Category

Engineering

227 contracts tracked across 12 states.

Contracts
227
States covered
12
Vendors
8+

Top states for engineering

Top vendors in engineering

VendorContractsVolume
INTER-FLUVE, INC.35$9.0M
STANTEC CONSULTING SERVICES INC.5$3.8M
FEASIBILITY RESEARCH GROUP OHIO LLC5$353K
ABT GLOBAL LLC4$15.3M
ADAPT CONSULTING LLC3$56K
CDM FEDERAL PROGRAMS CORPORATION3$2.5M
CLOUD NINE TECHNOLOGIES INC3$2.0M
HDR SCHNABEL RECLAMATION JOINT VENTURE3$820K

Recent engineering contracts (40)

TitleStateVendorValueSolicitation
ACOMA PUEBLO TCP STUDYNMPUEBLO OF ACOMA$261K—
AUTODESK, AUTOCAD ARCHITECTURE ENGINEERING & CONSTRUCTION (AEC) COLLECTION ANNUAL SUBSCRIPTIONVA4 STAR TECHNOLOGIES, INC.$105K—
SERVICES FOR PHASES 3 AND 4 FINAL DESIGN AND PHASE 3 CONSTRUCTION SUPPORT EAGLE VALLEY RANCHIDINTER-FLUVE, INC.$1.3M—
EAGLE ROCK 100 PERCENT DESIGNIDINTER-FLUVE, INC.$159K—
A MULTI-LEVEL, MULTI-STAGE MODELING FRAMEWORK FOR THE ANALYSIS AND DESIGN OF SEAWATER DESALINATION USING RENEWABLE ENERGYTXTEXAS A & M UNIVERSITY KINGSVILLE$151K—
WATSONVILLE AREA WATER RECYCLING PROJECT (DESIGN AND CONSTRUCTION)CACITY OF WATSONVILLE$5.6M—
PURPOSE: THE PURPOSE OF THIS AWARD IS TO BUILD THE CAPACITY OF HUD'S SPECIAL NEEDS ASSISTANCE PROGRAM CUSTOMER ORGANIZATIONS TO DEPLOY CONTINUUM OF CARE AND EMERGENCY SOLUTIONS GRANT PROGRAMS EFFECTIVELY AND IN COMPLIANCE WITH ASSOCIATED RULES AND REGULATIONS.; ACTIVITIES TO BE PERFORMED: HUD WILL IDENTIFY SPECIFIC TECHNICAL ASSISTANCE NEEDS TO BE ADDRESSED THROUGH A DEMAND-RESPONSE PROGRAM MODEL. THE RECIPIENT MAY RESPOND TO THOSE NEEDS THROUGH A RANGE OF ELIGIBLE ACTIVITIES: NEEDS ASSESSMENTS; DIRECT TECHNICAL ASSISTANCE AND CAPACITY BUILDING; DEVELOPMENT AND MAINTENANCE OF TOOLS AND PRODUCTS; SELF-DIRECTED AND GROUP LEARNING; KNOWLEDGE MANAGEMENT; DATA ANALYSIS, REPORTING, AND PERFORMANCE MEASUREMENT; ADMINISTRATION; AND COORDINATION. ; EXPECTED OUTCOMES: OUTCOMES ARE THE RESULTS OF TECHNICAL ASSISTANCE ACTIVITIES, INCLUDING BUT NOT LIMITED TO CHANGES IN MANAGEMENT OR OPERATION OF HUD-FUNDED PROGRAMS OR INITIATIVES. SPECIFIC OUTCOMES WILL VARY BASED ON THE NATURE OF THE ACTIVITIES CARRIED OUT. STANDARD OUTCOME CATEGORIES INCLUDE IMPROVED CAPACITY TO DESIGN PROGRAMS, POLICIES, AND STRATEGIES AS WELL AS TO DELIVER PROJECTS, PROGRAMS, OR SYSTEMS THAT ADDRESS COMMUNITY NEEDS AS DEFINED IN THE TECHNICAL ASSISTANCE (TA) SCOPE.; INTENDED BENEFICIARIES: SELECTED AWARD RECIPIENTS WILL BE DEPLOYED AS HUD DEEMS MOST NECESSARY ACROSS THE COUNTRY TO ASSIST ORGANIZATIONS RECEIVING HUD FUNDS TO IMPROVE PERFORMANCE AND MANAGEMENT OF HUD FUNDS. BENEFICIARIES WILL VARY BY ACTIVITY AND INCLUDE TECHNICAL ASSISTANCE CUSTOMERS OF HUD'S SPECIAL NEEDS ASSISTANCE PROGRAMS WHICH MANAGE AWARDS MADE UNDER A MCKINNEY-VENTO OR HEARTH ACT AUTHORIZATION.; SUBRECIPIENT ACTIVITIES: SUBRECIPIENT ACTIVITIES ARE UNKNOWN AT THE TIME OF AWARD.ALCOLLABORATIVE SOLUTIONS INC$409K—
GSL BASIN STUDY MODELING SERVICESUTAVALON BUSINESS ENGINEERING SERVICES, LLC——
THE AGREEMENT PROVIDES FUNDS TO DRY PRAIRIE RURAL WATER AUTHORITY FOR DESIGN AND CONSTRUCTION OF THE DRY PRAIRIE RURAL WATER SUPPLY SYSTEM ACTIVITIES COMPLETED UNDER THE AGREEMENT WILL ASSIST THE CITIZENS OF ROOSEVELT, SHERIDA, DANIELS, AND VALLEY COUNTIES IN THE STATE, OUTSIDE THE FORT PECK RESERVATION, IN DEVELOPING SAFE AND ADEQUATE MUNICIPAL, RURAL, AND INDUSTRIAL WATER SUPPLIES.MTDRY PRAIRIE RURAL WATER AUTHORITY$46.3M—
SCHWEITZER ENGINEERING LABORATORIES (SEL) RELAYS AND COMPONENTSKYMARY HELEN PARKEY$104K—
DRY REDWATER FEASIBILITY STUDYMTDRY-REDWATER REGIONAL WATER AUTHORITY$800K—
CVS FACILITATOR SHASTA VP STUDYCOADAPT CONSULTING LLC$27K—
2974 INCLINE ELEVATOR MOD - DESIGNWAJACOBS ENGINEERING GROUP INC$650K—
GCPO BATTERY LOAD STUDYWAHDR ENGINEERING, INC.$394K—
THE UPPER YELLOWSTONE WATERSHED IS THE HEADWATERS OF THE LONGEST FREE-FLOWING RIVER IN THE CONTIGUOUS UNITED STATES. THE ICONIC YELLOWSTONE RIVER ORIGINATES SOUTHEAST OF YELLOWSTONE NATIONAL PARK IN THE ABSAROKA MOUNTAIN RANGE, FLOWING 671 MILES BEFORE ITS CONFLUENCE WITH THE MISSOURI RIVER. THE UPPER YELLOWSTONE WATERSHED IS EXPERIENCING NUMEROUS PRESSURES ON ITS AQUATIC RESOURCES INCLUDING CURRENT AND LEGACY LAND-USE PRACTICES, HIGH RECREATIONAL USE, OVERALLOCATION OF WATER, INVASIVE SPECIES, CHANNEL ARMORING DIKING, AND CLIMATIC CHANGES. THERE ARE CURRENTLY TWO WATERSHED GROUPS ACTIVE WITHIN THIS GEOGRAPHY. THE UPPER YELLOWSTONE WATERSHED GROUP (UYWG) SERVES THE UPPER YELLOWSTONE RIVER AND ITS TRIBUTARIES FROM THE NATIONAL PARK BOUNDARY IN GARDINER, MT DOWNSTREAM TO CARTERS BRIDGE (JUST UPSTREAM OF LIVINGSTON, MT), WHILE THE SHIELDS VALLEY WATERSHED GROUP (SVWG) SERVES THE SHIELDS RIVER FROM ITS HEADWATER TRIBUTARIES DOWN TO ITS CONFLUENCE WITH THE YELLOWSTONE RIVER. MONTANA FRESHWATER PARTNERS (MFP) HAS BEEN A MEMBER OF BOTH OF THESE WATERSHED GROUPS SINCE 2016 AND HAS BEEN ACTIVELY WORKING WITH THEM TO INCREASE CAPACITY AND COORDINATION TO IMPLEMENT ON-THE-GROUND WATER CONSERVATION AND WATERSHED HEALTH PROJECTS. OVER THE PAST 18 MONTHS, MFP HAS MADE SIGNIFICANT STRIDES IN BRINGING TOGETHER A DIVERSE GROUP OF WATER RESOURCE PROFESSIONALS AND LANDOWNERS TO COLLABORATIVELY IDENTIFY AND PRIORITIZE RESTORATION, PLANNING, AND OUTREACH PROJECTS, WITH THE GOAL OF INCREASING THE HEALTH AND RESILIENCE OF THE UPPER YELLOWSTONE AND SHIELDS WATERSHEDS. THIS PLANNING EFFORT HAS BEEN IN DIRECT CONCERT WITH THE UPPER YELLOWSTONE AND SHIELDS WATERSHED GROUPS, AS WELL AS OTHER LOCAL PARTNERS INCLUDING NGOS AND LOCAL, STATE, AND FEDERAL AGENCIES. THIS LEVEL OF COORDINATION IS PARTICULARLY CRITICAL AS OUR WATERSHED FACES UNPRECEDENTED CHALLENGES POSED BY FACTORS SUCH AS CLIMATE CHANGE, ONGOING DEVELOPMENT, AND INCREASED RECREATIONAL USE. WE ARE SEEKING FUNDING TO FORMALIZE THIS EFFORT THAT WE ARE CALLING THE PARK CO. WATER INITIATIVE (THE WATER INITIATIVE) TO CONTINUE TO COORDINATE AND COLLABORATE ON PROJECT IDENTIFICATION AND RANKING, FUNDING PROCUREMENT AND IMPLEMENTATION. THIS PROPOSAL AIMS TO FUND CAPACITY TO (1) FORMALIZE THE WATER INITIATIVE AND DEVELOP MISSION AND GOALS FOR THE GROUP (2) BUILD A WEBSITE FOR THE WATER INITIATIVE THAT HOUSES PRIORITIZED PROJECT IDEAS AND HIGHLIGHTS COMPLETED PROJECTS AND COLLABORATIVE RESTORATION EFFORTS (3) FACILITATE QUARTERLY MEETINGS TO SHARE UPDATES AND IDENTIFY, RANK, AND DEVELOP IMPLEMENTATION PLANS FOR AQUATIC CONSERVATION AND RESTORATION PROJECTS (4) CONTINUE OUTREACH EFFORTS WITH LANDOWNERS TO IDENTIFY ADDITIONAL PROJECTS AND (5) ADVANCE TOP-RANKED PROJECTS, INCLUDING COMPLETION OF DESIGN AND ENGINEERING FOR 2-4 ON-THE-GROUND RESTORATION PROJECTS. THESE ACTIVITIES WILL INCREASE THE PACE AND SCALE OF AQUATIC RESOURCE RESTORATION AND CONSERVATION IN THE UPPER YELLOWSTONE WATERSHED, INCREASE COLLABORATION AND COORDINATION AMONG A DIVERSE GROUP OF PARTNERS AND STAKEHOLDERS, AND ULTIMATELY INCREASE WATERSHED RESILIENCE TO THE NUMEROUS PRESSURES THE SYSTEM IS FACING.MTMONTANA FRESHWATER PARTNERS, INC$300K—
MT - YT CO2 SYSTEM REPLACEMENT DESIGNMTCDM FEDERAL PROGRAMS CORPORATION$133K—
FIRE CASE STUDY PRESENTATIONSWAINTER-FLUVE, INC.$29K—
LOWER CHIWAWA AREA D, 60% DESIGNWAINTER-FLUVE, INC.$93K—
TSC NAVAJO-GALLUP BLENDING STUDYCOTHE REGENTS OF THE UNIVERSITY OF COLORADO$24K—
HORSESHOE-CAREFREE SEISMIC HAZARD STUDY - FIRM FIXED PRICE PURCHASE ORDER FOR CULTURAL RESOURCE SURVEY AND MONITORING AT THE HORSESHOE AND CAREFREE FAULT IN ARIZONA (TONTO NATIONAL FOREST).AZWESTLAND RESOURCES INC$71K—
THE WORK UNDER THIS COOPERATIVE AGREEMENT WILL BE BROKEN INTO MULTIPLE PHASES, SUCH AS THE PLANNING, DESIGN, AND CONSTRUCTION OF INFRASTRUCTURE IMPROVEMENTS FOR THE YUMA EAST WETLAND (YEW), TO INCREASE LONG TERM EFFICIENCY OF OPERATIONS. DURING PHASE ONE, THE PLANNING PHASE, THE RECIPIENT WILL EVALUATE THE PROJECTS INFRASTRUCTURE FEATURES TO IDENTIFY ALTERNATIVES FOR IMPROVING THE OPERATION OF THE SITE. THIS PHASE WILL CULMINATE IN THE COMPLETION OF THE MASTER WATER CONTROL AND INFRASTRUCTURE PLAN AND A FEASIBILITY LEVEL COST ESTIMATE. THE SECOND PHASE IS DESIGN AND CONSTRUCTION. THE RECIPIENT WILL COMPLETE DETAILED DESIGNS OF THE INFRASTRUCTURE IMPROVEMENTS AND ESTIMATE COSTS. FOLLOWING RECLAMATIONS CONCURRENCE, THE RECIPIENT WILL COMPLETE CONSTRUCTION ACTIVITIES. THE THIRD PHASE IS A CONTINUANCE OF CONSTRUCTION, SUBJECT TO THE AVAILABILITY OF ADDITIONAL FUNDING. PHASES TWO AND THREE SCOPE OF WORK AND BUDGET WILL BE PROVIDED SEPARATELY IN THE FUTURE AND WILL BE INCORPORATED INTO THE AGREEMENT VIA AMENDMENTS.AZCITY OF YUMA$8.8M—
NORTHERN CALIFORNIA AREA OFFICE (NCAO) TRINITY RIVER RESTORATION PROGRAM (TRRP) HYPORHEIC STUDY DATA LOGGERSCAONSET COMPUTER CORPORATION$23K—
2025 SEED TECHNICAL SEMINAR AND STUDY TOUR MOTOR COACHCOMETRO TRAVEL SERVICES INC$9K—
PURPOSE: TO PROVIDE A CONCEPTUAL DESIGN AND COST OPINION FOR A DRINKING WATER TREATMENT PLANT AND ASSOCIATED POTABLE WATER DELIVERY INFRASTRUCTURE, WHILE ALSO CONTINUING TO PROVIDE TECHNICAL INPUT REGARDING THE WATER DELIVERY AND WATER MANAGEMENT ASPECTS OF THE PROPOSED SETTLEMENT TERMS (WITH THE U.S. GOVERNMENT).ACTIVITIES TO BE PERFORMED: PREPARE A CONCEPTUAL DESIGN AND COST OPINION FOR A DRINKING WATER PLANT AND ASSOCIATED DELIVERY INFRASTRUCTURE ON THE RECIPIENTS RESERVATION ANDPROVIDE TECHNICAL INFORMATION TO THE RECIPIENT TO ENSURE THAT THE WATER SOURCES THE RECIPIENT WOULD AGREE TO IN SETTLEMENT (WITH THE U.S. GOVERNMENT) WILL PROVIDE THE RECIPIENT WITH SECURE AND RELIABLE WATER TO MEET THE NEEDS OF THE (RECIPIENTS) RESERVATION AS A PERMANENT TRIBAL HOMELAND.EXPECTED DELIVERABLES OR OUTCOMES: THE RECIPIENT WILL PROVIDE A CONCEPTUAL DESIGN AND COST OPINION FOR A DRINKING WATER PLANT AND ASSOCIATED DELIVERY INFRASTRUCTURE ON THE RECIPIENTS RESERVATIONINTENDED BENEFICIARIES: THE UNITED STATES PUBLIC AND THE RECIPIENT ARE THE INTENDED BENEFICIARIES. SUBRECIPIENT ACTIVITIES: THE RECIPIENT WILL CONTRACT WITHAZYAVAPAI APACHE NATION$300K—
THE ARAVAIPA WATERSHED CONSERVATION ALLIANCE, AN ESTABLISHED WATERSHED GROUP IN THE ARAVAIPA CREEK WATERSHED LOCATED IN SOUTHEASTERN ARIZONA, WILL COMPLETE GROUP DEVELOPMENT, UPDATE THEIR EXISTING WATERSHED RESTORATION PLAN, AND COMPLETE PROJECT DESIGN. PERENNIAL FLOWS INTO ARAVAIPA CREEK HELP MAINTAIN PERENNIAL FLOWS THROUGH DOZENS OF MILES OF THE ADJOINING SAN PEDRO AND GILA RIVERS, HELPING TO SUPPORT DOWNSTREAM COMMUNITIES AND WATER USERS BY REDUCING EROSION AND INCREASING WATER TABLE ELEVATIONS. BUILDING ON A 2021 COOPERATIVE WATERSHED MANAGEMENT PROGRAM PHASE I GRANT, THE ALLIANCE WILL SELECT AND DESIGN PROJECTS THAT ADDRESS CRITICAL WATERSHED ISSUES OF EROSION CONTROL, WATER CONSERVATION, AND CONSERVATION OF RIPARIAN AREAS AND WILL CONTINUE DEVELOPING SUPPORT THROUGH OUTREACH ACTIVITIES INCLUDING EDUCATIONAL SEMINARS AND WORKSHOPS FOR WATERSHED ISSUES BASED ON COMMUNITY STAKEHOLDER INPUT, INTERVIEWS, AND SITE VISITS. THE ALLIANCE BRINGS TOGETHER MULTIPLE STATE AND FEDERAL AGENCIES, UNIVERSITIES, PRIVATE LANDOWNERS, RECREATION INTERESTS, AND AGRICULTURAL USERS.AZARAVAIPA WATERSHED CONSERVATION ALLIANCE$287K—
PURPOSE THE PURPOSE OF THIS PROJECT IS TO DEVELOP AN OPTIMAL, COST EFFECTIVE STANDARD DESIGN PACKAGE FOR A REMOTELY LOCATED STOCKWATERING WELL FACILITYACTIVITIES TO PERFORMED SITE SELECTIONENVIRONMENTAL COMPLIANCEWELL CONSTRUCTION DESIGN AND CONTRACTINGEQUIPMENT RESEARCH, SELECTION, AND PROCUREMENTWELL CONSTRUCTIONEQUIPMENT INSTALLATIONDEMONSTRATIONEVALUATION AND EQUIPMENT SELECTIONSTANDARD DESIGN PACKAGEPROJECT REPORTEXPECTED DELIVERABLES OR OUTCOMES THE RECIPIENT WILL SUBMIT A FINAL PROJECT REPORT TO RECLAMATION INTENDED BENEFICIARIES THE INTENDED BENEFICIARIES OF THIS PROJECT ARE THE GENEERAL PUBLIC AND THE RECIPIENT SUBRECIPIENT ACTIVITIES THE SUBRECIPIENT WILL PERFORM THE ACTIVITIES PERTAINING TO THE WELL DESIGN AND CONSTRUCTIONAZSAN CARLOS APACHE TRIBAL COUNCIL$197K—
THE RECIPIENT AND SUBCONTRACTOR WILL PERFORM ACTIVITIES TOWARDS THE FLASHBOARD AND RADIAL GATE REPLACEMENT AT AHDD 30% DESIGN PROJECT. THE FOLLOWING TASKS FOR THIS SCOPE OF WORK WILL BE:PROJECT MANAGEMENTDATA COLLECTIONSTRUCTURAL COMPETENCE ASSESSMENTAHDD FLASHBOARD REPLACEMENT DESIGNAHDD RADIAL GALE REPLACEMENT DESIGN30% SUBMITTAL PACKAGEAZGILA RIVER INDIAN COMMUNITY$87K—
EO 14398 - LAHONTAN BASIN AREA OFFICE (LBAO) STAMPEDE POWER PLANT EXTRAORDINARY MAINTENANCE (XM) PLANNING STUDYNVSTANTEC CONSULTING SERVICES INC.$1.3M—
WHITWORTH-PAHSIMEROI 15/30 PRELIMINARY DESIGN SUPPORTIDINTER-FLUVE, INC.$112K—
IGF::OT::IGF TO PROVIDE STATISTICAL SUPPORT PERFORMING RESEARCH TO ACCOMPLISH STUDY OBJECTIVESDCCLOUD NINE TECHNOLOGIES INC$640K—
NEW BPA CALL UNDER HUD SPECIAL STUDIES BPA EVALUATION OF THE GREEN AND RESILIENT RETROFIT PROGRAM SCOPING AND DESIGN AND POST-CONSTRUCTION STUDIESDCSUMMIT CONSULTING LLC$128K—
COMPETITIVE AUTODESK, ARCHITECTURE, ENGINEERING & CONSTRUCTION COLLECTION SUBSCRIPTIONDCREGENCY CONSULTING INC$100K—
DESIGN, DELIVER, AND INSTALL ENCLOSURE SYSTEMDCFIXTURELITE, INC.$27K—
BGNDRF TREATMENT BUILDING EXPANSION DESIGN BUILDNMMGC CONTRACTORS INC$15.8M—
TRADITIONAL IN-SITU METHODS ONLY CHARACTERIZE SNOW WATER EQUIVALENT OVER VERY SMALL MEASUREMENT FOOTPRINTS. SNOW WATER EQUIVALENT ESTIMATES FROM SATELLITES HAVE COARSE RESOLUTIONS AND LIMITED ACCURACY, AND AIRBORNE METHODS HAVE LIMITED SPATIAL AND TEMPORAL COVERAGE AND CAN HAVE HIGH COSTS FOR ONGOING MONITORING. RECENTLY, STATIONARY COSMIC RAY NEUTRON SENSORS HAVE BEEN SHOWN TO ACCURATELY MEASURE SNOW WATER EQUIVALENT AT HOURLY TO DAILY TIME STEPS WITH A FOOTPRINT RADIUS AROUND 200 M. A COSMIC RAY NEUTRON ROVER CAN POTENTIALLY BE MOUNTED ON A VEHICLE TO PROVIDE ON DEMAND SNOW WATER EQUIVALENT ESTIMATES AT 670- M INTERVALS OVER TENS OF KILOMETERS IN A FEW HOURS. THE PRIMARY OBJECTIVE OF THIS STUDY IS TO DEMONSTRATE AND EVALUATE THE USE OF A COSMIC RAY NEUTRON ROVER FOR MONITORING SNOW WATER EQUIVALENT. THE STUDY REGION WILL BE THE WESTERN SAN JUAN MOUNTAINS IN COLORADO. THE COSMIC RAY NEUTRON ROVER APPROACH WILL BE EVALUATED BY USING A ROVER IN A SERIES OF PROGRESSIVELY MORE CHALLENGING TESTS. THE POTENTIAL BENEFITS OF USING THE ROVER MEASUREMENTS TO ENHANCE SNOW WATER EQUIVALENT MONITORING WILL BE QUANTIFIED BY COMPARING THE SNOW WATER EQUIVALENT ESTIMATES FROM THE ROVER TO ESTIMATES FROM ADJACENT SNOW TELEMETRY NETWORK SITES AND SNOW DATA ASSIMILATION SYSTEM PRODUCTS. TECHNOLOGY TRANSFER WILL BE ACCOMPLISHED THROUGH PARTNERSHIPS WITH RECLAMATION AND THE COLORADO BASIN RIVER FORECAST CENTER.COCOLORADO STATE UNIVERSITY$672K—
PURPOSE: THE PURPOSE OF THIS AWARD IS TO BUILD THE CAPACITY OF HUD'S SPECIAL NEEDS ASSISTANCE PROGRAM CUSTOMER ORGANIZATIONS TO DEPLOY CONTINUUM OF CARE AND EMERGENCY SOLUTIONS GRANT PROGRAMS EFFECTIVELY AND IN COMPLIANCE WITH ASSOCIATED RULES AND REGULATIONS.; ACTIVITIES TO BE PERFORMED: HUD WILL IDENTIFY SPECIFIC TECHNICAL ASSISTANCE NEEDS TO BE ADDRESSED THROUGH A DEMAND-RESPONSE PROGRAM MODEL. THE RECIPIENT MAY RESPOND TO THOSE NEEDS THROUGH A RANGE OF ELIGIBLE ACTIVITIES: NEEDS ASSESSMENTS; DIRECT TECHNICAL ASSISTANCE AND CAPACITY BUILDING; DEVELOPMENT AND MAINTENANCE OF TOOLS AND PRODUCTS; SELF-DIRECTED AND GROUP LEARNING; KNOWLEDGE MANAGEMENT; DATA ANALYSIS, REPORTING, AND PERFORMANCE MEASUREMENT; ADMINISTRATION; AND COORDINATION. ; EXPECTED OUTCOMES: OUTCOMES ARE THE RESULTS OF TECHNICAL ASSISTANCE ACTIVITIES, INCLUDING BUT NOT LIMITED TO CHANGES IN MANAGEMENT OR OPERATION OF HUD-FUNDED PROGRAMS OR INITIATIVES. SPECIFIC OUTCOMES WILL VARY BASED ON THE NATURE OF THE ACTIVITIES CARRIED OUT. STANDARD OUTCOME CATEGORIES INCLUDE IMPROVED CAPACITY TO DESIGN PROGRAMS, POLICIES, AND STRATEGIES AS WELL AS TO DELIVER PROJECTS, PROGRAMS, OR SYSTEMS THAT ADDRESS COMMUNITY NEEDS AS DEFINED IN THE TECHNICAL ASSISTANCE (TA) SCOPE.; INTENDED BENEFICIARIES: SELECTED AWARD RECIPIENTS WILL BE DEPLOYED AS HUD DEEMS MOST NECESSARY ACROSS THE COUNTRY TO ASSIST ORGANIZATIONS RECEIVING HUD FUNDS TO IMPROVE PERFORMANCE AND MANAGEMENT OF HUD FUNDS. BENEFICIARIES WILL VARY BY ACTIVITY AND INCLUDE TECHNICAL ASSISTANCE CUSTOMERS OF HUD'S SPECIAL NEEDS ASSISTANCE PROGRAMS WHICH MANAGE AWARDS MADE UNDER A MCKINNEY-VENTO OR HEARTH ACT AUTHORIZATION.; SUBRECIPIENT ACTIVITIES: SUBRECIPIENT ACTIVITIES ARE UNKNOWN AT THE TIME OF AWARD.FLCORPORATE FACTS, INC$417K—
MECH ENG DESIGN & CONST SUPPORT SERVICESCOHDR SCHNABEL RECLAMATION JOINT VENTURE$167K—
MT - DRY-REDWATER FEASIBILITY STUDYMTSTANTEC CONSULTING SERVICES INC.$1.3M—
EO 14398 - TSC EL VADO TPRB CIVIL ENGINEERINGCOSTANTEC CONSULTING SERVICES INC.$120K—
ASSESS CONDITION OF DURANTS INTAKESTHIS TASK WILL INVOLVE AN ENGINEERING STUDY AND REPORT EVALUATING THE INTEGRITY OF THE TWO BLUE RIVER INTAKE STRUCTURES AND THE INTAKE STRUCTURE ON LAKE DURANT FOR LONG-TERM WATER SUPPLY NEEDS. THE STUDY WILL RESULT IN RECOMMENDED IMPROVEMENTS FOR THE CONTINUED VIABILITY OF THE EXISTING INTAKES AS WELL AS RECOMMENDATIONS TO RETURN THE ABANDONED BLUE RIVER INTAKE TO SERVICE AS A BACKUP INTAKE IN THE EVENT OF DROUGHT OR LOSS OF FUNCTION OF THE EXISTING INTAKE.OKCHOCTAW NATION OF OKLAHOMA$56K—