Utah dam reservoir contracts
34 contracts tracked across 1 municipality.
Contracts
34
municipalities
1
Distinct vendors
28
municipalities with the most dam reservoir contracts
Top vendors in Utah dam reservoir
| Vendor | Contracts | Volume |
|---|---|---|
| WHEELER MACHINERY CO | 4 | $392K |
| AMERICAN CLASSIC CONSTRUCTION INC. | 2 | $371K |
| E. M. OIL TRANSPORT, INC. | 2 | $135K |
| DAVIS & WEBER COUNTIES CANAL CO | 2 | $3.3M |
| MICHAEL BROWN | 1 | $5K |
| STATE OF UTAH NATURAL RESOURCES | 1 | $976K |
Recent dam reservoir contracts in Utah
| Title | municipality | Vendor | Value | Solicitation |
|---|---|---|---|---|
| REFUSE COLLECTION SERVICES FOR FONTENELLE DAM/CAMP | Utah (Bureau of Reclamation federal awards) | MICHAEL BROWN | $5K | — |
| PROVO DELTA SMALL DAM HER | Utah (Bureau of Reclamation federal awards) | WHEELER MACHINERY CO | $98K | — |
| HEAVY EQUIPMENT RENTAL FOR SHASTA SKID STEER TO BE UTILIZED IN CONSTRUCTION OF A DRILLING INVESTIGATION PROGRAM AT SHASTA DAM | Utah (Bureau of Reclamation federal awards) | WHEELER MACHINERY CO | $14K | — |
| THE WASATCH FRONT, A METROPOLITAN REGION IN THE NORTH-CENTRAL PART OF UTAH AND WITHIN THE GREAT SALT LAKE BASIN IS EXPERIENCING MOUNTING PRESSURE ON LIMITED WATER SOURCES, INCLUDING DECLINING LEVELS IN CRITICAL RESERVOIRS AND THE GREAT SALT LAKE. THE PROPOSED PROJECT SEEKS TO ADDRESS THESE CHALLENGES BY IMPLEMENTING AIRBORNE SNOW OBSERVATORY TECHNOLOGY IN THE WEBER RIVER WATERSHED. THE PROJECT WILL INVOLVE CONDUCTING AIRBORNE SNOW OBSERVATORY FLIGHTS TO GATHER SNOWPACK DATA VIA INTEGRATED AERIAL LIGHT DETECTION AND RANGING AND SPECTROMETER SURVEYS COMBINED WITH REAL-TIME SIMULATION AND ASSIMILATION INTO THE WEATHER RESEARCH AND FORECASTING HYDRO MODEL FOR FORECASTING. EVALUATION OF THE AIRBORNE SNOW OBSERVATORY-INFORMED FORECASTS WILL BE CONDUCTED AGAINST CONVENTIONAL METHODS (FORECASTS FROM OPERATIONAL AGENCIES) TO ASSESS IMPROVEMENTS IN WATER MANAGEMENT OUTCOMES AND ASSOCIATED COSTS. THE PROJECT AIMS TO ENHANCE THE SKILL OF SNOWPACK MEASUREMENTS AND STREAMFLOW PREDICTIONS, AND THROUGH COLLABORATION WITH KEY STAKEHOLDERS, EMPOWER WEBER RIVER WATER MANAGERS TO OPTIMIZE RESERVOIR OPERATIONS, MITIGATE DROUGHT IMPACTS, AND BETTER ALLOCATE WATER RESOURCES. THE PROJECT WILL TAKE PLACE IN THE WEBER RIVER WATERSHED IN NORTH-CENTRAL UTAH OVER A 3-YEAR PERIOD AND SHALL BE COMPLETED BY SEPTEMBER 30, 2027. ITS SUCCESS WILL BE MEASURED BY ITS IMPACT ON THE AREAS RESERVOIR MANAGEMENT AND WATER DELIVERY. | Utah (Bureau of Reclamation federal awards) | STATE OF UTAH NATURAL RESOURCES | $976K | — |
| THE WORK ASSOCIATED WITH THE HYRUM DAM SPILLWAY REPLACEMENT PROJECT WILL TAKE PLACE APPROXIMATELY 9 MILES SOUTHWEST OF LOGAN, UTAH IN CACHE COUNTY, UTAH. THE OVERALL WORK IS FOR THE CONSTRUCTION OF A NEW SPILLWAY AND THE REMOVAL OF THE EXISTING SPILL | Utah (Bureau of Reclamation federal awards) | AMES FEDERAL CONTRACTING GROUP LLC | $115.1M | — |
| ADDITIONAL MATERIALS FOR THE CONSTRUCTION OF A SMALL DAM ON THE PROVO RIVER DELTA | Utah (Bureau of Reclamation federal awards) | AMERICAN CLASSIC CONSTRUCTION INC. | $250K | — |
| NAVAJO DAM WATER TRUCK | Utah (Bureau of Reclamation federal awards) | WHEELER MACHINERY CO | $222K | — |
| DELTA SMALL DAM SHEET PILE | Utah (Bureau of Reclamation federal awards) | AMERICAN CLASSIC CONSTRUCTION INC. | $121K | — |
| RESERVOIR BOOMS | Utah (Bureau of Reclamation federal awards) | E. M. OIL TRANSPORT, INC. | $96K | — |
| SYRACUSE CITY CORPORATION CITY , LOCATED IN SYRACUSE, UTAH, NORTH OF SALT LAKE CITY, WILL BUILD A CONCRETE LINED RESERVOIR, PUMP STATION, AND ASSOCIATED PIPELINES TO CONNECT THE RESERVOIR TO AN EXISTING CONVEYANCE SYSTEM THE PROJECT WILL ALLOW THE CITY TO STORE AN ADDITIONAL 37 ACRE FEET, INCREASING STORAGE CAPACITY BY 51 THE CITY WILL STORE WATER IN TIMES OF HIGH FLOWS TO BE USED AS ADDITIONAL SUPPLIES FOR LATER, BENEFICIAL USE LOCATED IN THE WEBER RIVER BASIN, THE CITY HAS EXPERIENCED SUBSTANTIAL IMPACT ON WATER SUPPLY RELIABILITY DUE TO EXTREME DROUGHT CONDITIONS THE INCREASED STORAGE PROVIDES A DROUGHT RESILIENT SUPPLY THIS PROJECT IS SUPPORTED AS A MITIGATION ACTION IN THE WEBER BASIN WATER CONSERVANCY DISTRICT S DROUGHT CONTINGENCY PLAN DCP THAT WAS DEVELOPED WITH ASSISTANCE FROM A WATERSMART DROUGHT CONTINGENCY PLANNING GRANT | Utah (Bureau of Reclamation federal awards) | SYRACUSE CITY | $2.0M | — |
| THE WASHINGTON COUNTY WATER CONSERVANCY DISTRICT (WCWCD) WILL CONDUCT A THOROUGH GROUNDWATER STUDY AROUND THE GUNLOCK RESERVOIR OF WASHINGTON COUNTY, UTAH TO CHARACTERIZE THE AQUIFER RECHARGE AND DETERMINE THE ACTUAL SUSTAINABLE YIELD. THE WCWCD 2022 MASTER PLAN DETERMINED THAT, AS OF 2028, THE DISTRICT WILL NOT HAVE ENOUGH WATER TO MEET THE DEMANDS OF THE AREAS GROWING POPULATION WITHOUT IMMEDIATE ACTION. THE GROUNDWATER STUDY WILL INVOLVE COMPILING AND REVIEWING AVAILABLE INFORMATION AND PREVIOUS STUDIES, CHARACTERIZING GROUNDWATER AND SURFACE WATER, IDENTIFYING TRENDS, AND CREATING A GROUNDWATER MODEL. THE PROJECT WILL BE OUTSOURCED TO AN ENGINEERING FIRM SPECIALIZING IN HYDROGEOLOGY, WHO MAY DETERMINE A NEED TO DRILL OBSERVATION WELLS. THE TOOLS AND DATA COLLECTED WILL INFORM WATER MANAGERS AND LOCAL CONSERVATION GROUPS AND SUPPORT THE WCWCDS 20-YEAR PLAN IN ADDRESSING THE PROJECTED WATER IMBALANCE DUE TO GROWTH, DROUGHTS, AND FLOODS. THE PROJECT IS SUPPORTED BY THE VIRGIN RIVER PROGRAM AND THE UNITED STATES GEOLOGICAL SURVEY. | Utah (Bureau of Reclamation federal awards) | WASHINGTON COUNTY WATER CONSERVANCY DISTRICT | $300K | — |
| THE UINTAH WATER CONSERVANCY DISTRICT WILL ALSO INSTALL ELECTRONIC FLOW METERS WITH DIGITAL DISPLAYS AT EACH OF THE 180 SHAREHOLDER TURNOUTS ON THE ASHLEY UPPER AND HIGHLINE CANALS TO ACCURATELY MONITOR, CONTROL, AND RECORD WATER DELIVERIES. IN ADDITION, THE DISTRICT WILL INSTALL AN ELECTRIC ACTUATOR AT A LARGE RADIAL GATE TO IMPROVE OPERATIONAL EFFICIENCY ON THE ASHLEY CREEK DIVERSION. THE PROJECT WILL REDUCE OPERATIONAL WATER LOSSES AND IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 936 ACRE-FEET. CONSERVED WATER WILL HELP AVOID REDUCED ALLOCATIONS IN TIMES OF SHORTAGE AND WILL OTHERWISE BE STORED IN THE STEINAKER RESERVOIR. IN ADDITION, THE PROJECT WILL REDUCE SELENIUM AND SALINITY LEVELS CARRIED DOWNSTREAM, POSITIVELY BENEFITTING THE LOCAL FISH AND WILDLIFE ENVIRONMENT. | Utah (Bureau of Reclamation federal awards) | UINTAH WATER CONSERVANCY DISTRICT | $262K | — |
| THE PURPOSE OF THIS PROJECT IS TO UPDATE THE OUTLET WORKS AT HYRUM DAM, APPROXIMATELY 10 MILES SOUTH OF LOGAN, UTAH IN CACHE COUNTY. THE PRINCIPLE COMPONENTS OF THE WORK ARE AS FOLLOWS: REMOVE THE EXISTING 24-INCH OUTLET WORKS PIPE, REMOVE THE CONCRE | Utah (Bureau of Reclamation federal awards) | IRONWOOD COMMERCIAL BUILDERS INC | $2.7M | — |
| OPERATIONAL ALTERNATIVES FOR GLEN CANYON DAM ENVIRONMENTAL ASSESSMENT | Utah (Bureau of Reclamation federal awards) | ENVIRONMENTAL MANAGEMENT & PLANNING SOLUTIONS LLC | $164K | — |
| GLEN CANYON DAM ADAPTIVE MANAGEMENT PROGRAM - NOTE TAKING SUPPORT | Utah (Bureau of Reclamation federal awards) | SEAJAY ENVIRONMENTAL LLC | $99K | — |
| THE PURPOSE OF THIS AWARD IS TO CONSTRUCT A 29-SITE CAMPGROUND NEAR THE STREAM BELOW LOST CREEK RESERVOIR WHICH WILL INCLUDE WATER POWER SERVICES, PICNIC TABLES, FIRE RING, SHELTER PAD, CRUSHER FINE WALKWAYS AT EACH SITE. 4 OF THESE SITES WILL BE ADA ACCESSIBLE. ACTIVITIES INCLUDE ALL ROADWAYS AND CAMP SITES WILL BE ASPHALT PAVED. CONSTRUCT A RESTROOM WITH 7 TOILET, SINK, SHOWER ROOMS AND ONE CAMP SERVICE LAUNDRY AND WASHROOM. INCLUDE UTILITY CHASE AND ALL AMENITIES. CONSTRUCT COMPLETE INFRASTRUCTURE INCLUDING WATER, POWER AND SEWER UTILITIES TO CAMPGROUND AND WATER PUMP TANK AREAS. CONSTRUCT A SEWER DRAIN FIELD. CONSTRUCT CULINARY WATER PUMPING FILTERING BUILDING EVAPORATION PONDS AND 140,00-GALLON CONCRETE WATER STORAGE TANK. CONSTRUCT A PARKING LOT AND ENTRY BUILDING ON ACCESS ROAD TO LOST CREEK STATE PARK. CONSTRUCT A SEWER DUMP STATION EXITING NEW CAMPGROUND AREA. THIS PROJECT WILL HAVE SIGNIFICANT RECREATIONAL BENEFIT TO THE PUBLIC. IT WILL ALLOW RECREATORS TO HAVE A GREAT EXPERIENCE WITH PAVED ROADS, NEW CAMPGROUND STALLS AND RESTROOMS, AND NICE LANDSCAPING. THE NEW RV CONNECTIONS, ACCESSIBLE CAMPGROUND STALLS, AND ROADS WILL ALSO MAKE THE CAMPGROUND MORE ACCESSIBLE BY PROVIDING THE SPACE, STABLE SURFACES, AND AMENITIES NECESSARY TO MAKE CAMPING ACCESSIBLE FOR MANY. | Utah (Bureau of Reclamation federal awards) | STATE DEPARTMENT OF NATURAL RESOURCE | $2.1M | — |
| HYRUM DAM SPILLWAY REPLACEMENT - HC PWR | Utah (Bureau of Reclamation federal awards) | CITY OF HYRUM | $80K | — |
| CURATING THE COLLECTIONS WITH THE REPOSITORY ALLOWS ACCESS TO THE COLLECTION BY BOTH PRIVATE AND PUBLIC ENTERPRISES AND THE GENERAL PUBLIC. ACCESS TO THE COLLECTION IS USED FOR EDUCATIONAL PURPOSES, INSPIRATION, CULTURAL RESOURCES, RESEARCH AND ENJOYMENT. CONTINUED CURATION OF THIS COLLECTION WILL PROVIDE IMPROVED ACCESS TO THIS RESOURCE. FURTHER, THE INFORMATION GAINED BY THE RESEARCH INTO THE COLLECTIONS WILL BE USED TO SATISFY RECLAMATIONS OBLIGATIONS UNDER NAGPRA. THE PURPOSE OF THIS GRANT IS TO PROVIDE CURATION, AND TO INSPECT, INVENTORY, MAINTAIN, AND CONSERVE THE ARCHAEOLOGICAL COLLECTION AND TO REPATRIATE THOSE ITEMS THAT FALL UNDER THE NATIVE AMERICAN GRAVE PROTECTION AND REPATRIATION ACT (NAGPRA). THE BUREAU OF RECLAMATION GENERATES COLLECTIONS OF ARCHEOLOGICAL MATERIALS AND RECORDS IN ACCORDANCE WITH MULTIPLE FEDERAL LAWS. FOLLOWING 36 CFR 79, THESE FEDERAL PROPERTIES MUST BE CURATED BY A REPOSITORY OR MUSEUM MEETING DEPARTMENT OF THE INTERIOR STANDARDS. THE RECIPIENT MEETS THESE STANDARDS, AS WELL AS THOSE OF THE AMERICAN ASSOCIATION OF MUSEUMS. THE MUSEUM HAS CURATED THE COLLECTIONS FROM GLEN CANYON DAM, BECAUSE UNDER THE TERMS OF THE ORIGINAL AGREEMENTS BETWEEN THE UNITED STATES AND THE MUSEUM, THEY WERE STIPULATED TO RETAIN THE COLLECTIONS. ACTIVITIES INCLUDE FULL CURATION, ANNUAL INVENTORY OF THE COLLECTION, ACCESSION PROCESSING, DE-ACCESSION PROCESSING, FACILITY REPORT, AND SPECIAL PROCESSING AS REQUESTED. | Utah (Bureau of Reclamation federal awards) | UNIVERSITY OF UTAH | $96K | — |
| CONSTRUCT FISH BARRIER IN CHANNEL BELOW THE SPILLWAY OF STARVATION DAM. | Utah (Bureau of Reclamation federal awards) | WHEELER MACHINERY CO | $58K | — |
| SUPPLY WASHED CONCRETE SAND AND CRUSHED ANGULAR GRAVEL TO BE INSTALLED AS A FILTER AND DRAINAGE BLANKET ON THE SMALL DAM BEING CONSTRUCTED AT THE END OF THE HISTORIC PROVO RIVER CHANNEL | Utah (Bureau of Reclamation federal awards) | SPECIALIZED GOVERNMENT SOURCING, INC. | $43K | — |
| PRD SMALL DAM FILL | Utah (Bureau of Reclamation federal awards) | E. M. OIL TRANSPORT, INC. | $39K | — |
| PRD SMALL DAM CRANE | Utah (Bureau of Reclamation federal awards) | ACIERTO LLC | $27K | — |
| 2025 STEWART LAKE WATER DELIVERY - THIS AWARD IS FOR DELIVERY OF 1,000-ACRE FEET OF WATER FROM RED FLEET RESERVOIR TO STEWART LAKE, ALL WORK SHALL BE DONE IAW STATEMENT OF WORK (SOW). | Utah (Bureau of Reclamation federal awards) | BURNS BENCH IRRIGATION COMPANY | $10K | — |
| FY26 NEWTON RESERVOIR JANITORIAL SERVICES SHALL BE PERFORMED DURING THE SEASONAL WINDOW OF MAY 1 THROUGH OCTOBER 31 EACH YEAR, IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT (PWS), UNLESS OTHERWISE DIRECTED IN WRITING BY THE CONTRACTING OFFICER. | Utah (Bureau of Reclamation federal awards) | MYMAIDSPRO LLC | $7K | — |
| THE NORTHWESTERN BAND OF THE SHOSHONE NATION WILL CONDUCT STREAM CHANNEL RESTORATION ALONG BATTLE CREEK TRIBUTARY IN FRANKLIN COUNTY, IDAHO. BATTLE CREEK HAS BEEN CHANNELIZED INTO AN OPEN EARTHEN DITCH THAT CARRIES SIGNIFICANT SEDIMENT TO THE MAINSTEM OF THE BEAR RIVER. OVER THE PAST 160 YEARS, THE RIPARIAN HABITAT ALONG THE BEAR RIVER AND ITS TRIBUTARIES HAVE BEEN DEGRADED DUE TO AGRICULTURAL PRODUCTION RESULTING IN IMPACTS ON LOCAL HABITAT, WATER SUPPLY, AND WATER QUALITY. THIS PROJECT WILL REPLACE CHANNELIZED SECTIONS OF THE CREEK WITH NATURAL STREAM MEANDERS, CONSTRUCT A CONCRETE DIVERSION STRUCTURE WITH FISH PASSAGE, INSTALL BEAVER DAM ANALOGS, AND REMOVE INVASIVE SPECIES AND REVEGETATE WITH NATIVE SPECIES. THE PROJECT WILL RESTORE FLUVIAL AND BIOLOGICAL PROCESSES OF THE RIVERINE ECOSYSTEM IN LOWER BATTLE CREEK, IMPROVING WATER QUALITY AND FLOOD MITIGATION, AND PRESERVE CULTURALLY IMPORTANT HABITATS AND SPECIES. RESTORATION WILL ALSO ENABLE THE SITE TO ABSORB MORE ANNUAL PRECIPITATION, INCREASING GROUNDWATER RECHARGE AND PIPING POORLY MAINTAINED DITCHES WILL REDUCE WATER LOSS BY AN ESTIMATED 120 ACRE-FEET PER YEAR. THE PROJECT HAS BEEN DEVELOPED COLLABORATIVELY WITH TROUT UNLIMITED, UTAH STATE UNIVERSITY, SAGELAND COLLABORATIVE, UTAH NATURE CONSERVANCY, BONNEVILLE ENVIRONMENTAL FOUNDATION, PACIFICORP S BEAR RIVER ENVIRONMENTAL COORDINATION COMMITTEE, THE U.S. FISH AND WILDLIFE SERVICE, AND SAGEBRUSH STEPPE LAND TRUST. | Utah (Bureau of Reclamation federal awards) | NORTHWESTERN BAND OF SHOSHONE NATION | $2.0M | — |
| THE DAVIS WEBER COUNTIES CANAL COMPANY, LOCATED NEAR SALT LAKE CITY, WILL ENCLOSE 1,995 FEET OF OPEN LINED CANAL WITHIN THE MAIN DELIVERY CANAL WITH AN 8-FOOT BY 7-FOOT AND 8-FOOT BY 6-FOOT GASKETED PRECAST CONCRETE BOX CULVERT. THE PROJECT ALSO INCLUDES INSTALLATION OF A 20.1-KILOWATT SOLAR ARRAY AT THE COMPANYS MAINTENANCE BUILDING AND SHOP AT SUNSET RESERVOIR FOR ON-SITE POWER. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 1,116 ACRE-FEET, WHICH IS CURRENTLY LOST TO LEAKS, SEEPAGE, ROOT UPTAKE, AND EVAPORATION. THE PROJECT WILL ALLOW FOR MORE WATER TO BE SAVED AND HELD IN THE ECHO AND EAST CANYON RESERVOIRS, THEREBY LEAVING MORE WATER IN THE WEBER RIVER SYSTEM FOR LONGER PERIODS AND PROVIDING BENEFITS TO NATIVE FISH SPECIES. THE PROJECT HAS SUPPORT FROM MULTIPLE STAKEHOLDERS WITHIN THE WEBER RIVER WATERSHED, INCLUDING TROUT UNLIMITED AND THE WEBER RIVER WATER USERS ASSOCIATION. | Utah (Bureau of Reclamation federal awards) | DAVIS & WEBER COUNTIES CANAL CO | $1.8M | — |
| FOR THIS PROJECT, THE WEST CACHE CANAL WILL BE EQUIPPED WITH TELEMETRY, CONTROL, AND MEASURING DEVICES INSTALLEDAT KEY POINTS ALONG THE LENGTH OF THE CANAL. THE PROJECT WILL REPLACE ALL EXISTING MANUAL SPILLWAY STRUCTURESWITH AUTOMATED GATES, INSTALL CAMERAS AT KEY POINTS, AND REPLACE DIRECT DRIVES WITH ENERGY EFFICIENT VFDS AT THECORNISH PUMP HOUSE. THIS WILL ENABLE CANAL MANAGERS TO CONTROL THE RATE OF WATER FLOWING EFFICIENTLY AND REMOTELYTHROUGH THE CANAL. THIS PROPOSAL INCLUDES FUNDING THE DESIGN, CONSTRUCTION, AND START-UP OF THE CONTROL DEVICESAND TELEMETRY SYSTEM.TRACKING | Utah (Bureau of Reclamation federal awards) | WEST CACHE IRRIGATION CO | $1.7M | — |
| THE WELLSVILLEMENDON CONSERVATION DISTRICT, LOCATED IN CACHE COUNTY, UTAH, WILL CONVERT 2.1 MILES OF THE UPPER CANAL FROM AN OPEN CANAL TO PIPE. THE PROJECT ALSO INCLUDES THE INSTALLATION OF 30 FLOW METERS AND A BOOSTER PUMP STATION. BY ELIMINATING WATER LOSSES FROM SEEPAGE, EVAPORATION, AND SPILLAGE, THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 915 ACREFEET. CONSERVED WATER WILL REMAIN IN THE HYRUM RESERVOIR, PROVIDING FLEXIBILITY AND RESILIENCY IN THE FACE OF DROUGHT AND CLIMATE CHANGE. | Utah (Bureau of Reclamation federal awards) | WELLSVILLE MENDON CONSERVATION DISTRICT | $1.7M | — |
| THE DAVIS AND WEBER COUNTIES CANAL COMPANY, LOCATED NEAR SALT LAKE CITY, UTAH, WILL ENCLOSE THE LOWER SECTION OF ITS MAIN CANAL BY CONVERTING 1,650 FEET OF EXISTING CONCRETE LINER TO AN 8 FOOTBY 7 FOOT PRECAST CONCRETE BOX CULVERT AND REPLACING 880 FEET OF EXISTING METAL PIPE WITH 66 INCH REINFORCED CONCRETE PIPE THE PROJECT ALSO INCLUDES INSTALLATION OF A 10 3 KILOWATT SOLAR ARRAY AT SUNSET RESERVOIR, WHICH WILL BE USED TO POWER THE DISTRICT S MAINTENANCE BUILDING AND WORKSHOP THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 838 ACRE FEET THAT IS CURRENTLY LOST TO LEAKS, SEEPAGE, ROOT UPTAKE, AND EVAPORATION THE PROJECT WILL ALLOW FOR MORE WATER TO BE SAVED AND HELD IN THE ECHO AND EAST CANYON RESERVOIRS, THEREBY LEAVING MORE WATER IN THE WEBER RIVER SYSTEM FOR LONGER PERIODS AND PROVIDING BENEFITS TO NATIVE FISH SPECIES THE PROJECT HAS SUPPORT FROM MULTIPLE STAKEHOLDERS WITHIN THE WEBER RIVER WATERSHED, INCLUDING TROUT UNLIMITED, THE UTAH DIVISION OF WILDLIFE RESOURCES, AND THE WEBER RIVER WATER USERS ASSOCIATION | Utah (Bureau of Reclamation federal awards) | DAVIS & WEBER COUNTIES CANAL CO | $1.5M | — |
| THE CO-OP FARM IRRIGATION COMPANY, LOCATED NORTH OF SALT LAKE CITY, WILL CONVERT 20,800 FEET OF EXISTING EARTHEN DITCH AND CONCRETE LINED SECTIONS OF THE CO-OP DITCH, THE SILVER SUMMIT LATERAL, AND THE SOUTH BENCH DITCH TO HIGH-DENSITY POLYETHYLENE PIPE. THE PIPED SYSTEM WILL CONNECT TO THE EXISTING RIVER DIVERSION AND WILL INCLUDE A SYSTEM METER, INDIVIDUAL METERED TURNOUTS FOR EVERY USER, AND A 15-HORSEPOWER PUMP FOR THE SILVER SUMMIT LATERAL. THE COMPANY WILL ALSO INSTALL A 11.8-KILOWATT SOLAR ARRAY TO USE WITHIN THEIR SYSTEM TO OFFSET ENERGY CONSUMPTION. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 469 ACRE-FEET, WHICH IS CURRENTLY LOST TO SEEPAGE. CONSERVED WATER WILL BE USED TO AVOID REDUCED ALLOCATIONS IN TIMES OF SHORTAGE OR OTHERWISE WILL REMAIN IN THE SOUTH FORK OF THE OGDEN RIVER AND CAUSEY RESERVOIR, BENEFITING INSTREAM FLOWS, WATER QUALITY, AND WATER TEMPERATURE. | Utah (Bureau of Reclamation federal awards) | COOP FARM IRRIGATION CO. INC. | $1.1M | — |
| THE DUCHESNE COUNTY WATER CONSERVANCY DISTRICT, LOCATED IN NORTHEAST UTAH, WILL MODIFY THE K2PIPELINE TO CONNECT WITH THE BROWNS DRAW RESERVOIR AND CREATE A CLOSED, PRESSURIZED DELIVERYSYSTEM THE PROJECT INCLUDES A SERIES OF PRESSURE REDUCING VALVES ON THE CLASS K2 PIPELINE ANDMODIFICATIONS TO THE BROWNS DRAW RESERVOIR OUTLET PIPE TO CONNECT DIRECTLY TO THE CLASS K2PIPELINE, WHICH WILL ELIMINATE TWO OPEN ENDED SPILL POINTS THE CLOSED PIPELINE SYSTEM ISEXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 944 ACRE FEET BY AVOIDING OPERATIONAL SPILLS IN ANAREA THAT EXPERIENCES REGULAR WATER SHORTAGES DUE TO DROUGHT AND POPULATION GROWTH THEPROJECT WILL IMPROVE SYSTEM EFFICIENCY AND FLEXIBILITY, HELP AVOID INTERRUPTIONS IN SERVICE, ANDRESULT IN MORE STEADY RESERVOIR LEVELS AND LESS WATER DIVERTED FROM THE UPSTREAM YELLOWSTONERIVER AS A TRIBUTARY OF THE GREEN RIVER, MORE EFFICIENT USE OF WATER DIVERTED FROM THEYELLOWSTONE RIVER VIA EXCHANGE WITH MOON LAKE AND LAKE FORK RIVER WILL BENEFIT THE AREA STHREATENED AND ENDANGERED SPECIES, AS WELL AS THE UTE TRIBE WHO USES APPROXIMATELY 75 OFTHE SYSTEM RIVER FLOWS | Utah (Bureau of Reclamation federal awards) | DUCHESNE COUNTY WATER CONSERVANCY DISTRICT | $500K | — |
| THE WATER BODIES CREATED BY RECLAMATION PROJECTS AND THE CONNECTING WATERWAYS ARE HOME TO NUMEROUS THREATENED AND ENDANGERED SPECIES OF BOTH FISH AND BIRDS. AS STATED IN THE PUBLIC LAW, FOR THE PURPOSE OF RECOGNIZING THE VITAL CONTRIBUTIONS OF OUR WILDLIFE RESOURCES TO THE NATION, THE INCREASING PUBLIC INTEREST AND SIGNIFICANCE THEREOF DUE TO EXPANSION OF OUR NATIONAL ECONOMY. IT IS IN THE PUBLICS INTEREST TO PROTECT THE HABITAT OF ENDANGERED FISH AND SPECIES, AS IT DIRECTLY BENEFITS THE PUBLICS INTEREST AND NATIONAL ECONOMY AS WELL AS PROTECTING THE PUBLIC WATER BODIES, POWER PLANTS, AND WATER USERS.RECIPIENT SHALL CONTRACT WITH A VENDOR TO CONSTRUCT, INSTALL, AND DELIVER A HOT WATER DIP TANK FOR WATERCRAFT DECONTAMINATION PURPOSES. THE DIP TANK SHALL BE A MOBILE TANK THAT COULD BE TRANSPORTED TO WHEREVER THE RECIPIENT DEEMS THE NEED IS GREATEST AND SHALL BE ABLE TO ACCOMMODATE BOATS UP TO 34 IN LENGTH. THIS DIP TANK WILL BE LOCATED AT PINEVIEW RESERVOIR. THE DIP TANK SHALL BE FILLED WITH 105F WATER AND THE WATER WOULD BE KEPT AT TEMPERATURE THROUGH A COMBINATION OF PROPANE BURNERS AND VARIOUS HEAT-RETENTION TECHNOLOGIES (HEAT RETAINING PAINT, SHADE BALLS, ETC.) BASED ON STUDIES CITED IN THE UNIFORM MINIMUM PROTOCOLS AND STANDARDS (UMPS 2021), 100 MORTALITY OF ADULT DREISSENID MUSSELS IS ACHIEVED WITH A FIVE-MINUTE EXPOSURE AT A TEMPERATURE OF 105F WATER. TRAILERED BOATS SHALL BE BACKED DOWN INTO THE DIP TANK AND THE BOAT OPERATOR SHALL ACTIVATE THE ENGINE AND ALL RAW WATER SYSTEMS ON BOARD. ALL SYSTEMS SHALL BE SIMULTANEOUSLY FILLED WITH THE HEATED WATER FOR A MINIMUM OF TWO MINUTES, ENSURING ALL ADULT AND LARVAL MUSSELS PRESENT ON IN THE BOAT SYSTEMS ARE KILLED. THE WATER SHALL BE PUMPED OUT OF THESE SYSTEMS AND THEN THE BOAT SHALL BE PULLED FROM THE WATER, COMPLETING THE DECONTAMINATION PROCESS. WATER REMAINING IN THE DIP TANK SHALL BE CONTINUOUSLY FILTERED AND RETURNED TO THE TANK, ENSURING LARVAL MUSSELS, DEBRIS, OIL, AND OTHER POTENTIAL CONTAMINANTS ARE REMOVED PRIOR TO THE ENTRANCE OF THE NEXT WATERCRAFT.A SMALL PORTION OF THE FUNDS WILL BE USED TO REPLACE OLDER MOBILE DECONTAMINATION UNITS WITH TWO, MORE EFFICIENT TANKLESS HOT WATER UNITS AT ECHO STATE PARK. | Utah (Bureau of Reclamation federal awards) | STATE OF UTAH, DIVISION OF WILDLIFE RESOURCES | $200K | — |
| THE OGDEN RIVER WATER USERS ASSOCIATION, LOCATED IN WEBER COUNTY, UTAH, WILL INSTALL REMOTE FLOW AND LEVEL MONITORING INSTRUMENTS AND TELEMETRY UNITS AT SEVERAL CRITICAL LOCATIONS ALONG THE OGDEN-BRIGHAM CANAL AND SOUTH OGDEN HIGHLINE CANAL, INCLUDING A KEY MONITORING SITE BELOW PINEVIEW DAM. CURRENTLY, OGDEN RIVER WATER USERS ASSOCIATION RELIES ON CANAL RIDERS TO MONITOR AND OPERATE HEADGATES ON OVER 35 MILES OF CANALS. DELAYED RESPONSES CAN RESULT IN BLOCKED CANALS, FLOODINGS, WATER LOSSES, AND REDUCED EFFICIENCY IN DELIVERIES. INSTALLING REMOTE MEASURING AND REAL-TIME DATA UNITS ENABLES QUICKER RESPONSES. THE PROJECT IS SUPPORTED BY THE OGDEN RIVER WATER USERS ASSOCIATION AUTOMATION MASTER PLAN DEVELOPED BY THE PINEVIEW WATER SYSTEM. | Utah (Bureau of Reclamation federal awards) | OGDEN RIVER WATER USERS ASSOCIATION | $100K | — |
| GLEN CANYON DAM ADAPTIVE MANAGEMENT PROGRAM - MEETING FACILITATION | Utah (Bureau of Reclamation federal awards) | KEARNS & WEST INC | $141K | — |