUNTY, CALIFORNIA, WILL INSTALL REMOTE GROUNDWATER MONITORING EQUIPMENT ON GROUNDWATER WELLS WITHIN THE YUCAIPA BASIN IN SOUTHERN CALIFORNIA. THIS EQUIPMENT WILL BE PLACED INTO TEN EXISTING PRODUCTION AND MONITORING WELLS TO AID GROUNDWATER DATA COLLECTION. WITH MORE ACCURATE AND FREQUENT GROUNDWATER LEVEL DATA, THE DISTRICT CAN MAKE BETTER-INFORMED DECISIONS ON GROUNDWATER PUMPING AND RECHARGE AND SHARE THIS DATA WITH OTHER STAKEHOLDERS WITHIN THE YUCAIPA BASIN. THIS PROJECT MEETS THE GOALS IN DISTRICT'S SUSTAINABILITY PLAN, WATER SHORTAGE CONTINGENCY PLAN, AND THE YUCAIPA GROUNDWATER SUSTAINABILITY PLAN.California (Bureau of Reclamation federal awards)YUCAIPA VALLEY WATER DISTRICT$67K—
STOCKTON EAST WATER DISTRICT, WITH THE SUPPORT OF EASTERN SAN JOAQUIN GROUNDWATER AUTHORITY, NORTH SAN JOAQUIN WATER CONSERVATION DISTRICT, AND CENTRAL SAN JOAQUIN WATER CONSERVATION DISTRICT, WILL DEVELOP GROUNDWATER PUMPING AND RECHARGE VOLUMES USING PROVEN, REMOTE SENSING TECHNIQUES, BASED ON EVAPOTRANSPIRATION (ET) ESTIMATION FROM NASA'S LANDSAT SATELLITE IMAGERY. THE AGENCIES INVOLVED ARE PART OF THE GROUNDWATER SUSTAINABILITY AGENCY RESPONSIBLE FOR IMPLEMENTING CALIFORNIA'S SUSTAINABLE GROUNDWATER MANAGEMENT ACT IN THE EASTERN SAN JOAQUIN GROUNDWATER SUB BASIN. THE EASTERN SAN JOAQUIN GROUNDWATER BASIN IS A HIGH PRIORITY, CRITICALLY OVER-DRAFTED GROUNDWATER BASIN BY THE CALIFORNIA DEPARTMENT OF WATER RESOURCES. THIS PROJECT WILL IMPLEMENT THE GEOSPATIAL RESOURCES OF WATER MANAGEMENT FOR AGRICULTURAL SYSTEMS, AN AUTOMATED PORTAL THAT USES LANDSAT IMAGERY AND WEATHER DATA TO PRODUCE DAILY, MONTHLY, AND ANNUAL ET DATA. THE PROJECT WILL HELP THE GROUNDWATER SUB-BASIN ACCOUNT FOR GROUNDWATER DEMAND, MANAGE AVAILABLE SURFACE AND GROUNDWATER RESOURCES, ALLOCATE COSTS AND DOCUMENT BENEFITS OF PROPOSED GROUNDWATER BANKING, STORAGE AND CONJUNCTIVE USE PROJECTS.California (Bureau of Reclamation federal awards)STOCKTON EAST WATER DISTRICT$58K—
THE AGUA CALIENTE BAND OF CAHUILLA INDIANS (TRIBE), LOCATED IN RIVERSIDE COUNTY, CALIFORNIA, IN CONJUNCTION WITH THE AGUA CALIENTE WATER AUTHORITY, WILL DEVELOP AN ONLINE GEOSPATIAL DATA PLATFORM (GDP) TO STORE AND DISPLAY GEOSPATIAL AND TIME DEPENDENT DATASETS INCLUDING CLIMATE, GROUNDWATER, SURFACE WATER, AND WATER QUALITY DATA FOR THE AGUA CALIENTE INDIAN RESERVATION. THE TRIBE WILL USE THE GDP TO INTEGRATE THE DATASETS WITH THE HYDROGEOLOGIC CONCEPTUAL MODEL (HCM) TO SUPPORT 3 DIMENSIONAL VISUALIZATION AND ASSESSMENT BASED ON AVAILABLE WELL LOGS, GEOPHYSICAL DATA, PUMP TESTS, AND OTHER RELATED HYDROGEOLOGIC DATASETS. THE GDP TOOL WILL ALLOW USERS TO EXAMINE CHANGES IN THE OCCURRENCE AND MOVEMENT OF GROUNDWATER AND WATER QUALITY OVER TIME, THEREBY HELPING WATER MANAGERS MAKE INFORMED MANAGEMENT DECISIONS AND PROMOTE SUSTAINABLE GROUNDWATER RESOURCES.California (Bureau of Reclamation federal awards)AGUA CALIENTE BAND OF CAHUILLA INDIANS$55K—
DRILLING AN 800-FOOT DEEP WELL TO PUMP APPROXIMATELY 1,250 ACRE-FEET PER YEAR, IN A MANNER CONSISTENT WITH STATE WATER LAW REQUIREMENTS. ALONG WITH THE WELL, A WATER TREATMENT FACILITY AND A BOOSTER PUMP STATION WILL BE CONSTRUCTED.California (Bureau of Reclamation federal awards)LONG BEACH, CITY OF——
AWARD PURPOSE:THE SAN LORENZO VALLEY WATER DISTRICT WILL UPGRADE 522 RESIDENTIAL AND MULTI RESIDENTIAL WATER METERS WITH WATER METERS THAT HAVE ADVANCED METERING INFRASTRUCTURE CAPABILITIES. ACTIVITIES TO BE PERFORMED:REPLACE 522 EXISTING MANUAL-READ WATER METERS WITH NEW AMI METERSINSTALL 522 NEW ENDPOINTSPROJECT OUTCOMES:THE UPGRADED WATER METERS WILL ALLOW FOR THE RAPID DETECTION OF LEAKS AND WILL IMPROVE OPERATIONAL EFFECTIVENESS. OTHER WATER DISTRICTS HAVE REPORTED WATER SAVINGS TO BE 15 ON AVERAGE AMONG RESIDENTIAL CUSTOMERS AFTER THE INSTALLATION OF AMI METERS. ELIMINATING THE NEED TO MANUALLY READ AMR METERS WILL SUBSTANTIALLY REDUCE TRUCK ROLLS, SAVING FUEL AND MAINTENANCE COSTS ALONG WITH STAFF TIME AND COSTS. INTENDED BENEFICIARIES:THE DISTRICT RELIES ON SURFACE WATER FROM THE SAN LORENZO RIVER AND ITS TRIBUTARIES FOR 54 PERCENT OF ITS WATER SUPPLY. THE ANTICIPATED WATER SAVINGS FROM THE PROPOSED PROJECT WILL NOT ONLY BENEFIT THE DISTRICT BUT WILL BENEFIT DOWNSTREAM WATER USERS, IN PARTICULAR THE CITY OF SANTA CRUZ WHICH RELIES UPON THE SURFACE WATERS OF THE SAN LORENZO RIVER. THE PROJECT WILL BENEFIT RESIDENTIAL CUSTOMERS ALONG WITH A GOLF COURSE AND HORSE STABLES. THE ECOSYSTEM WILL ALSO BENEFIT AS A RESULT OF REDUCED DIVERSIONS AND GROUND BASIN PUMPING WHICH WILL PROVIDE BENEFITS TO SPECIES THAT DEPEND ON FLOWING SURFACE WATERS IN THE SAN LORENZO RIVER SYSTEM AND WILL CONTRIBUTE TO HEALTHIER RIPARIAN HABITAT.California (Bureau of Reclamation federal awards)SAN LORENZO VALLEY WATER DISTRICT$100K—
THE PROJECT REPRESENTS THE COMPLETION OF THE GROUNDWATER RESOURCE DEVELOPMENT PROJECT OF THE MESA GRANDE BAND OF MISSION INDIANS (TRIBE). THE PROJECT STARTED IN FY 2020 THROUGH THE BOR TECHNICAL ASSISTANCE TO TRIBES PROGRAM. WORK COMPLETED TO DATE HAS INVOLVED THE IDENTIFICATION OF FIVE SITES FAVORABLE FOR DRILLING INTO THE FRACTURED BEDROCK AQUIFER UNDERLYING TRIBAL LANDS, ENVIRONMENTAL AND CULTURAL RESOURCES COMPLIANCE FOR DRILL SITES, DEVELOPMENT OF TECHNICAL SPECIFICATIONS FOR WELL DRILLING AND COMPLETION, SOLICITATION AND SELECTION OF A DRILLING AND PUMP CONTRACTOR, AND THE DRILLING AND COMPLETION OF WELLS AT TWO OF FIVE SITES. AQUIFER TESTING AND PREPARATION OF PROJECT REPORTS FOR PHASE 1 OF THE PROJECT WILL BE COMPLETED BY JUNE 2022.PHASE 2 OF THE PROJECT INVOLVES THE DRILLING AND COMPLETION OF THREE WELLS ON THE REMAINING SITES, ENVIRONMENTAL AND CULTURAL RESOURCES COMPLIANCE FOR GRADING ACCESS ROADS TO DRILL SITES, AQUIFER TESTING, DATA COLLECTION AND EVALUATION, AND PREPARATION OF PROJECT REPORTS TO INCLUDE AN ESTIMATE OF THE AQUIFER S SUSTAINABLE YIELD TO MANAGE GROUNDWATER RESOURCES.UNDER THIS AGREEMENT, THE RECIPIENT SHALL COMPLETE ALL ACTIVITIES REQUIRED TO DRILL WELLS AT THE THREE REMAINING SITES OF THE FIVE PRE SELECTED DURING PHASE 1 OF THIS PROJECT.THE PROJECT IS LOCATED IN THE MESA GRANDE RESERVATION WITHIN THE 900 ACRE TRACT.California (Bureau of Reclamation federal awards)MESA GRANDE BAND OF MISSION INDIANS$268K—
THE CITY OF YUBA CITY, LOCATED IN NORTHERN CALIFORNIA, WILL UPGRADE BOOSTER PUMP STATIONS FROM SOFT START SYSTEMS TO VARIABLE FREQUENCY DRIVES (VFDS). THE VFDS WILL PROVIDE MORE FLEXIBILITY WHEN RUNNING PUMPS, AND THE PROJECT WILL ALLOW THE CITY TO MANAGE AND MAINTAIN A MORE EFFECTIVE WATER DISTRIBUTION SYSTEM. PROJECT IMPROVEMENTS WERE IDENTIFIED IN THE CITY'S 2018 WATER MASTER PLANCalifornia (Bureau of Reclamation federal awards)CITY OF YUBA CITY$45K—
THIS IS SERVICE CONTRACT TO REPLACE SHAFT AND REPAIR ONE (1) WORTHINGTON HORIZONTAL BETWEEN-BEARINGS SPLIT CASE CENTRIFUGAL PUMP FOR THE CENTRAL CALIFORNIA AREA OFFICE OF THE CALIFORNIA GREAT BASIN.California (Bureau of Reclamation federal awards)MILTON S FRANK CO INC$160K—
THE CITY OF HEMET, LOCATED IN SOUTHERN CALIFORNIA, WILL IMPLEMENT A REBATE PROGRAM FOR RESIDENTIAL AND COMMERCIAL WATER USERS TO CONVERT UP TO 90,000 SQUARE FEET OF TURF LAWNS TO DROUGHT TOLERANT LANDSCAPING. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 8 ACRE-FEET, WHICH WILL REDUCE THE CITYS NEED TO PUMP GROUNDWATER.California (Bureau of Reclamation federal awards)CITY OF HEMET$100K—
PURPOSE: REDUCE THE CRITICAL OVERDRAFT CONDITIONS IN THE BASIN BY: PROTECTING AGAINST FURTHER SEAWATER INTRUSION AND CONTAMINATION OF THE GROUNDWATER BASIN BUILDING RESILIENCY AGAINST SEA LEVEL RISE IMPACTS CAUSED BY CLIMATE CHANGE PROMOTING BENEFICIAL REUSE AND PROVIDING A RELIABLE WATER SUPPLY DURING DROUGHTS PRESERVING A FEDERALLY PROTECTED MARINE AREA BY REDUCING DISCHARGE OF TREATED WASTEWATER TO MONTEREY BAY NATIONAL MARINE SANCTUARY (SANCTUARY) COMPLYING WITH STATE MANDATED SUSTAINABILITY GOALS AND AVOIDING WATER RESTRICTIONS THAT WOULD AFFECT TOURISM, BUSINESSES, QUALITY OF LIFE AND HAVE A DEVASTATING ECONOMIC IMPACT ON THE REGION (ESTIMATED AT OVER 900 MILLION WITH ADDED BENEFITS OF AVOIDING THE LOSS OF OVER 725 JOBS AND A MORATORIUM ON WATER METERS THAT WOULD PREVENT 2,100 NEW HOUSING UNITS).THE PROJECT WILL CAPTURE SECONDARY TREATED EFFLUENT THAT IS DISCHARGED AS A WASTE STREAM INTO THE SANCTUARY, PURIFY IT THROUGH AN ADVANCED WATER TREATMENT PROCESS, AND INJECT THE PURIFIED WATER INTO THE GROUNDWATER TO REPLENISH THE SUPPLIES, RAISE GROUNDWATER ELEVATIONS ALONG THE COAST, AND PROTECT THE BASIN FROM FURTHER SEAWATER INTRUSION.WITH THE PROJECT, THE REGION CAN ACHIEVE A RELIABLE WATER SUPPLY, ACHIEVE THE STATE MANDATE TO ACHIEVE BASIN SUSTAINABILITY BY 2040, RESTORE THE BASIN AND PROMOTE GREATER REGIONAL WATERSHED ENHANCEMENTS THAT ARE DROUGHT RESILIENT, INCREASE RESILIENCY AGAINST CLIMATE CHANGE IMPACTS, AND ADVANCE EQUAL OPPORTUNITY IN THE REGION.ACTIVITIES TO BE PERFORMED:OBJECTIVE 1: CONTRACTS FOR PROGRAM MANAGEMENTOBJECTIVE 2: CONTRACT FOR ENVIRONMENTAL DOCUMENTATION AND PERMITTING SERVICESOBJECTIVE 3: CONTRACT SUPPORT FOR CAPITAL PROGRAM MANAGEMENTOBJECTIVE 4: CONTRACTUAL SUPPORT FOR FINAL DESIGNOBJECTIVE 5: CONTRACT FOR INFRASTRUCTURE CONSTRUCTIONDELIVERABLE(S) EXPECTED OUTCOME(S):OBJECTIVE 1 OUTCOMES: ADMINISTRATIVE PROGRAM MANAGEMENT OFFICE ADMINISTRATION AND SUPPORT RECYCLED WATER UTILITY SUPPORT OUTREACH AND EDUCATION ENVIRONMENTAL DOCUMENTATION AND ENVIRONMENTAL PERMITTING SUPPORT GROUNDWATER HYDROLOGY SUPPORT GROUNDWATER MONITORING CAPITAL PROGRAM COORDINATION PROCUREMENT ASSISTANCE QUALITY ASSURANCE FUNDING SUPPORT REGULATORY AND FINANCIAL STRATEGY SUPPORT STAKEHOLDER AGREEMENTS CONTRACT AND CONSTRUCTION SUPPORT LAND AND EASEMENT ACQUISITION SUPPORT LAB TESTING AND MONITORING UTILITY SERVICES.OBJECTIVE 2 OUTCOMES: ENVIRONMENTAL CONSULTING SERVICES TO PREPARE PROJECT-LEVEL CEQA AND NEPA ENVIRONMENTAL DOCUMENTATION FOR PROGRAM FACILITIES, EIR ADDENDUMS, PROVIDES ENVIRONMENTAL REGULATORY PERMITTING SERVICES, ASSOCIATED ENVIRONMENTAL SURVEYS, AND ENVIRONMENTAL SERVICES DURING CONSTRUCTION.OBJECTIVE 3 OUTCOMES: PROFESSIONAL ENGINEERING SERVICES ASSOCIATED WITH PROGRAM MANAGEMENT, PROJECT MANAGEMENT, ESTABLISHING THE BASIS OF DESIGN FOR THE PROGRAMS TWO TREATMENT FACILITIES (TERTIARY AND ADVANCED WATER PURIFICATION), AND THREE SEAWATER INTRUSION PREVENTION (SWIP) WELLS AND ASSOCIATED MONITORING WELLS, CONVEYANCE INFRASTRUCTURE INCLUDING 9 MILES OF PIPELINES AND ASSOCIATED PUMP STATIONS.OBJECTIVE 4 OUTCOMES: CONTRACT FOR DESIGN-BUILD DELIVERY OF THE CONVEYANCE INFRASTRUCTURE PROJECT CONTRACT FOR DESIGN-BUILD DELIVERY OF THE TREATMENT FACILITIES PROJECT CONTRACT FOR ENGINEERING DESIGN SERVICES FOR THE SWIP WELLS 100 DESIGN, SWIP MONITORING WELLS 100 DESIGN, AND SWIP WELL EQUIPPING 100 DESIGN AND CONTRACT FOR OPERATIONS AND MAINTENANCE AT RISK (OMAR) ENGINEERING AND OPERABILITY DESIGN SERVICES TO SUPPORT THE TREATMENT FACILITIES DESIGN AND COORDINATION WITH THE INTERCONNECTED INFRASTRUCTURE. OBJECTIVE 5 OUTCOMES: CONSTRUCTION OF THE CONVEYANCE INFRASTRUCTURE PROJECT TREATMENT FACILITY PROJECT SWIP WELLS, SWIP MONITORING WELLS AND SWIP WELLS EQUIPPING PROJECTS.BENEFICIARY: THE PUBLICCalifornia (Bureau of Reclamation federal awards)SOQUEL CREEK WATER DISTRICT$30.0M—
THE CITY OF SANTA ANA (CITY), LOCATED IN ORANGE COUNTY, CALIFORNIA, WILL RELOCATE ITS EXISTING PRESSURE REDUCING STATION NO. 2 AND CONSTRUCT A NEW EMERGENCY BOOSTER PUMP STATION TO EXPAND THE CITYS UPPER ZONE WATER SUPPLY SOURCES TO ENSURE THE UPPER ZONE IS PROVIDED WATER SERVICES IN THE EVENT OF WATER SUPPLY SHORTAGES. CURRENTLY THE UPPER ZONE IS SUPPLIED WITH WATER FROM THREE WELLS AND ONE WATER CONNECTION FOR IMPORTED SURFACE WATER. THE CITY RECENTLY DISCOVERED PFAS CONTAMINATION WITHIN ALL THE UPPER ZONE WELLS, AND DUE TO DROUGHT, THE UPPER ZONE STRUGGLES WITH ONGOING WATER SHORTAGES OF IMPORTED WATER. THE WATER SHORTAGES AND PFAS CONTAMINATION, MAKE FINDING ALTERNATIVE WATER SOURCES FOR THE UPPER ZONE CRITICAL. THIS PROJECT WILL ALLOW THE CITY TO MAXIMIZE THE WATER OPERATIONAL FLEXIBILITY OF THE SYSTEM BY ALLOWING FOR THE TRANSFER UP TO 7,226 ACRE-FEET PER YEAR BETWEEN THE LOWER AND UPPER ZONES IN THE CITY. THE UPPER ZONE WILL BE ABLE TO PROVIDE WATER TO THE LOWER ZONE WITH THE RELOCATION OF THE PRESSURE REDUCING VALVE AND THE LOWER ZONE WILL BE ABLE TO PROVIDE WATER TO THE UPPER ZONE WITH THE CONSTRUCTION OF THE EMERGENCY PUMP STATION. THIS PROJECT IS SUPPORTED BY THE CITYS URBAN WATER MANAGEMENT PLANS WATER SHORTAGE CONTINGENCY PLAN WATER SERVICE RELIABILITY AND DROUGHT RISK ASSESSMENT THAT IDENTIFIES THE IMPLEMENTATION OF DROUGHT MANAGEMENT ACTIONS TO MITIGATE DROUGHT IMPACTS.California (Bureau of Reclamation federal awards)SANTA ANA, CITY OF$1.8M—