Texas pumping contracts

3 contracts tracked across 1 municipality.

Contracts
3
municipalities
1
Distinct vendors
2

municipalities with the most pumping contracts

Top vendors in Texas pumping

VendorContractsVolume
EL PASO WATER UTILITIES PUBLIC SERVICE BOARD2$7.6M
FEDSATIZ LIMITED CO1—

Recent pumping contracts in Texas

TitlemunicipalityVendorValueSolicitation
THE EL PASO WATER UTILITIES PUBLIC SERVICE BOARD WILL REPLACE 60,000 EXISTING MANUAL READ METERS WITH ADVANCED METERING INFRASTRUCTURE SMART METERS FOR RESIDENTIAL AND BUSINESS CUSTOMERS, AND IMPLEMENT A CUSTOMER PORTAL FOR REAL-TIME TRACKING. IN RECENT YEARS, THE BOARD HAS RECEIVED ONLY ABOUT 20 PERCENT OF ITS ANNUAL WATER ALLOCATION FROM THE RIO GRANDE PROJECT AS A RESULT OF ONGOING DROUGHT CONDITIONS. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 1,285 ACRE-FEET, WHICH WILL REMAIN IN THE RIO GRANDE PROJECT AND REDUCE GROUNDWATER PUMPING FROM THE HUECO BOLSON AQUIFER.Texas (Bureau of Reclamation federal awards)EL PASO WATER UTILITIES PUBLIC SERVICE BOARD$5.0M—
HORIZONTAL SLUDGE PUMP AND MOTORTexas (Bureau of Reclamation federal awards)FEDSATIZ LIMITED CO——
PHASE 1 IMPROVEMENTS WILL EXPAND THE KAY BAILEY HUTCHISON DESALINATION PLANT (KBH) CAPACITY BY 6,721 ACRE FEET PER YEAR. THE KBH PLANT EXPANSION PROJECT WILL PROVIDE A NEW DROUGHT-PROOF WATER SUPPLY, ENABLING THE RECIPIENT TO CONSERVE WATER FROM THE REGIONS AQUIFERS. THE NEW CAPACITY WILL PREVENT HEAVY PUMPING THAT IS SOMETIMES REQUIRED WHEN THE RIO GRANDE PROJECT ALLOCATIONS ARE BELOW NORMAL AND OVER TIME WHEN POPULATION INCREASES CAUSE WATER DEMAND TO RISE. STRATEGIC WELL POSITIONING FOR DESALINATION SERVES AS A BUFFER AND HELP PROTECT THE FRESH WATER SUPPLY IN THE HUECO BOLSON AQUIFER, WHICH IS AN ESSENTIAL SOURCE FOR BOTH EL PASO AND FORT BLISS. THIS AWARD ENABLES THE EL PASOT TO BE MORE RESILIENT AND MORE EASILY TOLERATE LOWER ALLOCATIONS OF RIO GRANDE WATER DURING DROUGHT YEARS.PHASE 1 PART B OF THE KBH PLANT EXPANSION INCLUDES SEVERAL ELEMENTS TO SUPPORT THE ADDITION OF THE SIXTH REVERSE OSMOSIS TREATMENT UNIT. THESE ELEMENTS INCLUDE:SAND STRAINERS THE INCREASED CAPACITY OF 6 MGD WILL CAUSE EXISTING SAND STRAINERS TO REACH THEIR MAXIMUM FLOW CAPACITY. AN ADDITIONAL SAND STRAINER OF THE SAME CAPACITY AS THE EXISTING ONES WILL PROVIDE REDUNDANCY AND ALLEVIATE THE INCREASE IN PARTICLE LOADING.CARTRIDGE FILTER HOUSINGS TO MEET INCREASED FEED FLOW, ONE ADDITIONAL CARTRIDGE FILTER HOUSING WILL BE REQUIRED.CHEMICAL SYSTEM EVALUATION THE INCREASED CAPACITY RESULTING FROM THE SIXTH RO TREATMENT UNIT WILL REQUIRE CHEMICAL SYSTEMS TO BE EVALUATED AND ADJUSTED TO CONTINUE TO MEET ALL NECESSARY REGULATIONS AND SPECIFICATIONS.INSTRUMENTATION AND CONTROLS ORIGINAL INSTALLED EQUIPMENT MAY REQUIRE UPGRADES FOR COMPATIBILITY WITH CURRENT MARKET SOFTWARE NECESSARY TO SUPPORT THE ADDITION OF THE SIX RO TREATMENT UNIT.Texas (Bureau of Reclamation federal awards)EL PASO WATER UTILITIES PUBLIC SERVICE BOARD$2.6M—