Utah irrigation hydro contracts
25 contracts tracked across 1 municipality.
Contracts
25
municipalities
1
Distinct vendors
19
municipalities with the most irrigation hydro contracts
Top vendors in Utah irrigation hydro
| Vendor | Contracts | Volume |
|---|---|---|
| DRAPER IRRIGATION COMPANY | 4 | $5.3M |
| GLOBAL ENGINEERING SERVICES INC | 2 | $210K |
| DAVIS & WEBER COUNTIES CANAL CO | 2 | $1.4M |
| WASHINGTON COUNTY WATER CONSERVANCY DISTRICT | 2 | $1.1M |
| DRAPER IRRIGATION CO | 1 | $990K |
| UTAH STATE UNIVERSITY | 1 | $237K |
Recent irrigation hydro contracts in Utah
| Title | municipality | Vendor | Value | Solicitation |
|---|---|---|---|---|
| PRD HYDRO MULCH AND GREEN WASTE | Utah (Bureau of Reclamation federal awards) | GLOBAL ENGINEERING SERVICES INC | $124K | — |
| SECONDARY WATER METERING AND SMALL HYDRO PROJECT | Utah (Bureau of Reclamation federal awards) | DAVIS & WEBER COUNTIES CANAL CO | $299K | — |
| PROVO DELTA HYDRO MULCHING SUPPLY AND APPLICATION FALL 23 | Utah (Bureau of Reclamation federal awards) | GLOBAL ENGINEERING SERVICES INC | $85K | — |
| PRESSURE IRRIGATION METERING PROJECT | Utah (Bureau of Reclamation federal awards) | DRAPER IRRIGATION CO | $990K | — |
| UTAH HISTORIC IRRIGATION PROJECT | Utah (Bureau of Reclamation federal awards) | UTAH STATE UNIVERSITY | $237K | — |
| IRRIGATION WATER METERING & REMOTE TELEMETRY PROJECT | Utah (Bureau of Reclamation federal awards) | PEOA SOUTH BENCH CANAL AND IRRIGATION CO | $75K | — |
| MUDDY CREEK IRRIGATION CO PHASE III | Utah (Bureau of Reclamation federal awards) | MUDDY CREEK IRRIGATION COMPANY | $4.0M | — |
| CONVERT 1,685 FEET OF EXISTING CONCRETE LINER AND 1,875 FEET OF EXISTING STEEL PIPE WITH 2,060 FEET OF AN 8-FOOT BY 6-FOOT PRECAST CONCRETE BOX CULVERT AND 1,500 FEET OF 66-INCH REINFORCED CONCRETE PIPE. ALSO INCLUDES INSTALLATION OF A 2-KW VERTICAL AXIS HYDROPOWER TURBINE, A METERING STATION, AND REPLACEMENT OF AN EXISTING METER AT ANOTHER TURNOUT. | Utah (Bureau of Reclamation federal awards) | DAVIS & WEBER COUNTIES CANAL CO | $1.1M | — |
| METER UPGRADE AND SMART IRRIGATION CONTROLLERS PROJECT | Utah (Bureau of Reclamation federal awards) | CITY OF SPANISH FORK | $272K | — |
| THROUGH THE SMALL-SCALE WATER EFFICIENCY PROJECTS, RECLAMATION PROVIDES COST SHARED FINANCIAL ASSISTANCE TO STATES, TRIBES, IRRIGATION DISTRICTS, WATER DISTRICTS, AND OTHER ENTITIES WITH WATER OR POWER DELIVERY AUTHORITY TO IMPLEMENT SMALL-SCALE WATER EFFICIENCY PROJECTS THAT HAVE BEEN PRIORITIZED THROUGH PLANNING EFFORTS LED BY THE APPLICANT. THESE PROJECTS ARE GENERALLY IN THE FINAL DESIGN STAGE ENVIRONMENTAL AND CULTURAL RESOURCES COMPLIANCE HAVE BEEN INITIATED OR ALREADY COMPLETED AND THE NON-FEDERAL FUNDING, NECESSARY PERMITS, AND OTHER REQUIRED APPROVALS HAVE BEEN SECURED.WILSON IRRIGATION COMPANY, LOCATED IN NORTHERN UTAH, WILL INSTALL ELECTRIC ACTUATORS ON THREE GATES, LEVEL MONITORING SITES, AND IMPLEMENT A SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SYSTEM FOR OPERATION. THE IMPROVEMENT OF DELIVERY TECHNOLOGY WILL HELP THE COMPANY BETTER MANAGE ITS WATER SUPPLY, CONSERVE WATER, MAKE MORE EFFICIENT USE OF LIMITED WATER SUPPLIES AND IMPROVE RELATIONS BETWEEN COMPANY OFFICERS, WATERMASTER, AND STAKEHOLDERS. THE PROJECT IS THE HIGHEST PRIORITY IN WILSON IRRIGATION COMPANYS 2020 WATER CONSERVATION AND MANAGEMENT PLAN. | Utah (Bureau of Reclamation federal awards) | WILSON IRRIGATION COMPANY | $100K | — |
| BOUNTIFUL IRRIGATION DISTRICT SECONDARY WATER SYSTEM METERING PROJECT | Utah (Bureau of Reclamation federal awards) | BOUNTIFUL IRRIGATION DISTRICT | $75K | — |
| THE WASHINGTON COUNTY WATER CONSERVANCY DISTRICT, LOCATED IN ST. GEORGE, UTAH, WILL PROVIDE IRRIGATION UPGRADE REBATES TO 300 SINGLE FAMILY HOMES TO UPGRADE OUTDOOR IRRIGATION SYSTEMS. THE PROJECT WAS IDENTIFIED AS A GOAL IN THE DISTRICT'S 2015 WATER CONSERVATION PLAN. | Utah (Bureau of Reclamation federal awards) | WASHINGTON COUNTY WATER CONSERVANCY DISTRICT | $21K | — |
| THROUGH THE TITLE XVI WATER RECLAMATION AND REUSE PROGRAM (TITLE XVI), AUTHORIZED BY PUBLIC LAW (P.L.) 102-575 IN 1992, RECLAMATION PROVIDES FINANCIAL AND TECHNICAL ASSISTANCE TO LOCAL WATER AGENCIES FOR THE PLANNING, DESIGN, AND CONSTRUCTION OF WATER RECLAMATION AND REUSE PROJECTS. WATER RECYCLING IS A TOOL IN STRETCHING THE LIMITED WATER SUPPLIES IN THE WESTERN UNITED STATES. TITLE XVI PROJECTS DEVELOP AND SUPPLEMENT URBAN AND IRRIGATION WATER SUPPLIES THROUGH WATER REUSE THEREBY IMPROVING EFFICIENCY, PROVIDING FLEXIBILITY DURING WATER SHORTAGES, AND DIVERSIFYING THE WATER SUPPLY. THESE PROJECTS PROVIDE GROWING COMMUNITIES WITH NEW SOURCES OF CLEAN WATER WHICH INCREASES WATER MANAGEMENT FLEXIBILITY AND MAKES OUR WATER SUPPLY MORE RELIABLE.THE PROJECT EMBRACES THE ENTIRE WATERSHED TO BENEFIT ALL USERS. RECYCLED WATER IS BANKED IN LOW-MOUNTAIN STORAGE (WILLARD BAY) OVER THE WINTER TO MEET IN-STREAM FLOW REQUIREMENTS IN THE SUMMER WHEN HIGH-MOUNTAIN STORAGE IS NORMALLY RELEASED | Utah (Bureau of Reclamation federal awards) | WEBER BASIN WATER CONSERVANCY | $14.3M | — |
| DRAPER IRRIGATION COMPANY (COMPANY), LOCATED IN DRAPER, UTAH, WILL CONSTRUCT A NEW PUMP STATION AND PIPELINE TO INCORPORATE TREATED EFFLUENT FROM THE JORDAN BASIN WATER RECLAMATION FACILITY (JBWRF). THE NEW PUMP STATION AND PIPELINE WILL CONNECT INTO THE JBWRF TO PUMP THE REUSE WATER FROM JBWRF INTO THE COMPANYS EXISTING PRESSURE IRRIGATION SYSTEM. THIS PROJECT ALSO INCLUDES UPGRADING THE COMPANYS EXISTING FORT STREET PUMP STATION TO HANDLE THE INCREASED CAPACITIES OF THE REUSE WATER AND OTHER WATER SUPPLIES. THE COMPANY IS A MEMBER AGENCY OF THE JORDAN WATER CONSERVANCY DISTRICT THAT COMPLETED A DROUGHT CONTINGENCY PLAN WITH ASSISTANCE FROM A WATERSMART DROUGHT CONTINGENCY PLANNING GRANT. WATER REUSE PROJECTS ARE IDENTIFIED AS A PRIORITY MITIGATION MEASURE IN THE DROUGHT CONTINGENCY PLAN, AND THIS PROJECT IS SPECIFICALLY LISTED AS AN EXAMPLE OF A WASTEWATER REUSE MITIGATION MEASURE. | Utah (Bureau of Reclamation federal awards) | DRAPER IRRIGATION COMPANY | $5.0M | — |
| THE NORTH CREEK IRRIGATION COMPANY, LOCATED IN SANPETE COUNTY, UTAH, WILL INSTALL 38,655 LINEAR FEET OF VARIOUS SIZED HIGH-DENSITY POLYETHYLENE PIPE. THE PROJECT ALSO INCLUDES INSTALLATION OF TWO HYDROELECTRIC UNITS WHICH ARE EXPECTED TO GENERATE 198,000 KILOWATT-HOURS ANNUALLY. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 1,611 ACRE-FEET CURRENTLY LOST TO SEEPAGE, WHICH WILL REMAIN IN NORTH CREEK RIVER AND SAN PITCH RIVER. THE IMPROVED WATER DELIVERY INFRASTRUCTURE FROM THIS PROJECT WILL COMPLEMENT EXISTING AND FUTURE NATURAL RESOURCES CONSERVATION SERVICE PROJECTS WITH ON FARM EFFICIENCY IMPROVEMENTS BY ELIMINATING FLOOD IRRIGATION AND IMPLEMENTING SPRINKLER OR DRIP IRRIGATION. | Utah (Bureau of Reclamation federal awards) | NORTH CREEK IRRIGATION COMPANY OF MT PLEASANT INC | $3.1M | — |
| THE DUCHESNE COUNTY WATER CONSERVANCY DISTRICT, LOCATED IN DUCHESNE COUNTY, UTAH, IN ASSOCIATION WITH THE UINTAH INDIAN IRRIGATION PROJECT, THE UINTAH IRRIGATION COMPANY, AND THE UINTAH INDEPENDENT DITCH COMPANY, WILL UNDERTAKE A PROJECT THAT INCLUDES THREE SEPARATE COMPONENTS: 1) THE EASTERN DUCHESNE PROJECTS PIPELINE METERING COMPONENT WILL INSTALL 55 MAGNETIC FLOW METERS ON THE ARCADIA FARMS PIPELINE AND 97 MAGNETIC FLOW METERS ON THE CLASS B PIPELINE 2) THE WATER EFFICIENCY AND CONTROL COMPONENT WILL CONSTRUCT A NEW REGULATION STRUCTURE AND UPGRADE AN EXISTING CONCRETE OVERFLOW STRUCTURE AT THE BEGINNING OF THE NORTH PIPELINE AND 3) THE INDEPENDENT DIVERSION AND DITCH IMPROVEMENTS COMPONENT WILL CONSTRUCT A NEW HEADING STRUCTURE AND LINE A ONE-MILE SECTION OF THE UINTAH INDEPENDENT DITCH WITH GEO-COMPOSITE AND CONCRETE. IN TOTAL, THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 2,392 ACRE-FEET THROUGH MORE EFFICIENT WATER USE AND REDUCED LEAKAGE. A SIGNIFICANT PORTION OF CONSERVED WATER WILL BENEFIT FARMERS IN THE UTE INDIAN TRIBE AND SURROUNDING COMMUNITIES BY HELPING TO AVOID REDUCTIONS IN TIMES OF SHORTAGE. | Utah (Bureau of Reclamation federal awards) | DUCHESNE COUNTY WATER CONSERVANCY DISTRICT | $1.7M | — |
| THE WASHINGTON COUNTY REGIONAL REUSE SYSTEM WILL HELP MAXIMIZE LOCAL RELIABLE WATER SUPPLIES THAT ARE UNDER INCREASING PRESSURE FROM CLIMATE CHANGE AND ECONOMIC GROWTH. A POTABLE AND SECONDARY IRRIGATION REUSE SOURCE WILL BE INTEGRATED INTO WASHINGTON COUNTY WATER CONSERVANCY DISTRICT (WCWCD) WATER SUPPLY PORTFOLIO TO HELP MEET WATER DEMANDS. THE REGIONAL REUSE SYSTEM WILL ULTIMATELY INCLUDE MULTIPLE WATER TREATMENT FACILITIES, PIPELINES, AND STORAGE RESERVOIRS TO REUSE APPROXIMATELY 47,000 ACRE-FEET OF WATER EACH YEAR BY 2050. REUSE WATER SUPPLY WILL BE DELIVERED TO RWSA MUNICIPALITIES WITHIN THE WCWCD SERVICE AREA.THE REGIONAL REUSE SYSTEM COMPRISES MULTIPLE TREATMENT, CONVEYANCE, AND STORAGE PROJECTS. THE REGIONAL REUSE SYSTEM WILL IMPLEMENT POTABLE REUSE AND SUPPLEMENT SECONDARY IRRIGATION SYSTEMS TO ALLOW SECONDARY WATER SUPPLIES TO MEET POTABLE DEMANDS.TREATMENT AND CONVEYANCE REUSE PROJECTS INCLUDE THE FOLLOWING:EXISTING ST. GEORGE REUSE FACILITY (SGRF) UPGRADE TO 14 MGDSGRF ONSITE REUSE POND FOR TREATMENT OPERATIONS (100 ACRE-FEET)ADVANCED WATER TREATMENT (AWT) FACILITY (7 MGD)PIPELINES FROM SGRF TO REUSE FOREBAYPIPELINE FROM REUSE FOREBAY TO WARNER VALLEY RESERVOIRPIPELINE FROM EXISTING CONFLUENCE PARK WATER RECLAMATION FACILITY TO TOQUERVILLE SECONDARY WATER SYSTEM (TSWS). THE FOLLOWING TASKS FOR PLANNING AND PRE-CONSTRUCTION STUDIES FOR TREATMENT AND CONVEYANCE PROJECTS SHALL BE COMPLETED. TASK 1, COMPLETE SITE-SPECIFIC GEOTECHNICAL AND SURVEY STUDIES TO GATHER DESIGN DATATASK 2, REFINE PRELIMINARY PROJECT DESIGNS AND COST ESTIMATESTASK 3, INITIATE ENVIRONMENTAL COMPLIANCE AND OTHER RELATED PERMITTING ACTIVITIESTASK 4, COMPILE AND OR COMPLETE BASELINE ENVIRONMENTAL AND CULTURAL RESOURCES STUDIES | Utah (Bureau of Reclamation federal awards) | WASHINGTON COUNTY WATER CONSERVANCY DISTRICT | $1.1M | — |
| THROUGH WATERSMART SUSTAIN AND MANAGE AMERICAS RESOURCES FOR TOMORROW RECLAMATION LEVERAGES FEDERAL AND NONFEDERAL FUNDING TO WORK COOPERATIVELY WITH STATES TRIBES AND LOCAL ENTITIES AS THEY PLAN FOR AND IMPLEMENT ACTIONS TO INCREASE WATER SUPPLY SUSTAINABILITY THROUGH INVESTMENTS AND ATTENTION TO LOCAL WATER CONFLICTS.THROUGH PLANNING AND PROJECT DESIGN GRANTS RECLAMATION PROVIDES ASSISTANCE TO STATES TRIBES IRRIGATION DISTRICTS WATER DISTRICTS OTHER ENTITIES WITH WATER OR POWER DELIVERY AUTHORITY AND NONPROFIT CONSERVATION GROUPS TO CONDUCT PLANNING ACTIVITIES TO IMPROVE WATER SUPPLIES E.G. WATER SUPPLIES TO DISADVANTAGED COMMUNITIES THAT DO NOT HAVE RELIABLE ACCESS TO WATER WATER MARKETING WATER CONSERVATION DROUGHT RESILIENCE AND ECOLOGICAL RESILIENCE OR THE FINAL DESIGN OF ON THE GROUND WATER SUPPLY CONSTRUCTION INCLUDING DOMESTIC WATER SUPPLY PROJECTS FOR TRIBES INSULAR AREAS AND DISADVANTAGED COMMUNITIES WATER MANAGEMENT CONSTRUCTION AND RESTORATION PROJECTS.PROVIDENCE CITY LOCATED IN CACHE COUNTY UTAH WILL EXPLORE AND DESIGN TWO NEW CULINARY WELLS. EACH OF THE WELLS INCLUDE A NEW WELL HOUSE INTERCONNECTED PIPING WELL EQUIPMENT SUPERVISORY CONTROL AND DATA ACQUISITION SCADA SYSTEM CHLORINATION DISINFECTION EQUIPMENT AND OTHER NECESSARY WELL EQUIPMENT. NORTHERN UTAH FREQUENTLY EXPERIENCES PERIODS OF DROUGHT THAT CAN LEAD TO REDUCED GROUNDWATER RECHARGE LOWER SPRING AND WELL YIELDS AND INCREASED COMPETITION FOR LIMITED RESOURCES. THE PROJECT WILL ADDRESS THE WATER SUPPLY DEFICIENCIES CREATED BY DROUGHT CONDITIONS AND WILL INCREASE RELIABILITY AND REDUNDANCY AS IDENTIFIED IN THE CITYS 2022 CULINARY WATER MASTER PLAN. | Utah (Bureau of Reclamation federal awards) | PROVIDENCE CITY CORP | $400K | — |
| SALEM CITY PRESSURIZED IRRIGATION METERING PROJECT | Utah (Bureau of Reclamation federal awards) | SALEM CITY | $300K | — |
| AWARD PURPOSE: THE UTAH GEOLOGICAL SURVEY, A DIVISION OF UTAH DEPARTMENT OF NATURAL RESOURCES, WILL MAKE TWO EXISTING SOIL WATER BALANCE MODELS COMPATIBLE WITH GOOGLE EARTH ENGINE (GEE) TO IMPROVE WATER BUDGET ESTIMATES IN MILFORD, CASTLE, AND SANPETE VALLEYS, AND THE GREAT SALT LAKE WATERSHED. ACTIVITIES TO BE PERFORMED: THIS INTEGRATION WILL ALLOW FOR RAPID AND UPDATABLE ESTIMATES OF GROUNDWATER INFILTRATION AND CALCULATIONS, RUNOFF QUANTITIES, EVAPOTRANSPIRATION, CONSUMPTIVE USE, IRRIGATION NEEDS AND WATER SAVINGS. THE CURRENT MODELS ARE TIME CONSUMING AND CAN TAKE YEARS TO COMPLETE A WATER BUDGET.EXPECTED DELIVERABLES OR OUTCOMES: BY INTEGRATING INTO GEE, QUICK CALCULATIONS OF WATER BUDGETS AND INFORMATION WILL BE AVAILABLE TO WATER MANAGERS AND WILL REDUCE DELAYS IN REACTING TO WATER SHORTAGES. INTENDED BENEFICIARIES: THIS PROJECT IS SUPPORTED BY THE COLORADO RIVER AUTHORITY OF UTAH, THE UTAH DIVISION OF WATER RIGHTS AND RURAL WATER USERS.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N A | Utah (Bureau of Reclamation federal awards) | UTAH GEOLOGICAL SURVEY | $137K | — |
| DRAPER IRRIGATION COMPANY (COMPANY), LOCATED SOUTH OF SALT LAKE CITY, UTAH, WILL UPGRADE 536CULINARY WATER METERS TO ULTRASONIC METERS EQUIPPED WITH CELLULAR DATA TRANSMISSIONCAPABILITIES. THESE UPGRADES WILL PROVIDE MORE ACCURATE WATER USE DATA, PROMOTING WATERCONSERVATION THROUGH IDENTIFYING AND REDUCING WATER LOSSES, AND CURBING HIGH WATERUSAGE. CONSERVATION THROUGH METER UPGRADES ALIGN WITH THE COMPANY S 2020 WATERCONSERVATION MASTER PLAN. | Utah (Bureau of Reclamation federal awards) | DRAPER IRRIGATION COMPANY | $100K | — |
| CULINARY SMART METERING IS A SMALL-SCALE ON-THE-GROUND EFFICIENCY PROJECT THAT IMPLEMENTS MUNICIPAL METERING WORKPREVIOUSLY IDENTIFIED IN DRAPER IRRIGATION COMPANY S (DIC) WATER PLANNING EFFORTS.THE PROJECT WILL USE FEDERAL AND PRIVATE FUNDS TO INSTALL NEW -INCH AND 1-INCH ULTRASONIC METERS WITH SMARTTECHNOLOGY ON EXISTING METERED CULINARY SERVICES AND WILL SPAN OVER A 12-MONTH PERIOD (APRIL 2023 TO APRIL 2024).THE PROJECT PROPOSES INSTALLING 566 ULTRASONIC SMART METERS WITH CELLULAR DATA TRANSMISSION. THE 566 EXISTINGCULINARY SERVICE LATERALS WILL BE MINIMALLY IMPACTED BY REPLACING THE EXISTING METERS WITH THE NEW METERS ANDENDPOINTS. THIS PROJECT WILL OCCUR AT 566 LOCATIONS THROUGHOUT DIC S CULINARY SYSTEM SERVICE BOUNDARIES WITHINSALT LAKE COUNTY, UTAH. MORE SPECIFICALLY THE CULINARY SYSTEM IS LOCATED WITHIN PORTIONS OF DRAPER CITY, SANDYCITY, AND BLUFFDALE CITY, UTAH.THE PROPOSED METER PROJECT WILL INCLUDE REMOVING THE EXISTING METER AND REPLACING IT WITH THE NEW METER AND ACELLULAR ENDPOINT FOR TRANSMITTING THE DATA. THE ORION CELLULAR AMI NETWORK IS CURRENTLY BEING USED FORCOLLECTING THE DATA. WITH THE SYSTEM ALREADY IN PLACE, REPLACEMENT SHOULD EASILY INTEGRATE WITH THE EXISTINGSERVICES. IT IS ANTICIPATED THAT EACH SERVICE UPGRADE WILL REQUIRE ONLY INSTALLING A NEW METER AND CELLULARENDPOINT.PROJECT BENEFITS INCLUDE: REDUCING TIME AND ENERGY FOR METER READING, REDUCING TIME TO REPAIR SYSTEM DEFICIENCIESDUE TO REDUCTION IN TIME SPENT READING METERS (THEREFORE IMPROVING SYSTEM RELIABILITY), REDUCING TIME FOR LEAKDETECTION AND THUS REDUCING WATER LOSSES, INCREASED METERING ACCURACY AND RELIABILITY DUE TO METER TECHNOLOGYADVANCEMENTS, BETTER UNDERSTANDING OF OVERALL WATER USAGE AND SUPPLY RELIABILITY THROUGHOUT THE SYSTEM, ANDINCREASED COLLABORATION, INFORMATION SHARING, AND CUSTOMER SERVICE DUE TO SOFTWARE THAT ENABLES INTERACTIVE,REAL-TIME FLOW MEASUREMENTS ACCESSIBLE BY DIC AND THE CUSTOMER.UTAH IS CURRENTLY IN ONE OF THE MOST SEVERE DROUGHTS IN RECORDED HISTORY. WITH LOW SNOWPACK, AND DIMINISHEDPRECIPITATION, CUSTOMERS ARE AT RISK OF ENCOUNTERING WATER SHORTAGES. AS DOCUMENTED IN DIC S 2018 WATER RIGHTSMASTER PLAN, THERE IS NOT ENOUGH RELIABLE WATER RIGHTS SOURCE CAPACITY TO MEET ALL DEMANDS DURING DROUGHTCONDITIONS. BY COMPLETING THIS PROJECT, CUSTOMERS AND DIC WILL BENEFIT BY BEING ABLE TO TRACK WATER MOREEFFICIENTLY, MAKE CONSERVATION DECISIONS WHEN IT COMES TO WATER USE, IDENTIFY LEAKS MORE QUICKLY, AND ULTIMATELYREDUCE WATER CONSUMPTION. ANY REDUCTION IN WATER USE WILL MITIGATE THE DROUGHT IMPACT AND LOWER THE POTENTIALFOR RUNNING OUT OF WATER FOR OUTDOOR LANDSCAPE IRRIGATION. | Utah (Bureau of Reclamation federal awards) | DRAPER IRRIGATION COMPANY | $100K | — |
| THE DRAPER IRRIGATION COMPANY, JUST SOUTH OF SALT LAKE CITY, UTAH, WILL UPGRADE 528 CULINARY WATER METERS TO ULTRASONIC SMART METERS WITH CELLULAR DATA TRANSMISSION TO IMPROVE RELIABILITY, ACCURACY, AND EFFICIENCY IN METERING CULINARY SERVICE LATERALS. THE INSTALLATION WILL CURB WATER LOSS BY PROVIDING MORE ACCURATE WATER DATA, WHICH WILL HELP REDUCE HIGH WATER USAGE AND PROMOTE WATER CONSERVATION. THE COMPANY'S WATER CONSERVATION MASTER PLAN, UPDATED IN 2020, SUPPORTS THE IMPLEMENTATION OF METER UPGRADE PROJECTS. | Utah (Bureau of Reclamation federal awards) | DRAPER IRRIGATION COMPANY | $75K | — |
| INSTALLATION OF FLOW METERS AND A SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SYSTEM ALONG IRRIGATION LATERALS ON THE UINTA PIPELINE. THIS PROJECT WILL PROVIDE REAL-TIME WATER USE AND SUPPLY INFORMATION TO WATER MANAGERS, ALLOWING THEM TO BETTER SERVE THEIR CUSTOMERS BY MONITORING FLOW RATES, PRESSURES, AND VOLUME OVER TIME. | Utah (Bureau of Reclamation federal awards) | UINTAH INDIAN IRRIGATION PROJECT OPERATION AND MAINTENANCE COMPANY | $75K | — |
| THE VERNON IRRIGATION COMPANY, LOCATED IN CENTRAL UTAH, WILL INSTALL 22 SECONDARY WATER METERS AT EXISTING, UNMETERED CONNECTIONS TO THE COMPANY'S PRESSURIZED IRRIGATION SYSTEM. THE INSTALLATION OF THESE METERS WILL HELP THE COMPANY AND ITS SECONDARY WATER USERS TO IMPROVE WATER CONSERVATION, INCREASE WATER RELIABILITY, PROMOTE WATER USE ACCOUNTABILITY, AND HELP THE DISTRICT MOVE TOWARDS DROUGHT RESILIENCY. THE PROJECT IS SUPPORTED BY THE COMPANY'S STRATEGIC PLANNING EFFORTS. | Utah (Bureau of Reclamation federal awards) | VERNON IRRIGATION COMPANY | $25K | — |