Arizona engineering contracts
10 contracts tracked across 1 municipality.
Contracts
10
municipalities
1
Distinct vendors
10
municipalities with the most engineering contracts
Top vendors in Arizona engineering
| Vendor | Contracts | Volume |
|---|---|---|
| WESTLAND RESOURCES INC | 1 | $71K |
| CITY OF YUMA | 1 | $8.8M |
| YAVAPAI APACHE NATION | 1 | $300K |
| ARAVAIPA WATERSHED CONSERVATION ALLIANCE | 1 | $287K |
| SAN CARLOS APACHE TRIBAL COUNCIL | 1 | $197K |
| GILA RIVER INDIAN COMMUNITY | 1 | $87K |
Recent engineering contracts in Arizona
| Title | municipality | Vendor | Value | Solicitation |
|---|---|---|---|---|
| HORSESHOE-CAREFREE SEISMIC HAZARD STUDY - FIRM FIXED PRICE PURCHASE ORDER FOR CULTURAL RESOURCE SURVEY AND MONITORING AT THE HORSESHOE AND CAREFREE FAULT IN ARIZONA (TONTO NATIONAL FOREST). | Arizona (Bureau of Reclamation federal awards) | WESTLAND RESOURCES INC | $71K | — |
| THE WORK UNDER THIS COOPERATIVE AGREEMENT WILL BE BROKEN INTO MULTIPLE PHASES, SUCH AS THE PLANNING, DESIGN, AND CONSTRUCTION OF INFRASTRUCTURE IMPROVEMENTS FOR THE YUMA EAST WETLAND (YEW), TO INCREASE LONG TERM EFFICIENCY OF OPERATIONS. DURING PHASE ONE, THE PLANNING PHASE, THE RECIPIENT WILL EVALUATE THE PROJECTS INFRASTRUCTURE FEATURES TO IDENTIFY ALTERNATIVES FOR IMPROVING THE OPERATION OF THE SITE. THIS PHASE WILL CULMINATE IN THE COMPLETION OF THE MASTER WATER CONTROL AND INFRASTRUCTURE PLAN AND A FEASIBILITY LEVEL COST ESTIMATE. THE SECOND PHASE IS DESIGN AND CONSTRUCTION. THE RECIPIENT WILL COMPLETE DETAILED DESIGNS OF THE INFRASTRUCTURE IMPROVEMENTS AND ESTIMATE COSTS. FOLLOWING RECLAMATIONS CONCURRENCE, THE RECIPIENT WILL COMPLETE CONSTRUCTION ACTIVITIES. THE THIRD PHASE IS A CONTINUANCE OF CONSTRUCTION, SUBJECT TO THE AVAILABILITY OF ADDITIONAL FUNDING. PHASES TWO AND THREE SCOPE OF WORK AND BUDGET WILL BE PROVIDED SEPARATELY IN THE FUTURE AND WILL BE INCORPORATED INTO THE AGREEMENT VIA AMENDMENTS. | Arizona (Bureau of Reclamation federal awards) | CITY OF YUMA | $8.8M | — |
| PURPOSE: TO PROVIDE A CONCEPTUAL DESIGN AND COST OPINION FOR A DRINKING WATER TREATMENT PLANT AND ASSOCIATED POTABLE WATER DELIVERY INFRASTRUCTURE, WHILE ALSO CONTINUING TO PROVIDE TECHNICAL INPUT REGARDING THE WATER DELIVERY AND WATER MANAGEMENT ASPECTS OF THE PROPOSED SETTLEMENT TERMS (WITH THE U.S. GOVERNMENT).ACTIVITIES TO BE PERFORMED: PREPARE A CONCEPTUAL DESIGN AND COST OPINION FOR A DRINKING WATER PLANT AND ASSOCIATED DELIVERY INFRASTRUCTURE ON THE RECIPIENTS RESERVATION ANDPROVIDE TECHNICAL INFORMATION TO THE RECIPIENT TO ENSURE THAT THE WATER SOURCES THE RECIPIENT WOULD AGREE TO IN SETTLEMENT (WITH THE U.S. GOVERNMENT) WILL PROVIDE THE RECIPIENT WITH SECURE AND RELIABLE WATER TO MEET THE NEEDS OF THE (RECIPIENTS) RESERVATION AS A PERMANENT TRIBAL HOMELAND.EXPECTED DELIVERABLES OR OUTCOMES: THE RECIPIENT WILL PROVIDE A CONCEPTUAL DESIGN AND COST OPINION FOR A DRINKING WATER PLANT AND ASSOCIATED DELIVERY INFRASTRUCTURE ON THE RECIPIENTS RESERVATIONINTENDED BENEFICIARIES: THE UNITED STATES PUBLIC AND THE RECIPIENT ARE THE INTENDED BENEFICIARIES. SUBRECIPIENT ACTIVITIES: THE RECIPIENT WILL CONTRACT WITH | Arizona (Bureau of Reclamation federal awards) | YAVAPAI APACHE NATION | $300K | — |
| THE ARAVAIPA WATERSHED CONSERVATION ALLIANCE, AN ESTABLISHED WATERSHED GROUP IN THE ARAVAIPA CREEK WATERSHED LOCATED IN SOUTHEASTERN ARIZONA, WILL COMPLETE GROUP DEVELOPMENT, UPDATE THEIR EXISTING WATERSHED RESTORATION PLAN, AND COMPLETE PROJECT DESIGN. PERENNIAL FLOWS INTO ARAVAIPA CREEK HELP MAINTAIN PERENNIAL FLOWS THROUGH DOZENS OF MILES OF THE ADJOINING SAN PEDRO AND GILA RIVERS, HELPING TO SUPPORT DOWNSTREAM COMMUNITIES AND WATER USERS BY REDUCING EROSION AND INCREASING WATER TABLE ELEVATIONS. BUILDING ON A 2021 COOPERATIVE WATERSHED MANAGEMENT PROGRAM PHASE I GRANT, THE ALLIANCE WILL SELECT AND DESIGN PROJECTS THAT ADDRESS CRITICAL WATERSHED ISSUES OF EROSION CONTROL, WATER CONSERVATION, AND CONSERVATION OF RIPARIAN AREAS AND WILL CONTINUE DEVELOPING SUPPORT THROUGH OUTREACH ACTIVITIES INCLUDING EDUCATIONAL SEMINARS AND WORKSHOPS FOR WATERSHED ISSUES BASED ON COMMUNITY STAKEHOLDER INPUT, INTERVIEWS, AND SITE VISITS. THE ALLIANCE BRINGS TOGETHER MULTIPLE STATE AND FEDERAL AGENCIES, UNIVERSITIES, PRIVATE LANDOWNERS, RECREATION INTERESTS, AND AGRICULTURAL USERS. | Arizona (Bureau of Reclamation federal awards) | ARAVAIPA WATERSHED CONSERVATION ALLIANCE | $287K | — |
| PURPOSE THE PURPOSE OF THIS PROJECT IS TO DEVELOP AN OPTIMAL, COST EFFECTIVE STANDARD DESIGN PACKAGE FOR A REMOTELY LOCATED STOCKWATERING WELL FACILITYACTIVITIES TO PERFORMED SITE SELECTIONENVIRONMENTAL COMPLIANCEWELL CONSTRUCTION DESIGN AND CONTRACTINGEQUIPMENT RESEARCH, SELECTION, AND PROCUREMENTWELL CONSTRUCTIONEQUIPMENT INSTALLATIONDEMONSTRATIONEVALUATION AND EQUIPMENT SELECTIONSTANDARD DESIGN PACKAGEPROJECT REPORTEXPECTED DELIVERABLES OR OUTCOMES THE RECIPIENT WILL SUBMIT A FINAL PROJECT REPORT TO RECLAMATION INTENDED BENEFICIARIES THE INTENDED BENEFICIARIES OF THIS PROJECT ARE THE GENEERAL PUBLIC AND THE RECIPIENT SUBRECIPIENT ACTIVITIES THE SUBRECIPIENT WILL PERFORM THE ACTIVITIES PERTAINING TO THE WELL DESIGN AND CONSTRUCTION | Arizona (Bureau of Reclamation federal awards) | SAN CARLOS APACHE TRIBAL COUNCIL | $197K | — |
| THE RECIPIENT AND SUBCONTRACTOR WILL PERFORM ACTIVITIES TOWARDS THE FLASHBOARD AND RADIAL GATE REPLACEMENT AT AHDD 30% DESIGN PROJECT. THE FOLLOWING TASKS FOR THIS SCOPE OF WORK WILL BE:PROJECT MANAGEMENTDATA COLLECTIONSTRUCTURAL COMPETENCE ASSESSMENTAHDD FLASHBOARD REPLACEMENT DESIGNAHDD RADIAL GALE REPLACEMENT DESIGN30% SUBMITTAL PACKAGE | Arizona (Bureau of Reclamation federal awards) | GILA RIVER INDIAN COMMUNITY | $87K | — |
| DESIGN, CONSTRUCTION AND CONSTRUCTION OVERSIGHT FOR REACH 24.1, 25 AND 26 OF THE NAVAJO GALLUP WATER SUPPLY SYSTEM | Arizona (Bureau of Reclamation federal awards) | NAVAJO NATION | $17.4M | — |
| PROVIDE FOR A PROFESSIONAL ENGINEERING LIAISON TO HELP A TRIBAL ORGANIZATION DEVELOP THE NECESSARY PRELIMINARY ENGINEERING PLANS NEEDED TO OBTAIN CONSTRUCTION FUNDING FOR THE DEVELOPMENT OF THE NAVAJO GALLUP WATER SUPPLY PLANT NGWSP THE NGWSP PROVIDES AN OPPORTUNITY TO A TRIBE OR TRIBAL ORGANIZATION TO DEVELOP, MANAGEMENT, AND PROTECT THEIR WATER RESOURCES | Arizona (Bureau of Reclamation federal awards) | NAVAJO TRIBAL UTILITY AUTHORITY | $1.6M | — |
| PURPOSE UPDATE THE CURRENT WRDS WHICH WILL DOCUMENT DATA ON THE CURRENT AVAILABLE WATER SUPPLY AND DEMANDS AND HELP PROJECT FUTURE WATER DEMANDS ACTIVITIES TO PERFORMED MANAGEMENT AND CONSERVATIONDATA COLLECTIONASSESSMENTS AND CHARACTERIZATIONCOMPLETE REPORTEXPECTED DELIVERABLES OR OUTCOMES THE RECIPIENT WILL PROIDE A FINAL REPORT TO RECLAMATION INTENDED BENEFICIARIES THE UNITED STATES PUBLIC AND THE RECIPIENT ARE THE INTENDED BENEFICIARIES SUBRECIPIENT ACTIVITIES THE RECIPIENT WILL CONTRACT WITH RILEY ENGINEERING TO COMPLETE ALL COMPONENTS OF THIS PROJECT | Arizona (Bureau of Reclamation federal awards) | NAVAJO NATION TRIBAL GOVERNMENT | — | — |
| AZ PHASE II GEOLOGIC FAULT STUDY | Arizona (Bureau of Reclamation federal awards) | UNIVERSITY OF ARIZONA | $242K | — |