South Dakota dam reservoir contracts
12 contracts tracked across 1 municipality.
Contracts
12
municipalities
1
Distinct vendors
10
municipalities with the most dam reservoir contracts
Top vendors in South Dakota dam reservoir
| Vendor | Contracts | Volume |
|---|---|---|
| STATE SOUTH DAKOTA GAME FISH & PK | 3 | $991K |
| BUTTE COUNTY | 1 | $61K |
| TALON VETERAN SERVICES INCORPORATED | 1 | $116K |
| MDU RESOURCES GROUP, INC. | 1 | $35K |
| ANDERSON EXCAVATION & SANITATION, INC. | 1 | $7K |
| G&G GARBAGE, LLC | 1 | $23K |
Recent dam reservoir contracts in South Dakota
| Title | municipality | Vendor | Value | Solicitation |
|---|---|---|---|---|
| BELLE FOURCHE RESERVOIR LAW ENFORCEMET (BUTTE COUNTY) | South Dakota (Bureau of Reclamation federal awards) | BUTTE COUNTY | $61K | — |
| REPAIR BREACH IN THE AUXILIARY SPILLWAY, JAMES DIVERSION DAM | South Dakota (Bureau of Reclamation federal awards) | TALON VETERAN SERVICES INCORPORATED | $116K | — |
| IGF::CT::IGF ELECTRIC UTILITY SERVICE - DAKOTAS AREA OFFICE, DICKINSON DAM, NORTH DAKOTA | South Dakota (Bureau of Reclamation federal awards) | MDU RESOURCES GROUP, INC. | $35K | — |
| VAULT TOILET PUMPING SERVICES FOR BELLE FOURCHE RESERVOIR | South Dakota (Bureau of Reclamation federal awards) | ANDERSON EXCAVATION & SANITATION, INC. | $7K | — |
| BELLEFOURCHE RESERVOIR VAULT TOILET PUMP | South Dakota (Bureau of Reclamation federal awards) | G&G GARBAGE, LLC | $23K | — |
| ANGOSTURA DAM SPILLWAY REPAIR | South Dakota (Bureau of Reclamation federal awards) | T1 CONSTRUCTION LLC | $13.2M | — |
| BELLE FOURCHE RESERVOIR REFUSE SERVICE-11 DUMPSTERS | South Dakota (Bureau of Reclamation federal awards) | REFUSE SOLUTIONS, INC. | $53K | — |
| TEN YEAR ELECTRIC UTILITY SERVICE FOR SHADEHILL RESERVOIR. | South Dakota (Bureau of Reclamation federal awards) | GRAND ELECTRIC COOPERATIVE INC | $9K | — |
| RECLAMATION AND RECIPIENT WILL COST SHARE FOR THE SCOPE OF WORK FOR RECREATION FACILITIES WITHIN RECLAMATION AREAS MANAGED BY RECIPIENT UNDER MANAGEMENT AGREEMENT R12MU60085, SIGNED DECEMBER 14, 2012, MANAGEMENT AGREEMENT 20-LM-60-2828, SIGNED JULY 9, 2020, AND MANAGEMENT AGREEMENT 00LM605078, SIGNED OCTOBER 3, 2000. PROPOSED ACTIVITIES SATISFY THE TERMS OF RESPECTIVE AGREEMENTS TO SHARE THE COSTS OF PLANNING, OPERATION, MAINTENANCE, AND REPLACEMENT FOR THE FOLLOWING PROJECTS: ANGOSTURA RESERVOIR, SHEPS CANYON RECREATION AREAWELL INSTALLATION, CONCRETE SHOP FLOOR AND RESTROOM INSTALLATION, CAMPING CABIN SHINGLE REPLACEMENTBELLE FOURCHE RESERVOIR, ROCKY POINT RECREATION AREACOLD STORAGE BUILDING, WATERLINE SYSTEM REPLACEMENT, PICNIC SHELTER AND CABIN SIDING REPLACEMENT, PARK INTERIOR AND ACCESS ROAD AST REPAIRSHADEHILL RESERVOIR, SHADEHILL RECREATION AREACABIN SIDING REPLACEMENT | South Dakota (Bureau of Reclamation federal awards) | STATE SOUTH DAKOTA GAME FISH & PK | $530K | — |
| UNDER TITLE XXVIII (T28) AGREEMENTS, THE COST OF PLANNING, OPERATIONS, MAINTENANCE, AND REPLACEMENT DEVELOPMENT, MODIFICATION, AND EXPANSION OF RECREATION AND FISH AND WILDLIFE FACILITIES HAS BEEN AND SHALL CONTINUE TO BE SHARED BY RECLAMATION AND SDGFP IN ACCORDANCE WITH COST-SHARING PROVISIONS OF THE FEDERAL WATER PROJECT RECREATION ACT, (PUBLIC LAW 89-72 AS AMENDED), DATED JULY 9, 1965, AND IMPLEMENTATION OF COST-SHARING AUTHORITIES FOR RECREATION AND FISH AND WILDLIFE ENHANCEMENT. RECLAMATION AND SDGFP HAVE ENTERED INTO AGREEMENTS PROVIDING FOR THE DEVELOPMENT, OPERATION, MAINTENANCE, AND REPLACEMENT OF RECREATION AND WILDLIFE FACILITIES AND ADMINISTRATION OF RECREATION AREAS AND OTHER LANDS AT RECLAMATION PROJECTS IN SOUTH DAKOTA. THEY ARE: ANGOSTURA RESERVOIR MANAGEMENT AGREEMENT NO. R12MU60085 DATED DECEMBER 14, 2012. BELLE FOURCHE RESERVOIR MANAGEMENT AGREEMENT NO. 20-LM-60-2828 DATED JULY 9, 2020. SHADEHILL RESERVOIR MANAGEMENT AGREEMENT NO. 00LM605078 DATED OCTOBER 3, 2000. SDGFP ANTICIPATES AVAILABLE FUNDS DURING THEIR FISCAL YEARS 2024-2027 (JULY 1 TO JUNE 30) TO CARRY OUT ITS PORTION OF THE PROPOSED ACTIVITIES. RECLAMATION ANTICIPATES AVAILABLE FUNDS IN FEDERAL FISCAL YEAR 2024-2027 FOR THE WORK OUTLINED. THE PROPOSED ACTIVITIES FOR THIS AGREEMENT ARE RECREATION IMPROVEMENTS AT ANGOSTURA, BELLE FOURCHE, AND SHADEHILL RESERVOIRS TO:- REPLACE DVTS WITH CONCRETE SVTS- RESTORE A DETERIORATED CABIN- REMODEL A COMFORT STATION- CONSTRUCT A PARK MAINTENANCE SHOP COMPLEX- PAVE DUMP STATION AREA | South Dakota (Bureau of Reclamation federal awards) | STATE SOUTH DAKOTA GAME FISH & PK | $421K | — |
| THE BELLE FOURCHE IRRIGATION DISTRICT, LOCATED IN NORTHWESTERN SOUTH DAKOTA, WILL CONVERT APPROXIMATELY 4,200 FEET OF OPEN EARTHEN DITCH TO POLYVINYL CHLORIDE PIPE AND INSTALL ELBOWS, AIR VENTS, AND FARMER TURNOUTS ON THE MEAD LATERAL. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 490 ACRE-FEET, WHICH IS CURRENTLY LOST TO SEEPAGE. CONSERVED WATER WILL BE STORED IN THE BELLE FOURCHE RESERVOIR AND BE MADE AVAILABLE TO MEET DEMANDS IN TIMES OF SHORTAGES. | South Dakota (Bureau of Reclamation federal awards) | BELLE FOURCHE IRRIGATION DISTRICT | $226K | — |
| SOUTH DAKOTA GAME, FISH AND PARKS (SDGFP) IS REQUESTING $41,000 FOR THE 2024 FIELD SEASON TO HELP COVER LABOR AND EQUIPMENT COSTS ASSOCIATED WITH WATERCRAFT INSPECTION STATIONS ON BOR RESERVOIRS. THE $41,000 WOULD COVER THE COST ON A WOOD FRAMED SHADE SHELTER AT BELLE FOURCHE RESERVOIR WHERE THE CURRENT INSPECTION STATION RESIDES. AN ADDITIONAL 20 PORTABLE SHADE SHELTERS ARE REQUESTED FOR THE INSPECTION STATIONS TO AID IN SUN PROTECTION AND WEATHER REFUGE FOR WATERCRAFT INSPECTORS. THE SOLAR GENERATORS WERE REQUESTED TO OFFER A POWER SOURCE TO THE INSPECTORS SO THEY CAN CHARGE THEIR TABLETS, MIFIS, PHONE, FANS, AND OTHER EQUIPMENT IF NEED BE. HAVING A POWER SOURCE ON SITE WOULD ALSO INCREASE THE SAFETY FOR THE INSPECTORS IN CASE OF AN EMERGENCY.THE STATIONARY TANKS WERE FOUND TO BE MORE COST EFFECTIVE AND TOOK UP LESS SPACE THAN THE TRAILERED TANKS ORIGINALLY REQUESTED FOR THE INSPECTION STATIONS. SOME INSPECTION STATIONS HAVE VERY LIMITED SPACE, SO WE WANTED TO BE MINDFUL OF THAT. SDGFP IS REQUESTING 3 OF THESE TANKS TO BE USED, IF NEED BE, AT 3 REMOTE STATIONS WHERE A WATER SOURCE IS NOT AVAILABLE OR CONVENIENT FOR USE. IN ORDER TO MOVE THE WATER FROM THE WATER TANK TO THE DECONTAMINATION UNITS, WE WILL NEED A WATER PUMP AND HOSE FOR THE WATER TRANSFER. THEREFORE, SDGFP IS ALSO REQUESTING 3 WATER PUMPS AND HOSES TO ACCOMPANY THE THREE WATER TANKS. | South Dakota (Bureau of Reclamation federal awards) | STATE SOUTH DAKOTA GAME FISH & PK | $41K | — |