Washington dam reservoir contracts
44 contracts tracked across 1 municipality.
Contracts
44
municipalities
1
Distinct vendors
33
municipalities with the most dam reservoir contracts
Top vendors in Washington dam reservoir
| Vendor | Contracts | Volume |
|---|---|---|
| CONFEDERATED TRIBES AND BANDS OF THE YAKAMA NATION | 6 | $5.5M |
| JACOBS ENGINEERING GROUP INC | 4 | $1.9M |
| CONFEDERATED TRIBES OF COLVILLE RESERVATION | 2 | $89K |
| PUGET SOUND ENERGY INC | 2 | $531K |
| VERTICAL OPTIONS LLC | 2 | $364K |
| BCI CONSTRUCTION USA, INC. | 1 | $25.5M |
Recent dam reservoir contracts in Washington
| Title | municipality | Vendor | Value | Solicitation |
|---|---|---|---|---|
| GRAND COULEE DAM LEFT AND RIGHT POWERHOUSES BRIDGE CRANE REPLACEMENTS | Washington (Bureau of Reclamation federal awards) | BCI CONSTRUCTION USA, INC. | $25.5M | — |
| TOWN OF COULEE DAM UNDERGROUND FEEDERS 1, 3, 4 REPLACEMENT PROJECT, WASHINGTON, BUREAU OF RECLAMATION C-PN REGION | Washington (Bureau of Reclamation federal awards) | PALOUSE POWER LLC | $7.4M | — |
| CLE ELUM RESERVOIR CCT TCP STUDY | Washington (Bureau of Reclamation federal awards) | CONFEDERATED TRIBES OF COLVILLE RESERVATION | $40K | — |
| COMPLETE A HISTORIC AMERICAN ENGINEERING RECORD (HAER) LEVEL II REPORT OF THE CLE ELUM DAM IN KITTITAS COUNTY, WASHINGTON. | Washington (Bureau of Reclamation federal awards) | ENVIRONMENTAL MANAGEMENT & PLANNING SOLUTIONS LLC | $90K | — |
| G22, G23, AND G24 OVERHAUL, GRAND COULEE DAM, THIRD POWERPLANT, WASHINGTON. TOTAL AMOUNT OF PROJECT: $101,971,541.00. | Washington (Bureau of Reclamation federal awards) | ANDRITZ HYDRO CORP | $149.2M | — |
| IGF::OT::IGF REVERSE FLOW GATES, JOHN W. KEYS III PUMP GENERATING PLANT, GRAND COULEE DAM, WASHINGTON. | Washington (Bureau of Reclamation federal awards) | GREENBERRY INDUSTRIAL LLC | $31.6M | — |
| GRAND COULEE DAM RIGHT POWERPLANT 14-TON SEMI-GANTRY CRANE UPPER RAIL REPAIR | Washington (Bureau of Reclamation federal awards) | MARINE VENTURES INTERNATIONAL, INC. | $648K | — |
| PROJECT: ENGINEERING SUPPORT FOR GRAND COULEE DAM FEEDERS #1, #3, & #4 REPLACEMENT/UPGRADE; GRAND COULEE, WA | Washington (Bureau of Reclamation federal awards) | JACOBS ENGINEERING GROUP INC | $502K | — |
| KACHESS RESERVOIR CCT TCP STUDY | Washington (Bureau of Reclamation federal awards) | CONFEDERATED TRIBES OF COLVILLE RESERVATION | $49K | — |
| AWARD PURPOSE: TO PROVIDE DESIGN, LIMITED PERMITTING, AND CONSTRUCTION SUPPORT SERVICES ASSOCIATED WITH DECONSTRUCTION OF HEAD GATE STRUCTURE AND ROCK CHECK DAM STRUCTURE, AND PROVIDING DOWNSTREAM CONNECTION OF EXISTING TJOSSEM DITCH TO REDUCE POTENTIAL FROM FISH STRANDING.ACTIVITIES TO BE PERFORMED: REMOVE EXISTING HEAD-GATE CULVERT AND ROCK CHECK DAM STRUCTURE (AS PREVIOUSLY PROPOSED) ROCK CHECK DAM STRUCTURE WILL NOT BE REPLACED WITH NEW HYDRAULIC CONTROL IN THE TJOSSEM ACCESS CHANNEL, AND TJOSSEM ACCESS CHANNEL WILL BE ALLOWED TO RESUME NATURAL CONDITIONS. REPLACE HEAD-GATE CULVERT WITH EMBANKMENT LEVEE OF COMPARABLE NATURE CHARACTER TO ADJACENT LEVEE. PROVIDE UP TO TWO (2) NEW DOWNSTREAM CONNECTIONS OF TJOSSEM DITCH TO EXISTING SIDE CHANNEL(S) TO REDUCE POTENTIAL FOR STRANDING. ONE CONNECTION WILL BE PROVIDED UPSTREAM OF EXISTING CULVERT (WASTEWATER ACCESS ROAD) AND ONE CONNECTION WILL BE PROVIDED IN THE VICINITY OF EXISTING FISH SCREEN. REVEGETATE WITH APPROPRIATE RIPARIAN SPECIES SUCH AS COTTONWOOD TO SUPPORT RECOVERY OF FLOODPLAIN FOREST SUPPORTED BY SHALLOW GROUNDWATER IN LIEU OF EXISTING WETLAND HYDROLOGY CHARACTER.EXPECTED DELIVERABLES OR OUTCOMES: ATTEND COORDINATION MEETINGS WITH STAKEHOLDER GROUP TO DISCUSS PREFERRED ALTERNATIVE INCLUDING DESIGN PERMITTING CONSIDERATIONS. PERFORM WETLANDS JURISDICTIONAL REVIEW PERFORM CRITICAL AREAS REVIEW AND SUPPORT PREPARE HABITAT MANAGEMENT AND MITIGATION PLAN CONDUCT REVIEW GEOTECHNICAL SITE CONDITIONS AND PREPARE GEOTECHNICAL RECOMMENDATIONS FOR EMBANKMENT RE-CONSTRUCTION TO FACILITATE REPLACEMENT HEADGATE AND CULVERT(S). DEVELOP CONCEPTUAL SCHEMATIC SITE DRAWINGS AND BRIEF DESIGN REPORT. PREPARE PRELIMINARY DESIGN REPORT, DRAWINGS, AND ENGINEERING COST ESTIMATE PREPARE FINAL DESIGN REPORT AND DRAWINGS, INCLUDING TECHNICAL SPECIFICATIONS, FINAL CONSTRUCTION QUANTITIES AND COSTS, CONSTRUCTION BIDDING DOCUMENT, AND ANTICIPATED SCHEDULE. DEVELOP FINAL COST ESTIMATE. PROVIDE MONTHLY BILLING INVOICES WITH A COMPLETE EXPLANATION OF DATES OF SERVICE, HOURS, COST, WORK PERFORMED, AND ADDITIONAL NOTES AS NEEDED OR REQUESTED BY TU STAFF.INTENDED BENEFICIARIES:TJOSSEM DITCH RESTORATION PROJECT WILL REDUCE FISH ENTRAINMENT AND STRANDING IN TJOSSEM DITCH. THIS PROJECT BENEFITS THE YAKIMA BASIN ECOSYSTEM BY CLOSING A 2 MILE LONG IRRIGATION DITCH. THE PROJECT WILL ALSO ALLOW FOR AN EXPANDED FLOODPLAIN ENHANCEMENT PROJECT THAT WILL CREATE MORE FUNCTIONAL HABITAT.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): TO PROTECT, MITIGATE, AND ENHANCE FISH AND WILDLIFE THROUGH IMPROVED WATER MANAGEMENT IMPROVED INSTREAM FLOWS IMPROVED WATER QUALITY PROTECTION, CREATION AND ENHANCEMENT OF WETLANDS AND BY OTHER APPROPRIATE MEANS OF HABITAT IMPROVEMENT. | Washington (Bureau of Reclamation federal awards) | TROUT UNLIMITED, INC. | $71K | — |
| GRAND COULEE DAM LEFT&RIGHT POWERPLANTS G1-G18 PENSTOCK LINING REHABILITATION | Washington (Bureau of Reclamation federal awards) | HARTMAN-WALSH PAINTING COMPANY | $20.2M | — |
| DESIGN, MANUFACTURE, AND DELIVERY OF TWO (2) 90-INCH JET-FLOW GATE VALVES FOR USE AT THE PALISADES DAM IN EASTERN IDAHO. | Washington (Bureau of Reclamation federal awards) | DEZURIK, INC. | $7.4M | — |
| SANDELIN, ROCK REVETMENT, CLE ELEM RESERVOIR, WASHINGTON | Washington (Bureau of Reclamation federal awards) | REHBEIN ENTERPRISES INC | $5.5M | — |
| GRAND COULEE DAM RIGHT POWER PLANT (RPP), LEFT POWER PLANT (LPP), WASHINGTON POWER PLANT (WPP) AND PGP BATTERY ROOM UPGRADES, GRAND COULEE, WASHINGTON, BUREAU OF RECLAMATION C-PN REGION | Washington (Bureau of Reclamation federal awards) | SOUZA CONSTRUCTION, INC. | $5.1M | — |
| GC DAM RIGHT POWERHOUSE (RPH) AND LEFT POWERHOUSE (LPH) STATION SERVICE EQUIPMENT | Washington (Bureau of Reclamation federal awards) | HDR ENGINEERING, INC. | $4.4M | — |
| JANITORIAL SERVICES FOR GRAND COULEE DAM, WA | Washington (Bureau of Reclamation federal awards) | NORTH WIND FEDERAL SERVICES, LLC | $4.1M | — |
| WORK IS LOCATED AT KACHESS DAM, APPROXIMATELY 45 MILES NORTHWEST OF ELLENSBURG, WASHINGTON, IN KITTITAS COUNTY. WORK PERFORMED AS PART OF THIS CONTRACT IS FOR SITE PREPARATION FOR A FUTURE MODIFICATION. PRINCIPAL COMPONENTS INCLUDE TREE CLEARING, ACC | Washington (Bureau of Reclamation federal awards) | S.E.A. CONSTRUCTION LLC | $2.5M | — |
| ROZA DIVERSION DAM- FINAL DESIGN OF REMOVAL OF WATER FEATURES | Washington (Bureau of Reclamation federal awards) | JACOBS ENGINEERING GROUP INC | $1.1M | — |
| TOWN OF COULEE DAM UTILITIES | Washington (Bureau of Reclamation federal awards) | TOWN OF COULEE DAM | $711K | — |
| WORK IS LOCATED AT KACHESS DAM, LOCATED ABOUT 14 MILES NORTHWEST OF CLE ELUM, WASHINGTON, IN KITTITAS COUNTY. WORK PERFORMED AS PART OF THIS CONTRACT IS PART OF THE KACHESS SAFETY OF DAMS PROJECT. PRINCIPAL COMPONENT OF WORK IS TO UPGRADE AND RELOC | Washington (Bureau of Reclamation federal awards) | PUGET SOUND ENERGY INC | $322K | — |
| CLE ELUM DAM HIGH VOLTAGE REPLACE/BUILD | Washington (Bureau of Reclamation federal awards) | PUGET SOUND ENERGY INC | $209K | — |
| 140R1019D0006 C-PN GENERAL AE IDIQ, 140R1024F0024 JACOBS ENGINEERING, SCOGGINS DAM UTILITY SURVEY | Washington (Bureau of Reclamation federal awards) | JACOBS ENGINEERING GROUP INC | $204K | — |
| ELEVATOR INSPECTIONS, PREVENTATIVE MAINTENANCE AND REPAIRS FOR COLUMBIA-CASCADES AREA AND YAKIMA FIELD OFFICES AND CLE ELUM AND KEECHELUS DAM, WASHINGTON STATE | Washington (Bureau of Reclamation federal awards) | VERTICAL OPTIONS LLC | $201K | — |
| PURCH OF 750 LOTEK RADIO TRANS ROZ DAM | Washington (Bureau of Reclamation federal awards) | LOTEK WIRELESS INC. | $139K | — |
| STORAGE DAM FISH PASSAGE FEASIBILITY STUDY, PHASE III | Washington (Bureau of Reclamation federal awards) | CONFEDERATED TRIBES AND BANDS OF THE YAKAMA NATION | $817K | — |
| AWARD PURPOSE: THE YAKIMA-TIETON IRRIGATION DISTRICT WILL BUILD LONG-TERM DROUGHT RESILIENCE BY EXPANDING SMALL-SCALE SURFACE WATER STORAGE AND INCREASING STREAM FLOW TO LEVELS THAT ARE BIOLOGICALLY COMPATIBLE FOR THREATENED OR ENDANGERED SPECIES IN LOW-FLOW AREAS. THE PROJECT, LOCATED IN YAKIMA COUNTY, WASHINGTON, WILL COMPLETE DESIGN, PERMITTING, AND CONSTRUCTION OF TWO NEW TURNOUTS ON THE MAIN DISTRIBUTION PIPELINE AND WILL RAISE THE RESERVOIR POOL ELEVATION AT FRENCH CANYON DAM WHICH IS A RECLAMATION PROJECT. THIS WILL BE ACHIEVED BY INSTALLING NEW, PRE-ENGINEERED GATE EQUIPMENT AT THE SPILLWAY CREST. ACTIVITIES TO BE PERFORMED: ACTIVITIES FOR THIS PROJECT WILL RAISE THE RESERVOIR POOL ELEVATION BY APPROXIMATELY 5 FEET AT FRENCH CANYON DAM TO ADD ADDITIONAL STORAGE. THE RECIPIENT SHALL ALSO DESIGN, PERMIT, AND CONSTRUCT TWO NEW TURNOUTS ON THE MAIN DISTRIBUTION PIPELINE.EXPECTED DELIVERABLES OR OUTCOMES: THE BENEFITS ADD AN ADDITIONAL 144 ACRE-FEET OF WATER PER YEAR OF INCREASED STORAGE TO PROVIDE INSTREAM FLOW AND FISH HABITAT BENEFITS TO COWICHE CREEK AND ADDITIONAL STORAGE AND OPERATIONAL FLEXIBILITY TO THE DISTRICT WHICH WOULD BUILD LONG-TERM RESILIENCE TO DROUGHT.INTENDED BENEFICIARIES: THE PROPOSED FRENCH CANYON DAM AND COWICHE CREEK WATER EXCHANGE IMPROVEMENTS PROJECT WILL INCREASE THE RELIABILITY OF WATER SUPPLIES AND PROVIDE BENEFITS FOR FISH, WILDLIFE, AND OR THE ENVIRONMENT TO MITIGATE THE IMPACTS CAUSED BY DROUGHT. SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N A | Washington (Bureau of Reclamation federal awards) | YAKIMA-TIETON IRRIGATION DISTRICT | $789K | — |
| CLE ELUM DAM FISH PASSAGE FACILITY ADULT FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON | Washington (Bureau of Reclamation federal awards) | GARCO CONSTRUCTION, INC. | $61.2M | — |
| FISH SCREEN REPLACEMENT - ROZA DIVERSION DAM | Washington (Bureau of Reclamation federal awards) | ADVANCED AMERICAN CONSTRUCTION, INC. | $29.5M | — |
| KACHESS DAM MODIFICATION PHASE 3 YAKIMA PROJECT, WASHINGTON, BUREAU OF RECLAMATION C-PN REGION | Washington (Bureau of Reclamation federal awards) | PIPKIN INC. | $18.7M | — |
| CLEAR CREEK DAM FISH PASSAGE FACILITY, YAKIMA PROJECT, WASHINGTON | Washington (Bureau of Reclamation federal awards) | WHH NISQUALLY FEDERAL SERVICES, LLC | $1.3M | — |
| LAND SURVEY - LVN WNFH FOGHORN DAM | Washington (Bureau of Reclamation federal awards) | S&F LAND SERVICES, LLC | $172K | — |
| QUARTERLY PREVENTIVE MAINTENANCE AND ANNUAL INSPECTIONS FOR THE KEECHELUS AND CLE ELUM DAM IN WASHINGTON STATE | Washington (Bureau of Reclamation federal awards) | VERTICAL OPTIONS LLC | $164K | — |
| FINAL DESIGN LEVEL COST ESTIMATE FOR RADIO SYSTEM MODERNIZATION GRAND COULEE DAM | Washington (Bureau of Reclamation federal awards) | JACOBS ENGINEERING GROUP INC | $79K | — |
| KACHESS RESERVOIR TCP STUDY-YN | Washington (Bureau of Reclamation federal awards) | CONFEDERATED TRIBES AND BANDS OF THE YAKAMA NATION | $69K | — |
| AWARD PURPOSE: THE PURPOSE OF THIS AWARD IS TO REDUCE THE DEMAND ON THE CITY OF CHENEYS POTABLE WATER SUPPLY BY SUPPLYING UP TO 1 MILLION GALLONS OF IRRIGATION WATER THROUGH INFRASTRUCTURE IMPROVEMENTS AND A NEW IRRIGATION PIPELINE PROVIDING WATER TO CITY PARKS, PLAYFIELDS, CEMETERIES, PUBLIC SCHOOLS, AND EASTERN WASHINGTON UNIVERSITY. ACTIVITIES TO BE PERFORMED: THE RECIPIENT SHALL: CONSTRUCT THE CHENEY PURPLE PIPE PROJECT PROVIDING AN ALTERNATE SOURCE AND SUPPLY OF UP TO ONE MILLION GALLONS PER DAY OF IRRIGATION WATER DURING THE MONTHS OF APRIL THROUGH SEPTEMBER. THE PROPOSED INFRASTRUCTURE IMPROVEMENTS FOR THE PROJECT INCLUDE CONSTRUCTION OF UPGRADES TO THE MOTOR CONTROL CENTERS AND STANDBY POWER SYSTEM, NEW RECLAIMED WATER TREATMENT SYSTEM, COVERING THE EXISTING RECLAIMED WATER STORAGE RESERVOIR, AND NEW RECLAIMED WATER PUMP STATION AT THE CITY S EXISTING WASTEWATER TREATMENT AND RECLAMATION PLANT (WTRP), AND A THREE-MILE LONG TRANSMISSION PIPELINE AND DISTRIBUTION SYSTEM TO CONVEY THE RECLAIMED WATER TO THE IRRIGATION SITES.EXPECTED DELIVERABLES OR OUTCOMES: UNDER THIS PROJECT, THE RECLAIMED WATER SUPPLY WILL BE PRODUCED AT THE WASTEWATER TREATMENT PLANT AND DISTRIBUTED TO VARIOUS PUBLIC SCHOOLS, PARKS, ATHLETIC FIELDS AND A CEMETERY WITHIN THE CITY LIMITS. INTENDED BENEFICIARIES: THE COMMUNITY OF CHENEY AS A WHOLE. SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): NONE | Washington (Bureau of Reclamation federal awards) | CITY OF CHENEY | $5.5M | — |
| AWARD PURPOSE: THROUGH WORK ON THE YAKIMA BASIN INTEGRATED PLAN (YBIP) YAKIMA COUNTY BECAME AWARE OF THIS PROJECT AND DECIDED TO BE THE PROJECT MANAGEMENT AGENCY SINCE IT REQUIRED CONSTRUCTION OF PUBLIC INFRASTRUCTURE. THE COUNTY HAS BEEN PLANNING AND DESIGNING THIS PROJECT FOR SEVERAL YEARS WITH INPUT FROM YBIP PARTNERS INCLUDING THE YAKAMA NATION, WDFW, USFWS, FOREST SERVICE AND RECLAMATION. THE PROJECT HAS TWO COMPONENTS, COMPLETION OF THE 1985 AGREEMENT TO TRANSFER THE ROAD TO YAKIMA COUNTY, AND CONSTRUCTION OF A NEW BRIDGE NEAR THE OLD CHANNEL ALIGNMENT, TO ALLOW FISH PASSAGE INTO AND OUT OF TIETON RESERVOIR OVER A MUCH LONGER TIME FRAME DURING THE YEAR.ACTIVITIES TO BE PERFORMED: THE FOLLOWING PROJECT ELEMENTS WILL BE INCORPORATED TO ACHIEVE THE OVERALL PROJECT GOALS: CONTRACT SERVICES TO CONSTRUCT A NEW BRIDGE.RESTORE A SEGMENT OF THE S.F. TIETON RIVER CHANNEL TO ITS ORIGINAL LOCATION. THESE ACTIONS WILL ENHANCE AND RESTORE SAFE PASSAGE FOR BULL TROUT, SEVERAL NATIVE RESIDENT FISH SPECIES AND FUTURE REINTRODUCED SALMON AND STEELHEAD.EXPECTED DELIVERABLES OR OUTCOMES: THE COMPLETION OF THE BRIDGE AT THIS LOCATION WILL HAVE MULTIPLE BENEFITS ALLOWING A LONGER DURATION PASSAGE WINDOW TO THREATENED BULL TROUT, INCREASING OVERALL PRODUCTIVITY OF THE RESERVOIR, PREPARING THE RESERVOIR FOR ANADROMOUS FISH REINTRODUCTION, AND IMPROVING THE FLEXIBILITY OF MANAGING THE RESERVOIR LEVEL OF TIETON RESERVOIR, AND BY EXTENSION, ALL OF THE UNITED STATES BUREAU OF RECLAMATION RESERVOIRS IN THE YAKIMA RIVER BASIN.INTENDED BENEFICIARIES: THE YAKIMA BASIN INTEGRATED PLAN (YBIP) PARTNERS INCLUDING THE YAKAMA NATION, WDFW, USFWS, FOREST SERVICE, RECLAMATION, AND THE PUBLIC. PROJECTS THAT CREATE OR IMPROVE INSTREAM HABITAT FOR ENDANGERED FISH SPECIES.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): NOT AWARE OF ANY ADDITIONAL ACTIVITIES, THIS IS A SHARED PARTNERSHIP FOR THIS PROJECT. | Washington (Bureau of Reclamation federal awards) | YAKIMA COUNTY | $2.3M | — |
| AWARD PURPOSE: KITTITAS CONSERVATION TRUST WILL IMPLEMENT AN IN-STREAM RESTORATION PROJECT ON RIVER MILE 2-3 OF GOLD CREEK, IN KITTITAS COUNTY, WASHINGTON. LOCATED JUST EAST OF SNOQUALMIE PASS IN KITTITAS COUNTY, WASHINGTON, GOLD CREEK IS THE HEADWATERS OF THE UPPER YAKIMA RIVER AND FLOWS FOR APPROXIMATELY 8 MILES FROM THE ALPINE LAKES WILDERNESS INTO KEECHELUS RESERVOIR IN THE CENTRAL CASCADE MOUNTAINS.ACTIVITIES TO BE PERFORMED: ACTIVITIES PERFORMED WILL RESTORE THE GEOMORPHOLOGY AND INCREASE THE HABITAT COMPLEXITY OF GOLD CREEK RIVER IN KITTITAS COUNTY, WASHINGTON BY INSTALLING ENGINEERED LOG JAM STRUCTURES.EXPECTED DELIVERABLES OR OUTCOMES: THE INSTREAM WOOD REPLENISHMENT WILL CREATE HABITAT COMPLEXITY, INCLUDING DEEPER POOLS WITH SHADED COVER, PROVIDE RELIEF FROM HIGH VELOCITY FLOOD FLOWS, AND ENSURE OPTIMAL HABITAT FOR BOTH THE SUCCESSFUL REARING OF JUVENILE BULL TROUT AND MIGRATION OF MATURE FISH. THE PROJECT WILL ALSO PROVIDE FLOODPLAIN RECONNECTION, WHICH WILL IMPROVE GROUNDWATER RECHARGE FROM FLOOD FLOWS, AND REDUCE THE LIKELIHOOD OF FUTURE FLOOD EVENTS FURTHER HARMING THE CHANNEL MORPHOLOGY.INTENDED BENEFICIARIES: THIS PROJECT ACHIEVES THE PUBLIC PURPOSE OF THE ACT BY COMPLETING AN INFRASTRUCTURE IMPROVEMENT OR ACTIVITY THAT WILL ADVANCE ONE OR MORE COMPONENTS OF AN ESTABLISHED STRATEGY OR PLAN TO INCREASE THE RELIABILITY OF WATER SUPPLY FOR ECOLOGICAL VALUES AND WATERSHED HEALTH.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N A | Washington (Bureau of Reclamation federal awards) | KITTITAS CONSERVATION TRUST | $2.3M | — |
| THE YAKAMA NATION, IN PARTNERSHIP WITH THE BENTON COUNTY CONSERVATION DISTRICT, WILL IMPROVE CONDITIONS FOR ANADROMOUS FISH SPECIES IN THE PROSSER, SNIVELY, AND CONFLUENCE REACHES OF THE LOWER YAKIMA RIVER, IN CENTRAL WASHINGTON. THE PROJECT WILL ADDRESS TWO KEY ELEMENTS OF THE YAKIMA BASIN INTEGRATED PLAN: FISH PASSAGE AND HABITAT PROTECTION AND ENHANCEMENT. THE YAKIMA NATION WILL COMPLETE INSTREAM RESTORATION WORK TO EXPAND A COLD-WATER REFUGE WITHIN THE YAKIMA RIVER MAINSTEM AT THE CONFLUENCE OF AMON CREEK, INCLUDING CONSTRUCTION OF 1,400 LINEAR FEET OF COOL WATER CHANNEL HABITAT AND RESTORATION OF 20 ACRES OF RIPARIAN ZONE THROUGH INVASIVE VEGETATION REMOVAL AND REVEGETATION WITH NATIVE SPECIES. THE YAKIMA NATION WILL ALSO COMPLETE ELECTROFISHING AND INSTALL A FISH TRAP ON THE WANAWISH DAM TO REMOVE AND PREVENT REINTRODUCTION OF INVASIVE PREDATORY FISH SPECIES THAT IMPEDE THE MIGRATION OF ENDANGERED FISH SPECIES. THESE IMPROVEMENTS WILL BENEFIT THE FEDERALLY THREATENED MIDDLE COLUMBIA RIVER STEELHEAD SPRING AND FALL SUMMER RUN CHINOOK, COHO, AND SOCKEYE SALMON AND THE YAKIMA POPULATION OF PACIFIC LAMPREY. THE PROJECT AREA IS DOWNSTREAM OF RECLAMATIONS YAKIMA PROJECT, WHICH IMPACTS RIVER FLOWS, TEMPERATURES, AND HABITAT CONDITIONS IN THIS AREA. THIS PROJECT IS A COMPONENT OF THE YAKIMA BASIN INTEGRATED PLAN, AND HAS BROAD SUPPORT FROM FEDERAL, STATE, TRIBAL, AND LOCAL PARTNERS. | Washington (Bureau of Reclamation federal awards) | CONFEDERATED TRIBES AND BANDS OF THE YAKAMA NATION | $2.2M | — |
| THE YAKAMA NATION WILL STUDY, SELECT, AND DESIGN ALTERNATIVES TO IMPROVE FISH PASSAGE AND AVOID ENTRAINMENT AT THE PROSSER DIVERSION ON THE LOWER YAKIMA RIVER OF CENTRAL WASHINGTON STATE. THE PROSSER DIVERSION SUPPLIES IRRIGATION WATER THROUGH THE CHANDLER CANAL SERVING THE KENNEWICK DIVISION OF RECLAMATIONS YAKIMA PROJECT. THE DAM CAN DIVERT MORE THAN 50% OF YAKIMA RIVER FLOW AT TIMES, CREATING VERY DANGEROUS FISH PASSAGE CONDITIONS. A LARGE PROPORTION OF THE YAKIMA BASINS SMOLTS GET ENTRAINED IN THE CANAL AND SUFFER HIGH MORTALITY. REMOVAL OR MODIFICATION OF THE DAM AND HEADWORKS WILL CREATE SAFER PASSAGE CONDITIONS FOR ALL ANADROMOUS SPECIES. THESE IMPROVEMENTS WILL BENEFIT ALL FOUR POPULATIONS COMPRISING THE YAKIMA MAJOR POPULATION GROUP OF FEDERALLY THREATENED MIDDLE COLUMBIA RIVER (MCR) STEELHEAD JUVENILES AND ADULTS JUVENILES AND ADULTS FROM THE ENTIRE YAKIMA POPULATIONS OF SPRING AND SUMMER RUN CHINOOK, NATURALLY SPAWNING FALL CHINOOK, COHO, AND SOCKEYE SALMON AND JUVENILE AND ADULT PACIFIC LAMPREY. THE PROJECT IS PRIORITIZED IN THE YAKIMA BASIN INTEGRATED PLAN (YBIP), A COLLABORATIVE REGIONAL PLANNING DOCUMENT SUPPORTED BY A WIDE DIVERSITY OF STAKEHOLDERS, AND THE PROJECT IS SUPPORTED BY THE KENNEWICK IRRIGATION DISTRICT, WASHINGTONS DEPARTMENT OF FISH AND WILDLIFE, AND OTHER MEMBERS OF THE YAKIMA INTEGRATED PLAN | Washington (Bureau of Reclamation federal awards) | CONFEDERATED TRIBES AND BANDS OF THE YAKAMA NATION | $2.0M | — |
| AWARD PURPOSE US BUREAU OF RECLAMATION RECLAMATION AND THE WASHINGTON STATE DEPARTMENT OF ECOLOGY ECOLOGY HAVE IDENTIFIED THE NEED FOR THE PREPARATION OF A FEASIBILITY STUDY FOR THE KITTITAS RECLAMATION DISTRICT KRD UPPER YAKIMA SYSTEM MULTI BENEFIT WATER STORAGE FACILITIES ACTIVITIES TO BE PERFORMED UNDER THIS AGREEMENT, THE RECIPIENT SHALL CONDUCT A FEASIBILITY STUDY FOR THE KITTITAS RECLAMATION DISTRICT KRD UPPER YAKIMA SYSTEM MULTI BENEFIT WATER STORAGE FACILITIES GENERAL TASKS IN THIS SCOPE OF WORK INCLUDE SCOPING PHASECONCEPTUAL REVIEW OF THE SHALEPIT RESERVOIR SITE TO DETERMINE INCLUSION AS A VALID PROJECT ANALYZED ALTERNATIVE CONTINUED REVIEW OF THE SPRINGWOOD RANCH SITE, DEFINING VIABLE STORAGE ALTERNATIVES TO CARRY FORWARD CONCEPTUAL EASTON POOL GATE AND SCREEN ANALYSIS, SUFFICIENT TO INCLUDE WITHIN THE ALTERNATIVES UNDER CONSIDERATION EXPECTED DELIVERABLES OR OUTCOMES THIS FEASIBILITY STUDY WILL SUPPORT THE UPPER YAKIMA SYSTEM MULTI BENEFIT WATER STORAGE FACILITIES AND ACHIEVES THE PUBLIC PURPOSE IDENTIFIED IN THE STATUTORY AUTHORITY INTENDED BENEFICIARIES SEE EXPECTED DELIVERABLES OR OUTCOMES SUBRECIPIENT ACTIVITIES IF KNOWN OR SPECIFIED AT TIME OF AWARD ALL ACTIVITIES OUTLINED ABOVE | Washington (Bureau of Reclamation federal awards) | KITTITAS RECLAMATION DISTRICT | $1.6M | — |
| PROJECT ABSTRACT TEMPLATEAWARD PURPOSESDBOC WILL HIRE AN ENGINEERING FIRM IN 2024 TO EVALUATE THE POTENTIAL RESERVOIR SITES AND THEN COMPLETE A DESIGN TO CONSTRUCT A 500600ACREFOOT RESERVOIR ON ABOUT 6065 ACRES OF LAND AT THE SELECTED SITE. THE FUNDS AWARDED WOULD ALSO BE USED TO PURCHASE THE SELECTED PROPERTY AND THEN FUND THE PERMITTING AND PROJECT MANAGEMENT OF THE RESERVOIRACTIVITIES TO BE PERFORMEDTHE PROJECT IS TO BUILD APPROXIMATELY A 500ACRE FOOT RESERVOIR ALONG THE SUNNYSIDE CANAL EAST OF GRANDVIEW WA. THE RESERVOIR WILL BE CONSTRUCTED WITH AN EARTH EMBANKMENT PVC LINER AND A PUMP STATION. THE PUMP STATION WILL BE CAPABLE OF PUMPING A MINIMUM OF 50CFS OUT OF THE RESERVOIR AND BACK INTO THE CANAL. THE RESERVOIR WILL HAVE A GRAVITY FILL SYSTEM. ALL CONTROLS WILL BE AUTOMATED AND HAVE RADIO COMMUNICATIONS BACK TO THE OFFICE. A RAMP FLUME WILL BE BUILT IN THE CANAL NEXT TO THE RESERVOIR TO ACCURATELY MEASURE FLOWS DOWNSTREAM OF THE RESERVOIR. THIS PROJECT WILL HAVE A LARGE AMOUNT OF EARTHWORK CONCRETE STRUCTURES STEEL HDPE PIPE PVC LINING BLOCK CONTROL BUILDING AND ELECTRICAL WORK. VARIABLE FREQUENCY DRIVES VFDS WILL CONTROL PUMP SPEEDS AND MAGMETERS WILL BE INSTALLED ON ALL PUMPS TO MEASURE OUTPUT. THE VFDS MAGMETER DISPLAYS HARMONIC FILTERS AND ELECTRICAL PANELS WILL ALL BE INSTALLED INSIDE THE AIRCONDITIONED CONTROL BUILDING.EXPECTED DELIVERABLES OR OUTCOMESTHE BENEFITS FROM THE REREG #4 WILL PROVIDE ADDITIONAL EFFICIENCIES FOR THE IRRIGATION SYSTEM THAT IS CURRENTLY IN PLACE. IT HAS BEEN DETERMINED THAT THE CURRENT REREG# 3 AT THE END OF THE SYSTEM IS NO LONGER FUNCTIONAL HIGHLIGHTING THE NEED FOR THIS NEW REREG #4. THE CURRENT REREG#3 WILL INSTEAD BE USED FOR THE STORING AND RETIMING OF WATER FOR FISH FLOWS AS APPROPRIATE.INTENDED BENEFICIARIESIRRIGATION DEMANDS INSTREAM FLOW NEEDS FOR ANADROMOUS FISH AND WATER FOR FUTURE DEVELOPMENT OF YAKAMA NATION YN LANDS COMPETE FOR THE WATER SUPPLIES OF THE YAKIMA RIVER BASIN. CURRENT WATER SUPPLY NEEDS FOR IRRIGATION ARE OVER ALLOCATED AND THE NEED FOR WATER CONSERVATION IS PARAMOUNT FOR THE SUSTAINABILITY OF THE YAKIMA RIVER BASIN WILDLIFE AND AGRICULTURE.SUBRECIPIENT ACTIVITIES IF KNOWN OR SPECIFIED AT TIME OF AWARDNA | Washington (Bureau of Reclamation federal awards) | SUNNYSIDE DIVISION BOARD OF CONTROL | $1.5M | — |
| PROJECT ABSTRACT TEMPLATEAWARD PURPOSE: THE PROJECT WILL REMOVE TREES AND PREPARE THE SITE AT CLEAR LAKE DAM TO CONSTRUCT A NEW FISH PASSAGE STRUCTURE FOR BULL TROUT- AND FUTURE ANADROMOUS FISH INTO THE UPPER TIETON WATERSHED. THE REMOVED TREES WILL BE HAULED AND PLACED NEARBY AT CLEAR LAKE SOUTH CAMPGROUND TO MITIGATE AND UNSTABLE ERODING STREAM BANK AND IN CLEAR CREEK UPSTREAM OF THE RESERVOIR FOR IN-STREAM HABITAT COMPLEXITY RESTORATION.ACTIVITIES TO BE PERFORMED: UNDER THIS AGREEMENT- THE RECIPIENT SHALL:-HARVEST TREES AND CLEAR THE PROJECT SITE FOR FUTURE FISH PASSAGE RESTORATION.-TRANSPORT AND PLACE HARVESTED TREES INSTREAM TO PROVIDE FISH HABITAT.-TRANSPORT AND STORE ALL TREES NOT DESIGNATED FOR ONSITE DISBURSAL AND INSTREAM PLACEMENT TO A STORAGE LOCATION FOR OTHER ORGANIZATIONS (FOREST SERVICE- MID-COLUMBIA FISH ENHANCEMENT GROUP- ETC.) TO USE FOR FISH HABITAT OR OTHER BENEFICIAL USES.-WILL PROVIDE PROJECT OVERSITE THROUGH IMPLEMENTATION OF THIS PROJECT.-WILL PROVIDE ALL PROJECT ADMINISTRATION AND REPORTING FOR THE CONTRACT THROUGH COMPLETION.-EXPECTED DELIVERABLES OR OUTCOMES: THE CLEAR CREEK DAM FISH PASSAGE (CCDFP) TREE REMOVAL AND HABITAT PLACEMENT PROJECT THE YAKAMA NATION AND THEIR SUBCONTRACTOR WILL MANAGE TREE REMOVAL OPERATIONS AND TREE PLACEMENT INTO STREAMS AT TWO LOCATIONS TO ENHANCE INSTREAM HABITAT FOR FISH. THESE ACTIONS WILL FACILITATE THE CONSTRUCTION OF THE CCDFP PROJECT (BUILDING A FISH LADDER FOR FISH PASSAGE OVER CLEAR CREEK DAM).INTENDED BENEFICIARIES: THIS PROJECT WILL IMPROVE IN-STREAM HABITAT RESTORATION FOR BULL TROUT AND FUTURE ANADROMOUS FISH INTO THE UPPER TIETON WATERSHED.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): NA | Washington (Bureau of Reclamation federal awards) | CONFEDERATED TRIBES AND BANDS OF THE YAKAMA NATION | $97K | — |
| 2022 2026 NORTH DAM PARK OPERATIONS AND MAINTENANCE PROJECT ABSTRACTAWARD PURPOSE THE NORTH DAM PARK PARK IS LOCATED WITHIN THE TOWN LIMITS OF GRAND COULEE, WASHINGTON, AND SITS DIRECTLY BELOW THE NORTH DAM THE 7 ACRES OF LAND THE PARK RESTS UPON IS OWNED BY THE FEDERAL GOVERNMENT AND AUTHORITY RESTS WITH THE RECLAMATION THE PARK CONSISTS OF TWO BASEBALL FIELDS, A TENNIS COURT, A SKATE PARK, CHILDREN S PLAY AREA, A CONCESSION BUILDING WITH RESTROOMS, A GAZEBO WITH AMPHITHEATER SITTING, A PICNIC SHELTER, WINDMILL EXHIBIT, PATHWAYS TO EXISTING FEATURES, AND VAST GRASS AND OTHER VEGETATION IN ADDITION TO VIEWS OF BANKS LAKE AND THE NORTH DAM USE OF THIS PARK SERVES THE LOCAL COMMUNITY FOR GENERAL RECREATION ANNUALLY, AND COMMUNITY AND CORPORATE EVENTS IN DURING THE SPRING AND SUMMER MONTHS ACTIVITIES TO BE PERFORMED OPERATIONS AND MAINTENANCE ACTIVITIES INCLUDE BUT ARE NOT LIMITED TO FEE COLLECTION PUBLIC SERVICE FUNCTIONS, SUCH AS COMPLIANCE ENFORCEMENT, INTERPRETATION, SPECIAL EVENT PROGRAMS AND COMMUNITY OUTREACH TRASH COLLECTION SANITATION SERVICES ROAD, MINOR MAINTENANCE OF BUILDINGS, GROUNDS, AND EQUIPMENT, FACILITY AND TRAIL CLEANING PEST AND WEED CONTROL EXPECTED DELIVERABLES OR OUTCOMES FUNDING FOR THIS PROJECT WILL ALLOW THE RECIPIENT TO CONTINUE PROVIDING A SAFE, CLEAN, CARED FOR RECREATIONAL AREA FOR THE PUBLIC THE WORK FOR THIS PROJECT WILL OCCUR ONCE THE FUNDS ARE AUTHORIZED WITH A COMPLETION DATE OF SEPTEMBER 30, 2026 INTENDED BENEFICIARIES THE PROJECT ACTIVITIES TO MAINTAIN AND OPERATE EXISTING FACILITIES WILL ENSURE THE PROTECTION OF PARK RESOURCES FOR PUBLIC USE THE NORTH DAM PARK IS USED FOR A VARIETY OF AGES AND MULTIPLE EVENTS THROUGHOUT THE YEAR SUBRECIPIENT ACTIVITIES IF KNOWN OR SPECIFIED AT TIME OF AWARD N A | Washington (Bureau of Reclamation federal awards) | COULEE AREA PARKS AND RECREATION DISTRICT | $73K | — |
| AWARD PURPOSE: THE CONFEDERATED TRIBES AND BANDS OF THE YAKAMA NATION (YN) IS APPLYING FOR FUNDING FROM THE BUREAU OF RECLAMATION (RECLAMATION) TECHNICAL ASSISTANCE TO TRIBES (TAP) FOR FY2024 FUNDING SOURCE TO CONDUCT AN ASSESSMENT OF WATER RESOURCES ( WATER RESOURCE ASSESSMENT OR ASSESSMENT ) TO INFORM AND DEVELOP A WATER MANAGEMENT PLAN ( MANAGEMENT PLAN ) FOR THE WHITE SALMON RIVER BASIN IN KLICKITAT COUNTY IN SOUTH-CENTRAL WASHINGTON STATE. ACTIVITIES TO BE PERFORMED: THE PURPOSE OF THE ASSESSMENT IS TO EVALUATE CURRENT AND FUTURE WATER SUPPLY AND DEMAND IN THE WHITE SALMON RIVER BASIN AND ADJACENT AREAS THAT RECEIVE WATER FROM THE BASIN, AS WELL AS ANTICIPATED FUTURE DEMAND AND RANGE OF IMPACTS FROM CURRENT AND FUTURE CLIMATE SCENARIOS. IN ADDITION, THE ASSESSMENT AIMS TO CHARACTERIZE THE CONNECTIVITY OF GROUNDWATER AND SURFACE WATERS, THE EFFECT OF INSTREAM FLOWS ON HABITAT SUITABILITY FOR AQUATIC LIFE, AND TO IDENTIFY INFORMATION GAPS AND VULNERABILITIES THAT CAN LEAD TO BETTER PLANNING AND BUILDING RESILIENCY INTO THE SYSTEM TO ADDRESS ANY CURRENT OR PROJECTED IMBALANCES. FINANCIAL ASSISTANCE TO CONDUCT THIS ASSESSMENT AND MANAGEMENT PLAN WILL PROVIDE NECESSARY ANALYSIS AND IDENTIFY A PATH FORWARD FOR THE YN TO BETTER DEVELOP, MANAGE AND PROTECT THE TRIBES VITAL TREATY-RESERVED AQUATIC RESOURCES IN THE WHITE SALMON RIVER BASIN, WHICH INCLUDE ENDANGERED SPECIES ACT- (ESA) LISTED FISH. THE ASSESSMENT AND DEVELOPMENT OF THE MANAGEMENT PLAN WILL BE CONDUCTED OVER THE COURSE OF TWO YEARS, WITH AN ESTIMATED COMPLETION DATE OF JULY 2027.EXPECTED DELIVERABLES OR OUTCOMES: THE GOAL OF THE PROPOSED PARTNERSHIP BETWEEN RECLAMATION AND THEYAKAMA NATION IS TO ASSESS CURRENT AND FUTURE WATER SUPPLY AND DEMAND IN THE WHITE SALMON RIVER BASIN AND TO DEVELOP A MANAGEMENT PLAN TO MANAGE THOSE RESOURCES INTO THE FUTURE. THE WHITE SALMON RIVER WATERSHED WATER RESOURCE ASSESSMENT WILL CONSIST OF FIVE ELEMENTS: 1. DEFINE CURRENT AND FUTURE BASIN WATER SUPPLY AND DEMANDS WITHIN THE CONTEXT OF POTENTIAL CLIMATE CHANGE SCENARIOS. 2. IDENTIFY AND QUANTIFY OPPORTUNITIES FOR WATER CONSERVATION (SYSTEM REDUNDANCY, RELIABILITY AND RESILIENCY) MEASURES. 3. CHARACTERIZE GROUND AND SURFACE WATER INTERACTIONS AND IDENTIFY CRITICAL AQUIFER RECHARGE AREAS. 4. DEVELOP STREAMFLOW AQUATIC HABITAT RELATIONSHIPS FOR SELECT ANADROMOUS FISH-BEARING TRIBUTARIES. 5. SYNTHESIZE WATER RESOURCE ASSESSMENT COMPONENTS AND IDENTIFY DATA GAPS AND ADDITIONAL ASSESSMENT NEEDS.INTENDED BENEFICIARIES: THE WHITE SALMON RIVER BASIN IS AT WHAT COULD BE CONSIDERED A TIPPING POINT: IT WAS THE SITE OF THE LARGEST DAM REMOVAL EVER ATTEMPTED (AT THE TIME) JUST OVER A DECADE AGO, PRIMARILY TO BENEFIT STRUGGLING THREATENED SALMON AND STEELHEAD POPULATIONS, WHILE AT THE SAME TIME IS EXPERIENCING INCREASING RESIDENTIAL POPULATION GROWTH, RECREATIONAL PRESSURE AND THE STRESSORS OF CLIMATE CHANGE-- A GLIMPSE OF WHICH THE BASIN SAW MOST RECENTLY DURING THE DROUGHT OF 2015, GIVING A HINT OF WHAT MIGHT BE EXPECTED IN THE FUTURE. NONETHELESS, THERE IS CURRENTLY LITTLE TO NO PROTECTION FOR VITAL WATER RESOURCES, AND NO CONCEPT OF HOW FUTURE NEEDS MAY CHANGE OR BE MET (OR NOT MET). WITHOUT A WATERSHED COUNCIL, A COMPLETED WATER RESOURCE ASSESSMENT FOR THE BASIN AND NO IMPLEMENTATION PLAN, THE WATER RESOURCES RELIED UPON BY SO MANY CURRENT AND FUTURE USERS AND SPECIES ARE IN PERIL.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): | Washington (Bureau of Reclamation federal awards) | CONFEDERATED TRIBES AND BANDS OF THE YAKAMA NATION | $300K | — |