Idaho engineering contracts
19 contracts tracked across 1 municipality.
Contracts
19
municipalities
1
Distinct vendors
8
municipalities with the most engineering contracts
Top vendors in Idaho engineering
| Vendor | Contracts | Volume |
|---|---|---|
| INTER-FLUVE, INC. | 11 | $4.0M |
| DEPARTMENT OF PARKS & RECREATION IDAHO | 2 | $1.5M |
| JACOBS ENGINEERING GROUP INC | 1 | $3.6M |
| WOOD RIVER LAND TRUST COMPANY | 1 | $200K |
| REGENTS OF THE UNIVERSITY OF IDAHO | 1 | $75K |
| BOISE STATE UNIVERSITY | 1 | $58K |
Recent engineering contracts in Idaho
| Title | municipality | Vendor | Value | Solicitation |
|---|---|---|---|---|
| SERVICES FOR PHASES 3 AND 4 FINAL DESIGN AND PHASE 3 CONSTRUCTION SUPPORT EAGLE VALLEY RANCH | Idaho (Bureau of Reclamation federal awards) | INTER-FLUVE, INC. | $1.3M | — |
| EAGLE ROCK 100 PERCENT DESIGN | Idaho (Bureau of Reclamation federal awards) | INTER-FLUVE, INC. | $159K | — |
| WHITWORTH-PAHSIMEROI 15/30 PRELIMINARY DESIGN SUPPORT | Idaho (Bureau of Reclamation federal awards) | INTER-FLUVE, INC. | $112K | — |
| LOWER SNAKE RIVER WATER SUPPLY STUDY | Idaho (Bureau of Reclamation federal awards) | JACOBS ENGINEERING GROUP INC | $3.6M | — |
| EAGLE VALLEY RANCH ADAPTIVE MANAGEMENT DESIGN, CONSTRUCTION SUPPORT, AND PROJECT COMPLETION REPORT | Idaho (Bureau of Reclamation federal awards) | INTER-FLUVE, INC. | $758K | — |
| PHASE 2 FINAL DESIGN AND CONSTRUCTION SUPPORT EAGLE VALLEY RANCH | Idaho (Bureau of Reclamation federal awards) | INTER-FLUVE, INC. | $509K | — |
| EAGLE VALLEY PHASE ONE FINAL DESIGN AND CONSTRUCTION OBSERVATION | Idaho (Bureau of Reclamation federal awards) | INTER-FLUVE, INC. | $387K | — |
| SERVICES FOR DESIGN SUPPORT MIDDLE PAHSIMEROI RIVER, UPPER SALMON RIVER SUBBASIN, IDAHO | Idaho (Bureau of Reclamation federal awards) | INTER-FLUVE, INC. | $276K | — |
| BAR G-PAHSIMEROI PROJECT 15 AND 30-PERCENT DESIGN SUPPORT | Idaho (Bureau of Reclamation federal awards) | INTER-FLUVE, INC. | $210K | — |
| L-40 DIVERSION IMPROVEMENTS FINAL DESIGN | Idaho (Bureau of Reclamation federal awards) | INTER-FLUVE, INC. | $21K | — |
| WHITWORTH - BIG SPRINGS 15%/30% PRELIMINARY DESIGN SUPPORT | Idaho (Bureau of Reclamation federal awards) | INTER-FLUVE, INC. | $17K | — |
| AWARD PURPOSE: THE PROJECT INTENT IS TO REPLACE THE FAILING SUBGRADE WATER LINES THROUGHOUT THE WALCOTT STATE PARK AND UPGRADE THE WELL DISTRIBUTION SYSTEM.ACTIVITIES TO BE PERFORMED: IDAHO DEPARTMENT OF PARKS AND RECREATION (IDPR) WILL WORK WITH A DESIGN PROFESSIONAL AND CONTRACTOR TO UPDATE THE PARKS WATER SYSTEM, UPGRADE WELL HOUSE EQUIPMENT, AND INSTALL A BACKUP GENERATOR.EXPECTED DELIVERABLES OR OUTCOMES: -INCREASE THE HEALTH AND SAFETY REGARDING THE PUBLICS DOMESTIC WATER CONSUMPTION. -BY UPDATING THE WATER LINES AND WELL DISTRIBUTION SYSTEM MAINTENANCE COSTS WILL DECREASE FOR BOTH IDPR AND RECLAMATION.INTENDED BENEFICIARIES:THIS PROJECT WILL ALLOW THE RECIPIENT TO CONTINUE PROVIDING A SAFE, CLEAN, CARED FOR RECREATIONAL AREA PARK FOR THE PUBLIC.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N A | Idaho (Bureau of Reclamation federal awards) | DEPARTMENT OF PARKS & RECREATION IDAHO | $400K | — |
| THE WOOD RIVER WATER COLLABORATIVE, IN COLLABORATION WITH THE WOOD RIVER LAND TRUST, LOCATED IN SOUTH-CENTRAL IDAHO, WILL UPDATE THE BIG WOOD RIVER ATLAS TO ADDRESS THE HEALTH OF THE NEARBY BIG WOOD WATERSHED S NATURAL FLOODPLAIN. A GROWING POPULATION COMBINED WITH DIMINISHING GROUND AND SURFACE WATER RESOURCES HAVE PUT STRAIN ON THE BIG WOOD RIVER CORRIDOR AND ASSOCIATED AQUIFER. THE COLLABORATIVE WILL CONVENE A WORKING GROUP COMPOSED OF REPRESENTATIVES FROM THE SURROUNDING COMMUNITIES, TROUT UNLIMITED, STATE AND NATIONAL FOREST SERVICE MEMBERS, THE NATURE CONSERVANCY, AND RECREATION GROUPS. THIS UPDATED WATERSHED PLAN WILL CONSIDER POTENTIAL DEVELOPMENT AND RISK TO RIPARIAN HABITATS AND DESIGN SHOVEL-READY PROJECTS TO ADDRESS THESE CONCERNS. THESE EFFORTS WILL ADDRESS RIPARIAN HABITATS, MITIGATE FLOOD RISKS, AND SUPPORT THE FUNCTION OF THE SURROUNDING UNCONFINED AQUIFERS. | Idaho (Bureau of Reclamation federal awards) | WOOD RIVER LAND TRUST COMPANY | $200K | — |
| CLARK'S AND WESTERN GREBE STUDY - SRAO | Idaho (Bureau of Reclamation federal awards) | REGENTS OF THE UNIVERSITY OF IDAHO | $75K | — |
| AWARD PURPOSE: THE PUBLIC PURPOSE OF THIS AGREEMENT IS TO GATHER AND ASSESS IDAHO RESIDENTS PERCEPTIONS , BELIEFS AND ATTITUDES TOWARD SALMONID RECOVERY IN ORDER TO ANTICIPATE CONFLICT AND GUIDE POLICY IMPLEMENTATION. THIS WILL HELP THE EXPERTS IN SALMONID RECOVERY KNOW HOW TO ACCOMPLISH SALMONID RECOVERY WHILE ACCOMMODATING PUBLIC OPINION. ACTIVITIES TO BE PERFORMED: UNDER THIS AGREEMENT, THE RECIPIENT SHALL GATHER AND ASSESS IDAHO RESIDENTS PERCEPTIONS, BELIEFS AND ATTITUDES TOWARD SALMONID RECOVERY. THIS PROJECT WILL CARRY OUT STAGE 3 OF THE IDAHO RESIDENTS SALMONID RECOVERY STUDY WHICH CONSIST OF A GENERAL PUBLIC DISCRETE CHOICE EXPERIMENTAL DESIGN. THIS SURVEY WILL UTILIZE A DISCRETE CHOICE EXPERIMENT (DCE) WHEREIN DECISION MAKING TRADE-OFFS ARE CAPTURED IN COMPLEX CASES AND WHEN ANALYZED IN RELATION TO THE VALUES PERCEPTIONS SURVEY OF STAGES 1 AND 2, HELPING TO PROVIDE INSIGHT INTO THE SOCIAL DECISION MAKING AROUND SALMONID RECOVERY THAT CAN HELP GUIDE FUTURE RECOVERY PROJECTS, POLICY IMPLEMENTATION, AND COMMUNITY COLLABORATIVE EFFORTS. EXPECTED DELIVERABLES OR OUTCOMES: THE EXPECTED DELIVERABLES OUTCOMES INCLUDE THE UNDERSTANDING OF THE PUBLICS PERCEPTIONS OF SALMONID RECOVERY ASSISTING EXPERTS AND POLICY MAKERS TO CREATE RECOVERY PLANS THAT BALANCE PUBLIC PERCEPTION AND BEST PRACTICES. INTENDED BENEFICIARIES: THE INTENDED BENEFICIARIES WILL BE THE PUBLIC WHO WILL BE ABLE TO ENJOY SALMON AND STEELHEAD IN FUTURE GENERATIONS, AS WELL AS TRIBES WHO RELY ON THE ANNUAL RETURN OF SALMONIDS TO THE RIVER SYSTEMS. SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): NONE | Idaho (Bureau of Reclamation federal awards) | BOISE STATE UNIVERSITY | $58K | — |
| LOWER LAPWAI SIDE CHANNEL DESIGN | Idaho (Bureau of Reclamation federal awards) | NEZ PERCE TRIBE | $30K | — |
| BOISE RIVER FEASIBILITY STUDY | Idaho (Bureau of Reclamation federal awards) | HISTORICAL RESEARCH ASSOCIATES, INC. | $317K | — |
| PRELIMINARY DESIGN SUPPORT LEMHI REFERENCE REACH PROJECT | Idaho (Bureau of Reclamation federal awards) | INTER-FLUVE, INC. | $239K | — |
| AWARD PURPOSE: THE PROJECT INTENT IS TO FULLY CONSTRUCT A HOUSING STRUCTURE FOR IDAHO DEPARTMENT OF PARKS AND RECREATION (IDPR) STAFF AT LAKE CASCADE STATE PARK.ACTIVITIES TO BE PERFORMED: FUNDING WILL BE USED TO CONSTRUCT LAKE CASCADE STATE PARK EMPLOYEE HOUSING THAT WILL MEET THE NEEDS OF TWO PERMANENT AND EIGHT SEASONAL STAFF. THE IDAHO DEPARTMENT OF PARKS AND RECREATION WILL MATCH BORS AWARD (I.E., 50 PERCENT COST-SHARE). THE ARCHITECTURAL DESIGN ACTIVITIES INCLUDE BUT ARE NOT LIMITED TO SITE CONSTRICTION, BUILDING CONSTRICTION, ELECTRICAL WORK, PLUMBING, AND FIRE PROTECTION. THE HOUSING STRUCTURE WILL CONSIST OF TWO LEVELS THAT WILL TOTAL APPROXIMATELY 5,574 SQUARE FEET. THE BOTTOM LEVEL OF THE STRUCTURE WILL CONTAIN A DUPLEX CONSISTING OF TWO, TWO-BEDROOM UNITS WITH ATTACHED GARAGES.EXPECTED DELIVERABLES OR OUTCOMES: THE EXPECTED OUTCOME IS TO PROVIDE NECESSARY HOUSING FOR IDPR PERMANENT AND SEASONAL STAFF SO THAT IDPR CAN CONTINUE TO ADEQUATELY IMPLEMENT MANAGEMENT ACTIVITIES AND MAINTAIN THE SAFETY OF LAKE CASCADE STATE PARK. INTENDED BENEFICIARIES: RECLAMATION AND THE IDAHO DEPARTMENT OF PARKS AND RECREATION ENTERED INTO A MANAGING PARTNER AGREEMENT (#21-07-11-L5422) ON MAY 26, 2021. THIS AGREEMENT PROVIDES IDPR THE RESPONSIBILITY OF MANAGEMENT ACTIVITIES AT LAKE CASCADE STATE PARK. ACCORDINGLY, THIS PROJECT WILL ALLOW IDPR TO CONTINUE MEETING ITS OBLIGATIONS UNDER MANAGING PARTNER AGREEMENT #21-07-11-L5422.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N A | Idaho (Bureau of Reclamation federal awards) | DEPARTMENT OF PARKS & RECREATION IDAHO | $1.1M | — |