Montana engineering contracts
11 contracts tracked across 1 municipality.
Contracts
11
municipalities
1
Distinct vendors
10
municipalities with the most engineering contracts
Top vendors in Montana engineering
| Vendor | Contracts | Volume |
|---|---|---|
| STANTEC CONSULTING SERVICES INC. | 2 | $2.1M |
| DRY PRAIRIE RURAL WATER AUTHORITY | 1 | $46.3M |
| DRY-REDWATER REGIONAL WATER AUTHORITY | 1 | $800K |
| MONTANA FRESHWATER PARTNERS, INC | 1 | $300K |
| CDM FEDERAL PROGRAMS CORPORATION | 1 | $133K |
| CENTRAL MONTANA REGIONAL WATER AUTHORITY | 1 | $77.1M |
Recent engineering contracts in Montana
| Title | municipality | Vendor | Value | Solicitation |
|---|---|---|---|---|
| THE AGREEMENT PROVIDES FUNDS TO DRY PRAIRIE RURAL WATER AUTHORITY FOR DESIGN AND CONSTRUCTION OF THE DRY PRAIRIE RURAL WATER SUPPLY SYSTEM ACTIVITIES COMPLETED UNDER THE AGREEMENT WILL ASSIST THE CITIZENS OF ROOSEVELT, SHERIDA, DANIELS, AND VALLEY COUNTIES IN THE STATE, OUTSIDE THE FORT PECK RESERVATION, IN DEVELOPING SAFE AND ADEQUATE MUNICIPAL, RURAL, AND INDUSTRIAL WATER SUPPLIES. | Montana (Bureau of Reclamation federal awards) | DRY PRAIRIE RURAL WATER AUTHORITY | $46.3M | — |
| DRY REDWATER FEASIBILITY STUDY | Montana (Bureau of Reclamation federal awards) | DRY-REDWATER REGIONAL WATER AUTHORITY | $800K | — |
| THE UPPER YELLOWSTONE WATERSHED IS THE HEADWATERS OF THE LONGEST FREE-FLOWING RIVER IN THE CONTIGUOUS UNITED STATES. THE ICONIC YELLOWSTONE RIVER ORIGINATES SOUTHEAST OF YELLOWSTONE NATIONAL PARK IN THE ABSAROKA MOUNTAIN RANGE, FLOWING 671 MILES BEFORE ITS CONFLUENCE WITH THE MISSOURI RIVER. THE UPPER YELLOWSTONE WATERSHED IS EXPERIENCING NUMEROUS PRESSURES ON ITS AQUATIC RESOURCES INCLUDING CURRENT AND LEGACY LAND-USE PRACTICES, HIGH RECREATIONAL USE, OVERALLOCATION OF WATER, INVASIVE SPECIES, CHANNEL ARMORING DIKING, AND CLIMATIC CHANGES. THERE ARE CURRENTLY TWO WATERSHED GROUPS ACTIVE WITHIN THIS GEOGRAPHY. THE UPPER YELLOWSTONE WATERSHED GROUP (UYWG) SERVES THE UPPER YELLOWSTONE RIVER AND ITS TRIBUTARIES FROM THE NATIONAL PARK BOUNDARY IN GARDINER, MT DOWNSTREAM TO CARTERS BRIDGE (JUST UPSTREAM OF LIVINGSTON, MT), WHILE THE SHIELDS VALLEY WATERSHED GROUP (SVWG) SERVES THE SHIELDS RIVER FROM ITS HEADWATER TRIBUTARIES DOWN TO ITS CONFLUENCE WITH THE YELLOWSTONE RIVER. MONTANA FRESHWATER PARTNERS (MFP) HAS BEEN A MEMBER OF BOTH OF THESE WATERSHED GROUPS SINCE 2016 AND HAS BEEN ACTIVELY WORKING WITH THEM TO INCREASE CAPACITY AND COORDINATION TO IMPLEMENT ON-THE-GROUND WATER CONSERVATION AND WATERSHED HEALTH PROJECTS. OVER THE PAST 18 MONTHS, MFP HAS MADE SIGNIFICANT STRIDES IN BRINGING TOGETHER A DIVERSE GROUP OF WATER RESOURCE PROFESSIONALS AND LANDOWNERS TO COLLABORATIVELY IDENTIFY AND PRIORITIZE RESTORATION, PLANNING, AND OUTREACH PROJECTS, WITH THE GOAL OF INCREASING THE HEALTH AND RESILIENCE OF THE UPPER YELLOWSTONE AND SHIELDS WATERSHEDS. THIS PLANNING EFFORT HAS BEEN IN DIRECT CONCERT WITH THE UPPER YELLOWSTONE AND SHIELDS WATERSHED GROUPS, AS WELL AS OTHER LOCAL PARTNERS INCLUDING NGOS AND LOCAL, STATE, AND FEDERAL AGENCIES. THIS LEVEL OF COORDINATION IS PARTICULARLY CRITICAL AS OUR WATERSHED FACES UNPRECEDENTED CHALLENGES POSED BY FACTORS SUCH AS CLIMATE CHANGE, ONGOING DEVELOPMENT, AND INCREASED RECREATIONAL USE. WE ARE SEEKING FUNDING TO FORMALIZE THIS EFFORT THAT WE ARE CALLING THE PARK CO. WATER INITIATIVE (THE WATER INITIATIVE) TO CONTINUE TO COORDINATE AND COLLABORATE ON PROJECT IDENTIFICATION AND RANKING, FUNDING PROCUREMENT AND IMPLEMENTATION. THIS PROPOSAL AIMS TO FUND CAPACITY TO (1) FORMALIZE THE WATER INITIATIVE AND DEVELOP MISSION AND GOALS FOR THE GROUP (2) BUILD A WEBSITE FOR THE WATER INITIATIVE THAT HOUSES PRIORITIZED PROJECT IDEAS AND HIGHLIGHTS COMPLETED PROJECTS AND COLLABORATIVE RESTORATION EFFORTS (3) FACILITATE QUARTERLY MEETINGS TO SHARE UPDATES AND IDENTIFY, RANK, AND DEVELOP IMPLEMENTATION PLANS FOR AQUATIC CONSERVATION AND RESTORATION PROJECTS (4) CONTINUE OUTREACH EFFORTS WITH LANDOWNERS TO IDENTIFY ADDITIONAL PROJECTS AND (5) ADVANCE TOP-RANKED PROJECTS, INCLUDING COMPLETION OF DESIGN AND ENGINEERING FOR 2-4 ON-THE-GROUND RESTORATION PROJECTS. THESE ACTIVITIES WILL INCREASE THE PACE AND SCALE OF AQUATIC RESOURCE RESTORATION AND CONSERVATION IN THE UPPER YELLOWSTONE WATERSHED, INCREASE COLLABORATION AND COORDINATION AMONG A DIVERSE GROUP OF PARTNERS AND STAKEHOLDERS, AND ULTIMATELY INCREASE WATERSHED RESILIENCE TO THE NUMEROUS PRESSURES THE SYSTEM IS FACING. | Montana (Bureau of Reclamation federal awards) | MONTANA FRESHWATER PARTNERS, INC | $300K | — |
| MT - YT CO2 SYSTEM REPLACEMENT DESIGN | Montana (Bureau of Reclamation federal awards) | CDM FEDERAL PROGRAMS CORPORATION | $133K | — |
| MT - DRY-REDWATER FEASIBILITY STUDY | Montana (Bureau of Reclamation federal awards) | STANTEC CONSULTING SERVICES INC. | $1.3M | — |
| MT - DRY-REDWATER FEASIBILITY STUDY TO 2 | Montana (Bureau of Reclamation federal awards) | STANTEC CONSULTING SERVICES INC. | $798K | — |
| THE PURPOSE OF THIS AGREEMENT IS TO PROVIDE FUNDS TO CENTRAL MONTANA REGIONAL WATER AUTHORITY FOR THE PLANNING, DESIGN, AND CONSTRUCTION OF THE MUSSELSHELL JUDITH RURAL WATER SYSTEM. THE RURAL WATER SYSTEM WILL PROVIDE A SAFE AND ADEQUATE MUNICIPAL, RURAL, AND INDUSTRIAL WATER SUPPLY FOR THE CITIZENS OF DAWSON, GARFIELD, MCCONE, PRAIRIE, RICHLAND, JUDITH BASIN, WHEATLAND, GOLDEN VALLEY, FERGUS, YELLOWSTONE, AND MUSSELSHELL COUNTIES IN THE STATE OF MONTANA, AND MCKENZIE COUNTY IN THE STATE OF NORTH DAKOTA. | Montana (Bureau of Reclamation federal awards) | CENTRAL MONTANA REGIONAL WATER AUTHORITY | $77.1M | — |
| THE PURPOSE OF THE AWARDIS TO PLAN, DESIGN, AND CONSTRUCT THE NORTH CENTRAL MONTANA REGIONAL WATER SYSTEM TO ENSURE A SAFE AND ADEQUATE RURAL, MUNICIPAL, AND INDUSTRIAL WATER SUPPLY FOR THE RESIDENTS OF CHOUTEAU, GLACIER,HILL, LIBERTY, PONDERA, TETON, AND TOOLE COUNTIES, MONTANA.THE AGREEMENT AUTHORIZES THE HAVRE CONSTRUCTION PROJECT AND THE HILL COUNTY WATER DISTRICT CONSTRUCTION PROJECT. | Montana (Bureau of Reclamation federal awards) | NORTH CENTRAL MONTANA REGIONAL WATER AUTHORITY | $56.9M | — |
| UPPER MISSOURI RIVER PALLID STURGEON TAGGING AND TELEMETRY STUDY II | Montana (Bureau of Reclamation federal awards) | FISH WILDLIFE & PARKS MONTANA DEPARTMENT | $219K | — |
| THE BIG HOLE WATERSHED COMMITTEE, AN EXISTING WATERSHED GROUP LOCATED IN DIVIDE, MONTANA, WILL DESIGN WATERSHED MANAGEMENT ACTIVITIES THAT WILL RESTORE THE ABANDONED ELKHORN MINE AND MILL SITE AND MITIGATE DOWNSTREAM CONTAMINATION THE MINE HAS A DOCUMENTED HISTORY OF BEING A POINT AND NON POINT SOURCE FOR POLLUTION THAT IS AN ONGOING RISK TO THE AQUATIC ECOSYSTEM AND DOWNSTREAM PUBLIC DRINKING WATER SUPPLIES THE COMMITTEE IS CURRENTLY COMPOSED OF A 22 MEMBER GOVERNING BOARD THAT REPRESENTS DIVERSE INTERESTS INCLUDING RANCHING, UTILITIES, LOCAL GOVERNMENT, SPORTSMEN, CONSERVATIONISTS, TOURISM, AND OUTFITTERS FEDERAL AND STATE AGENCIES PARTICIPATE IN AN ADVISORY ROLE THE WATERSHED GROUP WORKS IN THE ENTIRE BIG HOLE WATERSHED AND THIS PROJECT WILL FOCUS ON ELKHORN CREEK, A HEADWATER TRIBUTARY ENTIRELY WITHIN THE NATIONAL FOREST THE GROUP WILL FOCUS ON STAKEHOLDER COORDINATION, CULTURAL RESOURCE ASSESSMENTS, WATER AND SOIL CONTAMINATION CHARACTERIZATION STUDIES, AND PRELIMINARY ENGINEERING DESIGNS FOR WATER RESOURCE RESTORATION THROUGH THE REMOVAL OF CONTAMINATION | Montana (Bureau of Reclamation federal awards) | BIG HOLE WATERSHED COMMITTEE | $100K | — |
| IGF::CT::IGF CRITICAL FUNCTION - RECOATING OF REPLECEMENT OF ARMATURE WINDINGS, FIELD POLES, AND STATOR CORES ON THE FOUR GENERATORS AT YELLOWTAIL POWERPLANT. THE CONTRACT INCLUDES DESIGN, FABRICATE AND INSTALL. | Montana (Bureau of Reclamation federal awards) | NATIONAL ELECTRIC COIL, INC. | $44.5M | — |