Texas canal aqueduct contracts
22 contracts tracked across 1 municipality.
Contracts
22
municipalities
1
Distinct vendors
10
municipalities with the most canal aqueduct contracts
Top vendors in Texas canal aqueduct
| Vendor | Contracts | Volume |
|---|---|---|
| EL PASO COUNTY WATER IMPROVEMENT DISTRICT NO 1 | 7 | $5.2M |
| CAMERON COUNTY IRRIGATION DISTRICT #2 | 5 | $9.9M |
| UNITED IRRIGATION DISTRICT | 2 | $3.9M |
| HARLINGEN IRRIGATION DISTRICT CAMERON CO | 2 | $598K |
| HIDALGO COUNTY IRRIGATION DISTRICT | 1 | $2.0M |
| HIDALGO IRRIGATION DISTRICT 1 | 1 | $2.5M |
Recent canal aqueduct contracts in Texas
| Title | municipality | Vendor | Value | Solicitation |
|---|---|---|---|---|
| THE HIDALGO COUNTY IRRIGATION DISTRICT NO. 2, LOCATED IN THE LOWER RIO GRANDE VALLEY, WILL CONSTRUCT INFRASTRUCTURE AND EFFICIENCY IMPROVEMENTS TO A FEEDER CANAL, DISCHARGE PIPES, AND A PUMPING PLANT. THE PROJECT INVOLVES THE CONSTRUCTION OF REINFORCED ISOLATION BAYS ON THE HEADWALL AND FEEDER CANAL, AND REPLACEMENT OF THE PUMP DISCHARGE PIPES WITH DUCTILE IRON PIPE AND RUBBER CHECK VALVES TO ELIMINATE BACKFLOW AND IMPROVE SYSTEM EFFICIENCY. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 1,233 ACRE-FEET, CURRENTLY LOST TO FEEDER CANAL BACKFLOWS THROUGH LEAKS AND HOLES IN THE DISCHARGE PIPES. CONSERVED WATER WILL REMAIN IN THE LOWER RIO GRANDE BASIN, IMPROVING ECOLOGICAL HEALTH AND ASSISTING IN INTERSTATE WATER COMPACTS BETWEEN THE UNITED STATES AND MEXICO. | Texas (Bureau of Reclamation federal awards) | HIDALGO COUNTY IRRIGATION DISTRICT | $2.0M | — |
| THE EL PASO COUNTY WATER IMPROVEMENT DISTRICT NO. 1 WILL LINE 11,000 FEET OF THE CURRENTLY EARTHEN RIVERSIDE CANAL WITH STEEL-PANEL REINFORCED CONCRETE. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 1,637 ACRE-FEET CURRENTLY LOST TO SEEPAGE, WHICH WILL ENABLE THE DISTRICT TO BETTER MANAGE ITS ALLOCATION OF RIO GRANDE PROJECT WATER. EL PASO COUNTY HAS EXPERIENCED PROLONGED AND EXTREME DROUGHT CONDITIONS, AND THE COUNTY POPULATION IS PROJECTED TO DOUBLE TO OVER 1.5 MILLION PEOPLE BY 2070. AS A RESULT OF THE PROJECT, ADDITIONAL RIO GRANDE PROJECT WATER WILL BE STORED IN ELEPHANT BUTTE AND CABALLO RESERVOIRS, WHICH WILL PROVIDE CRITICAL WATER SUPPLIES TO THE AREA DURING DROUGHT YEARS. | Texas (Bureau of Reclamation federal awards) | EL PASO COUNTY WATER IMPROVEMENT DISTRICT NO 1 | $2.0M | — |
| THE CAMERON COUNTY IRRIGATION DISTRICT C-15, LOCATED IN CAMERON COUNTY, TEXAS, WILL CONVERT 5,207 LINEAR FEET OF UNLINED OPEN CANAL IN A SEGMENT OF LATERAL 15 TO A BURIED POLYVINYL CHLORIDE PIPELINE. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 390 ACRE-FEET, CURRENTLY LOST TO EVAPORATION AND SEEPAGE. CONSERVED WATER WILL DECREASE THE AMOUNT OF WATER PUMPED FROM THE RIO GRANDE, LEAVING MORE WATER FOR HABITAT, INCLUDING A U.S. FISH AND WILDLIFE SERVICE REFUGE. | Texas (Bureau of Reclamation federal awards) | CAMERON COUNTY IRRIGATION DISTRICT #2 | $499K | — |
| THE CAMERON COUNTY IRRIGATION DISTRICT NO. 2, LOCATED IN CAMERON COUNTY, TEXAS, WILL CONVERT 4,713 LINEAR FEET OF UNLINED OPEN CANAL IN A SEGMENT OF LATERAL C-2 TO A BURIED POLYVINYL CHLORIDE PIPELINE. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 280 ACRE-FEET THAT IS CURRENTLY LOST TO EVAPORATION AND SEEPAGE. CONSERVED WATER WILL DECREASE THE AMOUNT OF WATER PUMPED FROM THE RIO GRANDE, LEAVING MORE WATER FOR HABITAT, INCLUDING A U.S. FISH AND WILDLIFE SERVICE REFUGE. | Texas (Bureau of Reclamation federal awards) | CAMERON COUNTY IRRIGATION DISTRICT #2 | $438K | — |
| THE EL PASO COUNTY WATER IMPROVEMENT DISTRICT NO. 1, LOCATED IN EL PASO COUNTY, TEXAS, WILL LINE 3,465 LINEAR FEET OF THE EARTHEN MONTOYA MAIN LATERAL USING REINFORCED SHOTCRETE. THE UPGRADE WILL REDUCE WATER LOSS IN THE CANAL DUE TO EVAPORATION AND SEEPAGE. THE LINING WILL ALSO REDUCE SEDIMENT LOADING IN THE CANAL, IMPROVING THE WATER DELIVERED TO IRRIGATION CUSTOMERS. THE PROJECT IS INCLUDED IN THE 2017 TEXAS STATE WATER PLAN AND RECEIVED SUBSTANTIAL SUPPORT FROM STAKEHOLDERS, INCLUDING THE CITY OF EL PASO AND LOCAL ORGANIZATIONS. | Texas (Bureau of Reclamation federal awards) | EL PASO COUNTY WATER IMPROVEMENT DISTRICT NO 1 | $100K | — |
| REHABILITATION OF VARIOUS CANAL FACILITIES | Texas (Bureau of Reclamation federal awards) | UNITED IRRIGATION DISTRICT | $3.4M | — |
| CANAL REHABILITATION PROJECT | Texas (Bureau of Reclamation federal awards) | CAMERON COUNTY IRRIGATION DISTRICT #2 | $3.0M | — |
| THE UNITED IRRIGATION DISTRICT, LOCATED NEAR MCALLEN, TEXAS, WILL LINE 5,900 FEET OF THE CURRENTLYCONCRETE LINED MISSION MAIN CANAL WITH A GEOSYNTHETIC COMPOSITE CANAL LINER COVERED WITHSHOTCRETE. ONCE COMPLETE, THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 660 ACREFEET,WHICH IS CURRENTLY LOST TO SEEPAGE THROUGH THE EXISTING CONCRETE LINER. THE CONSERVED WATERWILL REMAIN IN THE FALCON AND AMISTAD RESERVOIRS FOR EVENTUAL ALLOCATION TO OTHER USERS IN THE RIOGRANDE SYSTEM, INCLUDING THE LOWER RIO GRANDE VALLEY NATIONAL WILDLIFE REFUGE, ALLEVIATING PRESSURE ON THE OVER-ALLOCATED WATER RESOURCE SHARED WITH MEXICO. | Texas (Bureau of Reclamation federal awards) | UNITED IRRIGATION DISTRICT | $500K | — |
| CONVERSION OF CANAL ''F'' FROM OPEN CANAL TO A PIPELINE | Texas (Bureau of Reclamation federal awards) | CAMERON COUNTY IRRIGATION DISTRICT #2 | $298K | — |
| LA UNION CANAL CONCRETE LINING PROJECT - R20AP00046 | Texas (Bureau of Reclamation federal awards) | EL PASO COUNTY WATER IMPROVEMENT DISTRICT NO 1 | $75K | — |
| THE HIDALGO COUNTY IRRIGATION DISTRICT NO. 1, LOCATED IN SOUTHERN TEXAS, WILL LINE 3,900 FEET OF THE EARTHEN MAIN CANAL WITH A GEOSYNTHETIC COMPOSITE LINER AND 4-INCHES OF FIBER REINFORCED CONCRETE. THE PROJECT ALSO INCLUDES THE INSTALLATION OF NEW RUBICON GATES AND AN AUTOMATED SOLAR-POWERED SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 5,089 ACRE-FEET, CURRENTLY LOST TO SEEPAGE AND EVAPORATION. THE CONSERVED WATER WILL REMAIN IN THE FALCON AND AMISTAD RESERVOIRS FOR EVENTUAL ALLOCATION TO OTHER USERS IN THE RIO GRANDE SYSTEM, ALLEVIATING PRESSURE ON THE OVER-ALLOCATED WATER RESOURCE SHARED WITH MEXICO. | Texas (Bureau of Reclamation federal awards) | HIDALGO IRRIGATION DISTRICT 1 | $2.5M | — |
| LINE 6,600 FEET OF THE CURRENTLY EARTHEN RIVERSIDE CANAL WITH STEEL-PANEL REINFORCED CONCRETE. THE CANAL LINING PROJECT BEGINS AT LATITUDE 31'37'26.3 ''N AND LONGITUDE 106'18'11.9''W AND ENDS AT LATITUDE 31'36'29.3 ''N AND LONGITUDE 106'18'00.2 ''W. | Texas (Bureau of Reclamation federal awards) | EL PASO COUNTY WATER IMPROVEMENT DISTRICT NO 1 | $999K | — |
| R-6 CANAL PIPING PROJECT | Texas (Bureau of Reclamation federal awards) | SANTA CRUZ IRRIGATION DISTRICT | $250K | — |
| LA UNION EAST CANAL CONCRETE LINING PROJECT | Texas (Bureau of Reclamation federal awards) | EL PASO COUNTY WATER IMPROVEMENT DISTRICT NO 1 | — | — |
| THE LOWER RIO GRANDE VALLEY WATER RESOURCES CONSERVATION AND IMPROVEMENT ACT OF 2000 (P.L. 106-576) AND ITS SUBSEQUENT AMENDMENT, P.L. 107-351, AUTHORIZED 19 PROJECTS TO BE FUNDED THROUGH THIS PROGRAM, INCLUDING THE ONE HEREIN. THE PURPOSE OF THIS AGREEMENT IS TO ESTABLISH THE TERMS AND CONDITIONS WHEREBY RECLAMATION WILL PROVIDE COST SHARE ASSISTANCE TO THE DISTRICT ON A 50 50 BASIS FOR CANAL REHABILITATION AS IDENTIFIED IN THE LEGISLATION AS JOB NUMBER 4805540002 IN A REPORT BY TURNER COLLIE BRADEN, INC. DATED AUGUST 12, 1998 AND PROPOSED IMPROVEMENTS TO CANAL C, AS IDENTIFIED IN THE FEBRUARY 8, 2001, ENGINEERING REPORT BY MARTIN, BROWN, AND PEREZ. THE FACILITIES ARE NOT FEDERALLY-OWNED OR OPERATED AND ALL OPERATION, MAINTENANCE, REPAIR AND REHABILITATION COSTS WILL BE THE SOLE RESPONSIBILITY OF THE DISTRICT.THE RECIPIENT SHALL PROVIDE THE FOLLOWING CONSTRUCTION ACTIVITIES: CANAL B LINING CONSTRUCTION ACTIVITIES SHALL INCLUDE LINING OF APPROXIMATELY 3.68 MILES OF EARTHEN CANAL WHICH IS 27 FOOT WIDE. THIS PROJECT INCLUDES CANAL B NORTH AND CANAL B SOUTH. UPPER CANAL C LINING CONSTRUCTION ACTIVITIES SHALL INCLUDE LINING OF APPROXIMATELY 6.29 MILES OF EARTHEN CANAL WHICH IS 41 FOOT WIDE. CANAL 13A LINING CONSTRUCTION ACTIVITIES SHALL INCLUDE LINING OF APPROXIMATELY 3.84 MILES OF EARTHEN CANAL WHICH IS 12 FOOT WIDE. CANAL 13-A1 LINING CONSTRUCTION ACTIVITIES SHALL INCLUDE LINING OF APPROXIMATELY 2.02 MILES OF EARTHEN CANAL WHICH IS 22 FOOT WIDE. | Texas (Bureau of Reclamation federal awards) | CAMERON COUNTY IRRIGATION DISTRICT #2 | $5.6M | — |
| THE DONNA IRRIGATION DISTRICT, LOCATED IN SOUTHERN TEXAS, WILL LINE 12,255 FEET OF THE CURRENTLYCONCRETE LINED EAST MAIN CANAL AND 10,050 LINEAR FEET OF THE CURRENTLY CONCRETE LINED NORTHCROSSOVER MAIN CANAL WITH A GEOSYNTHETIC COMPOSITE CANAL LINER PROTECTED WITH FOUR INCHES OFSHOTCRETE THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 4,620 ACRE FEET BYREDUCING SEEPAGE LOSSES THE DISTRICT WILL ALSO INSTALL 2 SOLAR MONITORING STATIONS AT THE DISTRICT SFIRST LIFT PUMP STATION AND SECOND LIFT PUMP STATION TO PROVIDE A MORE EFFICIENT, REAL TIME,DETECTION OF PROBLEMS TO AID IN MINIMIZING LOSS OF WATER RESOURCES THE CONSERVED WATER WILLREMAIN IN THE FALCON AND AMISTAD RESERVOIRS FOR EVENTUAL ALLOCATION TO OTHER USERS IN THE RIOGRANDE SYSTEM, ALLEVIATING PRESSURE ON THE OVER ALLOCATED WATER RESOURCE SHARED WITH MEXICO | Texas (Bureau of Reclamation federal awards) | DONNA IRRIGATION DISTRICT | $2.0M | — |
| THE EL PASO COUNTY WATER IMPROVEMENT DISTRICT NO 1 WILL LINE 7,700 FEET OF THE CURRENTLY EARTHEN RIVERSIDE CANAL WITH STEEL PANEL REINFORCED CONCRETE THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 1,145 ACRE FEET CURRENTLY LOST TO SEEPAGE, WHICH WILL ENABLE THE DISTRICT TO BETTER MANAGE ITS ALLOCATION OF RIO GRANDE PROJECT WATER EL PASO COUNTY HAS EXPERIENCED PROLONGED AND EXTREME DROUGHT CONDITIONS, AND THE COUNTY POPULATION IS PROJECTED TO DOUBLE TO OVER 1 5MILLION PEOPLE BY 2070 AS A RESULT OF THE PROJECT, ADDITIONAL RIO GRANDE PROJECT WATER WILL BE STORED IN ELEPHANT BUTTE AND CABALLO RESERVOIRS, WHICH WILL PROVIDE CRITICAL WATER SUPPLIES TO THEAREA DURING DROUGHT YEARS | Texas (Bureau of Reclamation federal awards) | EL PASO COUNTY WATER IMPROVEMENT DISTRICT NO 1 | $1.0M | — |
| RIVERSIDE CANAL LINING PROJECT | Texas (Bureau of Reclamation federal awards) | EL PASO COUNTY WATER IMPROVEMENT DISTRICT NO 1 | $999K | — |
| A-20 CANAL CONSERVATION AND RELIABILITY IMPROVEMENTS | Texas (Bureau of Reclamation federal awards) | DELTA LAKE IRRIGATION DISTRICT | $998K | — |
| THE HARLINGEN IRRIGATION DISTRICT CAMERON COUNTY NO.1, LOCATED IN SOUTHERN TEXAS, WILL CONVERT3,750 FEET OF THE CONCRETE WYRICK CANAL TO 48-INCH AND 42-INCH PRESSURIZED POLYVINYL CHLORIDEPIPE. THE HARLINGEN AREA IS DEPENDENT ON SURFACE WATER FROM THE RIO GRANDE AND EXPERIENCESWATER CONFLICT AS A RESULT OF DROUGHT, OVER-APPROPRIATION OF WATER RIGHTS, AND POPULATION GROWTH.THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 68 ACRE-FEET CURRENTLY LOST TOSEEPAGE AND EVAPORATION, WHICH WILL REMAIN IN THE RIO GRANDE RIVER BASIN TO BENEFIT OTHER RIOGRANDE WATER USERS IN DOMESTIC, MUNICIPAL, INDUSTRIAL, AGRICULTURAL, ECOLOGICAL, AND RECREATIONALSECTORS. | Texas (Bureau of Reclamation federal awards) | HARLINGEN IRRIGATION DISTRICT CAMERON CO | $300K | — |
| THE PROPOSED MAIN CANAL PIPE CONVERSION PROJECT PHASE 1 WILL EFFECTIVELY MANAGE WATER SUPPLIES, PROMOTE SUSTAINABILITY AND WATER CONSERVATION, AND GIVE AGRICULTURAL PRODUCERS THE RELIABILITY AND ENHANCED FEASIBILITY THEY NEED TO DEVELOP ON-FARM IRRIGATION IMPROVEMENTS. R19AP00125 | Texas (Bureau of Reclamation federal awards) | BAYVIEW IRRIGATION DISTRICT 11 | $299K | — |
| PIPING OF WYRICK CANAL (PHASE II) | Texas (Bureau of Reclamation federal awards) | HARLINGEN IRRIGATION DISTRICT CAMERON CO | $298K | — |