Ohio wastewater contracts

49 contracts tracked across 1 municipality.

Contracts
49
municipalities
1
Distinct vendors
37

municipalities with the most wastewater contracts

Top vendors in Ohio wastewater

VendorContractsVolume
THE STATE OF OHIO OFFICE OF BUDGET AND MANAGEMENT7$278.4M
PEGASUS TECHNICAL SERVICES, INC5$1.9M
BIOSAFE ENGINEERING LLC2$81K
CITY OF CHILLICOTHE2$6.3M
APTIM FEDERAL SERVICES, LLC1$299K
ROSS CO COMMISSIONERS1$4.0M

Recent wastewater contracts in Ohio

TitlemunicipalityVendorValueSolicitation
TASK ORDER UNDER EXISTING IDIQ CONTRACT 68HERC20D0029 TITLED, "PER- AND POLYFLUOROALKYL SUBSTANCES (PFASS) TREATMENT USING HIGHLY INNOVATIVE TECHNOLOGIES AND NUTRIENT RECOVERY FROM WASTEWATER"Ohio (EPA federal awards)PEGASUS TECHNICAL SERVICES, INC$335K
PREVENTATIVE MAINTENANCE CONTRACT FOR THE AWBERC WR2 EFFLUENT DECONTAMINATION SYSTEM LOCATED IN CINCINNATI, OH.Ohio (EPA federal awards)BIOSAFE ENGINEERING LLC$36K
NEW TASK ORDER UNDER CONTRACT #68HERC20D0029 TITLED "PER- AND POLYFLUOROALKYL SUBSTANCES (PFASS) TREATMENT USING HIGHLY INNOVATIVE TECHNOLOGIES AND NUTRIENT RECOVERY FROM WASTEWATER"Ohio (EPA federal awards)PEGASUS TECHNICAL SERVICES, INC$747K
TASK ORDER UNDER EXISTING IDIQ CONTRACT 68HERC20D0029 TITLED "THE DEVELOPMENT OF AN INTEGRATED PERFORMANCE FRAMEWORK FOR ADDRESSING EMERGING CONTAMINANTS IN WASTEWATER TREATMENT SYSTEMS"Ohio (EPA federal awards)PEGASUS TECHNICAL SERVICES, INC$407K
PREVENTATIVE MAINTENANCE OF THE WR2 EFFLUENT DECONTAMINATION SYSTEM AT THE U.S. EPA AWBERC FACILITYOhio (EPA federal awards)BIOSAFE ENGINEERING LLC$46K
TO 68HERC23F0281: PERSISTENCE AND DECONTAMINATION OF CONTAMINANTS IN WASTEWATER SYSTEMSOhio (EPA federal awards)APTIM FEDERAL SERVICES, LLC$299K
NEW TO UNDER CONTRACT 68HERC20D0029 TITLED "WASTEWATER SURVEILLANCE OF SARS-COV-2 AND OTHER PATHOGENS TO ASSESS CORRELATION WITH COMMUNITY PREVALENCE OF INFECTION AND INFORM PUBLIC HEALTH DECISIONS, FY22"Ohio (EPA federal awards)PEGASUS TECHNICAL SERVICES, INC$226K
TASK ORDER UNDER EXISTING IDIQ CONTRACT 68HERC20D0029, TITLED RESEARCH TO ASSESS SLUDGE CO-DIGESTION AND ENERGY RECOVERY AT WASTEWATER TREATMENT FACILITIES AKA WRRFS AND ASSOCIATED LIFE CYCLE BENEFITS, IMPACTS, AND COSTSOhio (EPA federal awards)PEGASUS TECHNICAL SERVICES, INC$161K
DESCRIPTION:THE PURPOSE OF THIS AGREEMENT IS FOR A CAPITALIZATION GRANT, FUNDED BY THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58), WHICH PROVIDES FUNDS FOR THE RECIPIENT'S CLEAN WATER STATE REVOLVING FUND (CWSRF) PROGRAM. ACTIVITIES:THE ACTIVITIES ARE TO PROVIDE LOW INTEREST FINANCING TO NUMEROUS SUBRECIPIENTS FOR COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE WATER QUALITY IMPROVEMENT AND PROTECTION PROJECTS.SUBRECIPIENT:THE CLEAN WATER SRF PROGRAM IS EXEMPT FROM 2 CFR 200.332 SUBRECIPIENT MANAGEMENT REQUIREMENTS FOR SUB-AWARDS AS PROVIDED IN 2 CFR 1500.. THE PROGRAM PROVIDES ASSISTANCE IN THE FORM OF LOANS. OF THIS GRANT AMOUNT, OHIO EPA WILL FUND $117,343,000.00 IN LOANS.OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S CWSRF. THE EXPECTED OUTCOMES ARE TO ESTABLISH AND MANAGE AN EFFECTIVE COMPREHENSIVE CWSRF PROGRAM AND TO MAINTAIN A SELF-SUSTAINING REVOLVING FUND TO IMPROVE AND PROTECT WATER QUALITY AND PUBLIC HEALTH FOR CITIZENS THROUGHOUT THE STATE.Ohio (EPA federal awards)THE STATE OF OHIO OFFICE OF BUDGET AND MANAGEMENT$117.3M
DESCRIPTION:THE PURPOSE OF THIS AGREEMENT IS FOR A CAPITALIZATION GRANT, FUNDED BY THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58), WHICH PROVIDES FUNDS FOR THE RECIPIENT'S CLEAN WATER STATE REVOLVING FUND (CWSRF) PROGRAM. ACTIVITIES:THE ACTIVITIES ARE TO PROVIDE LOW INTEREST FINANCING TO NUMEROUS SUBRECIPIENTS FOR COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE WATER QUALITY IMPROVEMENT AND PROTECTION PROJECTS.SUBRECIPIENT:CLEAN WATER STATE REVOLVING FUND PROGRAM IS EXEMPT FROM 2 CFR 200.332 SUBRECIPIENT MANAGEMENT REQUIREMENTS FOR SUBAWARDS AS PROVIDED IN 2 CFR 1500. PROGRAM PROVIDES ASSISTANCE IN THE FORM OF LOANS.OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S CWSRF. THE EXPECTED OUTCOMES ARE TO ESTABLISH AND MANAGE AN EFFECTIVE COMPREHENSIVE CWSRF PROGRAM AND TO MAINTAIN A SELF-SUSTAINING REVOLVING FUND TO IMPROVE AND PROTECT WATER QUALITY AND PUBLIC HEALTH FOR CITIZENS THROUGHOUT THE STATE.Ohio (EPA federal awards)THE STATE OF OHIO OFFICE OF BUDGET AND MANAGEMENT$100.2M
DESCRIPTION:THE PURPOSE OF THIS AGREEMENT IS FOR A CAPITALIZATION GRANT WHICH PROVIDES FUNDS FOR THE RECIPIENT'S CLEAN WATER STATE REVOLVING FUND (CWSRF) PROGRAM. ACTIVITIES:THE ACTIVITIES ARE TO PROVIDE LOW INTEREST FINANCING TO NUMEROUS SUBRECIPIENTS FOR COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE WATER QUALITY IMPROVEMENT AND PROTECTION PROJECTS.SUBRECIPIENT:THE CLEAN WATER SRF PROGRAM IS EXEMPT FROM THE 2 CFR 200.332 SUBRECIPIENT MANAGEMENT REQUIREMENTS FOR SUB-AWARDS AS PROVIDED IN 2 CFR 1500. THE PROGRAM PROVIDES ASSISTANCE IN THE FORM OF LOANS. OF THIS GRANT AMOUNT, OHIO EPA WILL FUND $42,229,000 IN LOANS IN THEIR INTENDED USE PLAN.OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S CWSRF. THE EXPECTED OUTCOMES ARE TO ESTABLISH AND MANAGE AN EFFECTIVE COMPREHENSIVE CWSRF PROGRAM AND TO MAINTAIN A SELF-SUSTAINING REVOLVING FUND TO IMPROVE AND PROTECT WATER QUALITY AND PUBLIC HEALTH FOR CITIZENS THROUGHOUT THE STATE.Ohio (EPA federal awards)THE STATE OF OHIO OFFICE OF BUDGET AND MANAGEMENT$42.2M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING UNDER THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA). THE PURPOSE OF THE PROJECT IS FOR A CAPITALIZATION GRANT WHICH PROVIDES FUNDS FOR THE RECIPIENT'S CLEAN WATER STATE REVOLVING FUND (CWSRF) PROGRAM WITH A PRIMARY PURPOSE TO ADDRESS EMERGING CONTAMINANTS. EMERGING CONTAMINANTS REFER TO SUBSTANCES AND MICROORGANISMS, INCLUDING MANUFACTURED OR NATURALLY OCCURRING PHYSICAL, CHEMICAL, BIOLOGICAL, RADIOLOGICAL, OR NUCLEAR MATERIALS, WHICH ARE KNOWN OR ANTICIPATED IN THE ENVIRONMENT, THAT MAY POSE NEWLY IDENTIFIED OR RE-EMERGING RISKS TO HUMAN HEALTH, AQUATIC LIFE, OR THE ENVIRONMENT. THESE SUBSTANCES, MICROORGANISMS OR MATERIALS CAN INCLUDE MANY DIFFERENT TYPES OF NATURAL OR MANUFACTURED CHEMICALS AND SUBSTANCES - SUCH AS THOSE IN SOME COMPOUNDS OF PERSONAL CARE PRODUCTS, PHARMACEUTICALS, INDUSTRIAL CHEMICALS, PESTICIDES, AND MICROPLASTICS. ACTIVITIES:THE ACTIVITIES ARE TO PROVIDE LOW INTEREST FINANCING TO NUMEROUS SUBRECIPIENTS FOR COSTS ELIGIBLE UNDER SECTION 603(C) OF THE CLEAN WATER ACT AND THE PRIMARY PURPOSE MUST BE TO ADDRESS EMERGING CONTAMINANTS. SUBRECIPIENT:THE CLEAN WATER SRF PROGRAM IS EXEMPT FROM THE 2 CFR 200.332 SUBRECIPIENT MANAGEMENT REQUIREMENTS FOR SUB-AWARDS AS PROVIDED IN 2 CFR 1500. THE PROGRAM PROVIDES ASSISTANCE IN THE FORM OF LOANS. OF THIS GRANT AMOUNT, OHIO EPA WILL FUND $11,971,000.00 IN LOANS IN THEIR INTENDED USE PLAN.OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S CWSRF WITH A PRIMARY FOCUS ON EMERGING CONTAMINANTS. THE EXPECTED OUTCOMES ARE TO ESTABLISH AND MANAGE AN EFFECTIVE COMPREHENSIVE CWSRF PROGRAM AND TO MAINTAIN A SELF-SUSTAINING REVOLVING FUND TO IMPROVE AND PROTECT WATER QUALITY AND PUBLIC HEALTH FOR CITIZENS THROUGHOUT THE STATE.Ohio (EPA federal awards)THE STATE OF OHIO OFFICE OF BUDGET AND MANAGEMENT$12.0M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO ROSS COUNTY BOARD OF COMMISSIONERS TO IMPLEMENT ITS PROJECT TO DECOMMISSION THE EXISTING WWTP AND PROVIDE SANITARY SEWER SERVICE TO THE SURROUNDING AREA AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF WASTEWATER INFRASTRUCTURE CONSTRUCTION. WORKPLAN ACTIVITIES CONSIST OF: CONVEYANCE SYSTEM IMPROVEMENTS AND PUMP STATION UPGRADES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE DECOMMISSIONING THE EXISTING WWTP AND THE CONSTRUCTION OF PUMP STATIONS, GRAVITY SEWER, AND FORCE MAINS. THE EXPECTED OUTCOMES INCLUDE PROVIDING SANITARY SEWER SERVICE TO RESIDENTS WITHIN ROSS COUNTY, OH. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS WITHIN ROSS COUNTY, OH.Ohio (EPA federal awards)ROSS CO COMMISSIONERS$4.0M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF WILLOUGHBY TO IMPLEMENT ITS PROJECT FOR THE WILLOUGHBY-EASTLAKE WATER POLLUTION CONTROL CENTER LAKESHORE EAST EQUALIZATION BASIN PROJECT AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE INSTALLATION OF 1 EQUALIZATION BASIN, 1 PUMP STATION, AND IMPROVEMENTS TO THE ELECTRICAL AND PIPING SYSTEMS.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE PROVIDING 1.35 MILLION GALLONS OF RAW SEWAGE STORAGE CAPACITY EAST OF THE RIVER, WHICH ARE EXPECTED TO LEAD TO REDUCED SANITARY SEWER OVERFLOWS OF RAW SEWAGE TO THE EAST ISLAND AREA OF THE LOWER CHAGRIN RIVER FOR THE CITY OF WILLOUGHBY.Ohio (EPA federal awards)CITY OF WILLOUGHBY$3.5M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF CHILLICOTHE TO IMPLEMENT ITS PROJECT TO IMPROVE ITS WASTEWATER TREATMENT PLANT AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED UNDER THIS GRANT ARE THE PURCHASE THE FOLLOWING 14 PIECES OF EQUIPMENT NECESSARY FOR THE IMPROVEMENT OF THE CITY OF CHILLICOTHE'S WASTEWATER TREATMENT PLANT. THE FOLLOWING ITEMS WILL BE PURCHASED AS PART OF THE PROCURED CONSTRUCTION CONTRACT: CENTRIFUGAL SLUDGE PUMPS (HAYWARD GORDON) ROTARY LOBE PUMPS (BOERGER) POLMER BLENDING AND FEED (PROMINENT) MEMBRANE DIFFUSERS (EDI) PROPELLER SUBMERSIBLE PUMPS (WILO) ARCHIMEDES SCREW PUMPS (EPIC) SUBMERSIBLE PUMPS (WILO) SUBMERSIBLE MIXERS (WILO) UV DISINFECTION (TROJAN) SECONDARY CLARIFIERS (EVOQUA) TURBOCOMPRESSOR BLOWERS (SULZER) STEP SCREENS AND SCREENING PRESS (HUBER) SCREW PRESSES (SCHWING BIOSET) TRAVELING BRIDGE GRIT AND GREASE REMOVAL (KUSTERS) SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE THE SUCCESSFUL PURCHASES OF NECESSARY EQUIPMENT FOR THE IMPROVEMENT OF THE CITIES WASTEWATER TREATMENT PLANT, WHICH IS EXPECTED TO LEAD TO THE IMPROVED TREATMENT ABILITY WASTEWATER FOR RESIDENTS WITHIN THE CITY OF CHILLICOTHE.Ohio (EPA federal awards)CITY OF CHILLICOTHE$3.5M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO VILLAGE OF CHAGRIN FALLS TO IMPLEMENT ITS PROJECT TO WASTEWATER TREATMENT PLANT INFRASTRUCTURE REHABILITATION AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE PROJECT INCLUDES REPAIR AND REPLACEMENT OF AGED INFRASTRUCTURE. THE WORK INCLUDES HEADWORKS REPLACEMENT INCLUDING INFLUENT PUMPING, SCREENING AND GRIT REMOVAL. UPGRADES TO UNIT PROCESSES FOR EFFICIENCY WILL BE INCLUDED SUCH AS CHANGING THE AERATION FROM COARSE BUBBLE TO FINE BUBBLE DIFFUSERS AND BLOWER REPLACEMENT OR MODIFICATION TO INCREASE EFFICIENCY. IN ADDITION, THE DIVERSION STRUCTURE THAT DIVERTS FLOW TO THE EQ TANK WILL BE UPGRADED TO RESPOND MORE QUICKLY TO RISING FLOWS MEASURED AT THE WWTP. INFLUENT PUMPING CAPACITY WILL BE INCREASED BY REPLACEMENT OF PUMPS WITH HIGHER EFFICIENCY AND A CONTROLLER THAT OPERATES OFF A NEW INFLUENT METER TO OPTIMIZE OPERATION. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE HEADWORKS REPLACEMENT INCLUDING INFLUENT PUMPING, SCREENING AND GRIT REMOVAL, WHICH ARE EXPECTED TO LEAD TO FEWER SANITARY SEWER OVERFLOWS AND IMPROVE THE WATER QUALITY FOR VILLAGE OF CHAGRIN FALLS.Ohio (EPA federal awards)CHAGRIN FALLS VILLAGE OF$3.5M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO CITY OF PORT CLINTON TO IMPLEMENT THE WATER AND SEWER INFRASTRUCTURE IMPROVEMENTS PROJECT AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER AND STORMWATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF CONVEYANCE SYSTEM IMPROVEMENTS.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE THE INSTALLATION OF: - 8,601 LINEAR FEET OF 8' TO 18' SANITARY SEWER - 7,811 LINEAR FEET OF 12' TO 30' STORM SEWER - ASSOCIATED SERVICE LATERAL REPLACEMENTS AND RESTORATION ITEMS. THE EXPECTED OUTCOMES INCLUDE: - REDUCTION IN COMBINED SEWER OVERFLOWS (CSOS) INTO PORTAGE RIVER AND LAKE ERIE - IMPROVED WATER QUALITY AND PUBLIC HEALTH PROTECTION - INCREASED FIRE FLOW CAPACITY BY 10-50% IN TARGETED AREAS - ENHANCED RELIABILITY OF WATER DISTRIBUTION AND EMERGENCY STORAGE - LONG-TERM RESILIENCE OF WATER AND SEWER INFRASTRUCTURE THE INTENDED BENEFICIARIES INCLUDE THE RESIDENTS OF THE CITY OF PORT CLINTONOhio (EPA federal awards)PORT CLINTON, CITY OF$3.5M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF NEW FRANKLIN TO IMPLEMENT ITS PROJECT TO EXTEND AN EXISTING SEWER TRANSMISSION PIPELINE AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF WASTEWATER INFRASTRUCTURE CONSTRUCTION. WORKPLAN ACTIVITIES CONSIST OF CONVEYANCE SYSTEM IMPROVEMENTS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE COMPLETION OF THE NEW SANITARY SEWER MAIN AND SERVICE LATERALS, AND RESTORATION OF THE ROADWAY AND OTHER DISTURBED AREAS. THE EXPECTED OUTCOMES INCLUDE THE EXTENSION OF EXISTING SANITARY SEWER MAIN AND NEW SERVICE LATERALS TO PROVIDE SEWER SERVICES ALONG MANCHESTER ROAD. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS AND BUSINESSES WITHIN THE CITY OF NEW FRANKLIN.Ohio (EPA federal awards)CITY OF NEW FRANKLIN$3.0M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF CHILLICOTHE TO IMPLEMENT THE MARIETTA LIFT STATION IMPROVEMENTS PROJECT AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF THE REHABILITATION OF A SANITARY LIFT STATION INCLUDING THE REPLACEMENT OF AGING EQUIPMENT AND PROVIDING A STANDBY POWER GENERATOR FOR THE LIFT STATION. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE THE REHABILITATION OF A SANITARY LIFT STATION. THE EXPECTED OUTCOMES INCLUDE IMPROVED WASTEWATER CONVEYANCE AND TREATMENT AS WELL AS THE PREVENTION OF HARMFUL WASTEWATER ENTERING THE NATURAL ENVIRONMENT. THE INTENDED BENEFICIARIES INCLUDE CITIZENS OF THE CITY OF CHILLICOTHE.Ohio (EPA federal awards)CITY OF CHILLICOTHE$2.8M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING UNDER THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) TO THE STATE OF OHIO. THE PURPOSE OF THIS AGREEMENT IS TO SUPPORT AND ADVANCE THE GULF HYPOXIA ACTION PLAN THROUGH IMPLEMENTATION OF THE RECIPIENT'S NUTRIENT REDUCTION STRATEGY. THE FUNDING WILL BE USED FOR TWO PROJECTS: MAINTAINING STAFF CAPACITY THAT WILL PROVIDE TRAINING AND TECHNICAL ASSISTANCE FOR PLANNING AND DESIGN OF STRUCTURAL PRACTICES THAT REDUCE AGRICULTURAL NUTRIENT LOADING. AS WELL AS PROJECT THAT WILL PROVIDE AN INCREASE IN WATERSHED-BASED PLANNING TO DEVELOP IMPLEMENTATION PROJECTS. ACTIVITIES:THE ACTIVITIES ARE EXPECTED TO FACILITATE REDUCTIONS IN NUTRIENTS DELIVERED IN THE OHIO RIVER BASIN. FOR PROJECTS THAT DID NOT INCLUDE DIRECT IMPLEMENTATION OF PRACTICES WITH MEASURABLE POLLUTION LOADS, REDUCTION IS NOT GIVEN. THESE PROJECTIONS AIM TO DECREASE NUTRIENT DELIVERY THROUGH PLANNING, EDUCATION, IMPLEMENTATION PROJECTS, AND MONITORING THE EFFECTIVENESS OF BEST MANAGEMENT PRACTICES (BMOS) THROUGHOUT THE OHIO RIVER BASIN. SUBRECIPIENT:THE OHIO EPA WILL PASS THROUGH FUNDS TO THE OHIO DEPARTMENT OF AGRICULTURE TO FUND PERSONNEL EXPENSES FOR A NUTRIENT MANAGEMENT SPECIALIST AND A CONSERVATION ENGINEER. ALSO, SUBAWARDS WILL BE ALLOCATED TO SUBRECIPIENTS UPON THE COMPLETION OF A RFP PROCESSES.OUTCOMES:THE DELIVERABLES TO BE PROVIDED UNDER THIS AGREEMENT ARE EXPECTED TO DECREASE NUTRIENT DELIVERY IN THE OHIO RIVER BASIN, ALTHOUGH INDIRECTLY. THESE PROGRAMMATIC SUPPORT CHANGES ARE NOT SPECIFIC IMPLEMENTATION PRACTICES THAT HAVE MEASURABLE POLLUTION LOAD REDUCTIONS. THEREFORE, NO POLLUTION LOAD REDUCTION IS GIVEN. THESE PROPOSED ACTIVITIES AND RESULTS WILL BE DESCRIBED IN OHIO'S ANNUAL NONPOINT SOURCE PROGRAM REPORT AND MADE AVAILABLE ON OHIO EPA'S WEBSITE. LESSONS LEARNED AND PROGRESS THAT IS TRANSFERABLE WILL BE SHARED VIA THE HYPOXIA TASK FORCE COORDINATING COMMITTEE REGULAR MEETING STRUCTURE AND THE NEWSLETTER CREATED TO DESCRIBE HYPOXIA TASK FORCE OR NOTABLE STATE ACTIVITIES AND NEWS. ACCESS TO TECHNICAL ASSISTANCE AND ANY NEW HSTS OR SEPTAGE RESOURCES WILL BE SHARED THROUGH MEDIA RELEVANT TO THOSE INTERESTED PARTIES, SUCH AS LOCAL NEWS, THE OHIO FEDERATION OF SOIL AND WATER CONSERVATION DISTRICTS MEETINGS OR NEWS. OHIO UTILIZES WATER QUALITY MONITORING AT GAGE STATIONS ALONG WITH MONITORING WASTEWATER TREATMENT SYSTEMS AND ENVIRONMENTAL ASSESSMENTS ON PARTICULAR WATERSHEDS (SUPPORTING THE STATES INTEGRATED WATER QUALITY REPORT) TO QUALITATIVELY AND QUANTITATIVELY MEASURE AND TRACK ENVIRONMENTAL RESULTS. NUTRIENT LOADS ARE REPORTED IN OHIO'S MASS BALANCE REPORT. SPECIFIC PROJECTS SUCH AS THE HSTS/SEPTAGE PROJECT WILL BE EVALUATED FOR THE ABILITY TO MONITOR LOCAL REDUCTIONS, WHILE PROGRAMMATIC PROJECTS OR CHANGES WILL BE MONITORED USING THE MEASURES GIVEN ABOVE WITH EACH NUMBERED ITEM. THE INTENDED BENEFICIARIES ARE THE RESIDENTS OF THE STATE OF OHIO.Ohio (EPA federal awards)THE STATE OF OHIO OFFICE OF BUDGET AND MANAGEMENT$2.5M
DESCRIPTION:THIS AGREEMENT IS TO FUND THE STATE OF OHIO'S WATER QUALITY MANAGEMENT PLANNING PROGRAM TO IMPROVE IMPAIRED WATER AND PROTECT UNIMPAIRED WATERS ACROSS THE STATE BY CONDUCTING PLANNING THAT INFORMS AND SUPPORTS IMPLEMENTATION OF CLEAN WATER ACT PROGRAMS. IN ACCORDANCE WITH CLEAN WATER ACT SECTION 205(J)(3), UNLESS A WAIVER REQUEST IS APPROVED BY EPA, THE RECIPIENT WILL JOINTLY DEVELOP WORKPLANS WITH AND PASSTHROUGH AT LEAST 40% OF FUNDING TO REGIONAL OR INTERSTATE WATERSHED MANAGEMENT PLANNING AGENCIES. THIS AGREEMENT IS PARTIALLY SUPPORTED BY FUNDING PROVIDED UNDER THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58). EPA HAS CONDITIONALLY APPROVED THE CURRENT WORKPLAN TO ALLOW THE RECIPIENT TO PROCEED TO WORK ON APPROVED WORKPLAN COMPONENTS. THE RECIPIENT MAY INCUR COSTS ON ELIGIBLE ACTIVITIES ASSOCIATED WITH THE APPROVED WORKPLAN COMPONENTS UP TO $1,454,400.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING WATER QUALITY MANAGEMENT PLANNING ACTIVITIES: TMDL DEVELOPMENT AS WELL AS 208 PLAN ACTIVITIES, WATER QUALITY AND BIOLOGICAL MONITORING AND ASSOCIATED WORK DONE TO SUPPORT THE TMDL, NPDES, AND STANDARDS PROGRAMS, AND THE PREPARATION OF WATER QUALITY AND BIOLOGICAL ASSESSMENT REPORTS.SUBRECIPIENT:OHIO EPA WILL PASS THROUGH $969,600.00 TO THE AREAWIDE AND WATER QUALITY PLANNING AGENCIES, AS DETAILED IN THE GRANT WORKPLAN. THESE AREAWIDE AGENCIES WILL CONTINUE 208 PLAN UPDATES AND COMPLETE SUPPLEMENTAL WATER QUALITY PLANNING ACTIVITIES, SUCH AS WORK ON NINE ELEMENT PLANS. WITH THE INCREASE IN THE 604(B) ALLOTMENT, OHIO EPA WILL DIRECT THE AREAWIDE AND WATER QUALITY PLANNING AGENCIES TO DEVELOP SUB-GRANT WORK PLANS THAT INCLUDE MORE SUPPLEMENTAL WATER QUALITY PLANNING ACTIVITIES THAT ALIGN WITH THE NEEDS AND PRIORITIES OF LOCAL, REGIONAL AND STATE GOVERNMENTS.OUTCOMES: THE INFORMATION PROVIDED BY THIS WORK ALLOWS OHIO EPA TO: 1) MAINTAIN STRONG PROGRAMS IN MONITORING, ASSESSMENT AND TMDLS THAT EMPHASIZE WATERSHED PROTECTION; (2) INFORM THE STANDARDS AND NPDES PROGRAMS; (3) IDENTIFY AND RESTORE IMPAIRED WATERS ON A WATERSHED BASIS; AND (4) PROMOTE AND ASSIST IN THE PLANNING OF REGIONAL WASTEWATER INFRASTRUCTURE.Ohio (EPA federal awards)THE STATE OF OHIO OFFICE OF BUDGET AND MANAGEMENT$2.4M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO NORTHEAST OHIO REGIONAL SEWER DISTRICT TO IMPLEMENT ITS PROJECT TO SEPARATE EXISTING COMBINED SEWER OVERFLOW AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER INFRASTRUCTURE CONSTRUCTION AND STORM WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF: CONVEYANCE SYSTEM IMPROVEMENTS, AND STORMWATER MANAGEMENT/TREATMENT SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE SEWER SEPARATION WORK, SEWER REHABILITATION, AND MAKING INTERCONNECTIONS BETWEEN PIPES AS NEEDED. THE EXPECTED OUTCOMES INCLUDE REDUCING SEWER OVERFLOW AND REDUCED RISK OF BASEMENT FLOODING. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS IN THE CITY OF GARFIELD HEIGHTS.Ohio (EPA federal awards)NORTHEAST OHIO REGIONAL SEWER DISTRICT$2.0M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO CITY OF PARMA TO IMPLEMENT ITS PROJECT TO INSTALL SANITARY SEWER MAIN AND SERVICE LATERAL AT 4 SEPARATE PROJECT SITES AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE PROJECT SCOPE INCLUDES THE FOLLOWING: - INSTALLATION OF APPROXIMATELY 2,300 LINEAR FEET OF 8-INCH DIAMETER SANITARY SEWER MAIN - INSTALLATION OF APPROXIMATELY 680 LINEAR FEET OF 6-INCH DIAMETER SANITARY SERVICE LATERALS WITH TEST TEES - INSTALLATION OF SIXTEEN (16) SANITARY SEWER MANHOLES - SEWER TRENCH BACKFILLING - SURFACE RESTORATION TO INCLUDE SEEDING/MULCHING AND FULL-DEPTH ROADWAY, CURB, AND SIDEWALK REPLACEMENTS ALONG TRENCHED AREAS - ASPHALT ROADWAY MILL AND OVERLAY - EROSION AND SEDIMENT CONTROL - MAINTENANCE OF TRAFFIC.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES: THE ANTICIPATED DELIVERABLES ARE SANITARY SEWER MAIN AND SERVICE LATERAL INSTALLATION FOR 34 RESIDENTIAL PROPERTIES, WHICH IS EXPECTED TO LEAD TO A DECREASE IN THE CONTAMINATION OF SURFACE WATERS AND GROUND WATER WITH DISEASE-CAUSING PATHOGENS AND NITRATES. THIS PROJECT WILL BENEFIT THE RESIDENTS OF THE 34 PROPERTIES WHO WILL NO LONGER HAVE TO RELY ON HOUSEHOLD SEWAGE TREATMENT SYSTEMS, AS WELL PROVIDING ENVIRONMENTAL BENEFITS FOR THE CITY OF PARMA AS A WHOLE.Ohio (EPA federal awards)CITY OF PARMA$2.0M
DESCRIPTION:THIS AGREEMENT IS TO FUND THE STATE OF OHIO'S WATER QUALITY MANAGEMENT PLANNING PROGRAM TO IMPROVE IMPAIRED WATER AND PROTECT UNIMPAIRED WATERS ACROSS THE STATE BY CONDUCTING PLANNING THAT INFORMS AND SUPPORTS IMPLEMENTATION OF CLEAN WATER ACT PROGRAMS. IN ACCORDANCE WITH CLEAN WATER ACT SECTION 205(J)(3), UNLESS A WAIVER REQUEST IS APPROVED BY EPA, THE RECIPIENT WILL JOINTLY DEVELOP WORKPLANS WITH AND PROVIDE AT LEAST 40% OF THIS AWARD TO REGIONAL OR INTERSTATE WATERSHED MANAGEMENT PLANNING AGENCIES. THIS AGREEMENT IS SUPPORTED BY FUNDING PROVIDED UNDER THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58). ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE FOLLOWING WATER QUALITY MANAGEMENT PLANNING ACTIVITIES: TOTAL MAXIMUM DAILY LOAD (TMDL) DEVELOPMENT AS WELL AS 208 PLAN ACTIVITIES; WATER QUALITY AND BIOLOGICAL MONITORING AND ASSOCIATED WORK DONE TO SUPPORT THE TMDL, NPDES AND STANDARDS PROGRAMS; PREPARATION OF WATER QUALITY AND BIOLOGICAL ASSESSMENT REPORTS (TECHNICAL SUPPORT DOCUMENTS); AND EVALUATION OF OUTREACH IN DISADVANTAGED AREAS.SUBRECIPIENT:OHIO EPA WILL PASS THROUGH 693,200 TO THE AREAWIDE AND WATER QUALITY PLANNING AGENCIES, AS DETAILED IN THE GRANT WORKPLAN. OHIO EPA MAY USE THE REMAINING $43,809 BUDGETED IN OTHER IN VARIOUS MISCELLANEOUS CATEGORIES WHEN REASONABLE, ALLOCABLE, AND ALLOWABLE PER THE FEDERAL GRANT REGULATIONS. SEE GRANT BUDGET OBJECT JUSTIFICATION AND WORKPLAN IN SECTION M FOR MORE DETAIL.OUTCOMES:THE DELIVERABLES TO BE PROVIDED UNDER THIS AGREEMENT ARE: TECHNICAL SUPPORT DOCUMENTS INCLUDING USE ATTAINABILITY ANALYSES FOR WATER QUALITY STANDARD RULE CHANGES, VARIOUS TMDL REPORTS, AND WATER QUALITY PLANNING MANAGEMENT UPDATES. THE EXPECTED OUTCOMES RESULTING FROM THESE EFFORTS INCLUDE OHIO EPA'S MAINTENANCE OF STRONG PROGRAMS IN MONITORING, ASSESSMENT, AND TMDLS THAT EMPHASIZE WATERSHED PROTECTION; INFORMATION OF THE STANDARDS AND NPDES PROGRAMS; IDENTIFICATION AND RESTORATION OF IMPAIRED WATERS ON A WATERSHED BASIS; AND PROMOTION AND ASSISTANCE IN THE PLANNING OF REGIONAL WASTEWATER INFRASTRUCTURE. THE INTENDED BENEFICIARIES INCLUDE THE STATE OF OHIO'S PRIVATE CITIZENS AS WELL AS THEIR LOCAL, REGIONAL, AND STATE GOVERNMENTS. THIS SPECIFICALLY INCLUDES MORROW COUNTY AND 22 COUNTIES IN SOUTHEASTERN OHIO.Ohio (EPA federal awards)THE STATE OF OHIO OFFICE OF BUDGET AND MANAGEMENT$1.7M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO MID-OHIO WATER AND SEWER DISTRICT TO IMPLEMENT ITS PROJECT TO PURCHASE EQUIPMENT FOR A NEW WASTEWATER TREATMENT PLANT AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE PURCHASE OF NEW OXIDATION DITCH EQUIPMENT, NEW 70 FT. DIAMETER FINAL CLARIFIER MECHANISM, 35 FT. DIAMETER CLARIFIERS, BAFFLES, FRP TROUGHS, WEIRS, RAS PUMPS, INFLUENT PUMP, BYPASS PUMP AND DIGESTER BLOWERS/MOTORS, AND ELECTRIC PANELS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE NEW EQUIPMENT FOR THE WASTEWATER TREATMENT PLANT, WHICH IS EXPECTED TO LEAD TO AN INCREASE IN THE WWTP'S CAPACITY FROM 0.75 MGD TO 1.25 MGD FOR MID-OHIO WATER AND SEWER DISTRICT.Ohio (EPA federal awards)MID OHIO WATER & SEWER DISTRICT$1.5M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF MIDDLEBURG HEIGHTS TO IMPLEMENT ITS PROJECT TO INSTALL APPROXIMATELY SANITARY RELIEF SEWER AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF WASTEWATER INFRASTRUCTURE CONSTRUCTION. WORKPLAN ACTIVITIES CONSIST OF: CONVEYANCE SYSTEM IMPROVEMENTS AND STORMWATER MANAGEMENT/TREATMENT. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE INSTALLATION OF APPROXIMATELY 4,058 LINEAR FEET OF A NEW SANITARY RELIEF SEWER ON INDIAN CREEK DRIVE AND BALDWIN CREEK DRIVE. THE EXPECTED OUTCOMES INCLUDE PREVENTING HOUSEHOLD FLOODING FROM THE SANITARY SEWER INTO BASEMENTS. THIS IS A HEALTH AND SAFETY ISSUE FOR OUR RESIDENTS WHO HAVE SANITARY SEWER BACKUPS AS THEY THEN NEED TO CLEAN AND SANITIZE THEIR BASEMENTS. THE CURRENT CONDITIONS ESTIMATE THAT 222 HOUSEHOLDS ARE AT RISK OF FLOODING. THE PROJECT WILL DIRECTLY BENEFIT 128 HOUSEHOLDS AND INDIRECTLY BENEFIT 414 HOUSEHOLDS AND WILL PROVIDE AT LEAST A TEN (10} YEAR LEVEL OF SERVICE DURING A ONE (1) HOUR DESIGN STORM. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS WITHIN THE CITY OF MIDDLEBURG HEIGHTS.Ohio (EPA federal awards)CITY OF MIDDLEBURG HEIGHTS$1.3M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF FAIRVIEW PARK TO IMPLEMENT ITS PROJECT FOR THE STUDY AND DESIGN OF A NEW EQUALIZATION TANK AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF: WASTEWATER TREATMENT PLANT IMPROVEMENTS, CONVEYANCE SYSTEM IMPROVEMENTS, AND STORMWATER MANAGEMENT/TREATMENT. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE THE STUDY AND DESIGN PLANS FOR AN EQUALIZATION TANK WITHIN THE CITY OF FAIRVIEW PARK. THE EXPECTED OUTCOMES INCLUDE REDUCING THE PRESSURE PLACED ON THE WWTP WHICH WILL REDUCE THE QUANTITY OF UNDERTREATED SEWAGE ENTERING LAKE ERIE, AND THE FLOODING OF SEWAGE IN RESIDENCES. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS WITHIN THE CITY OF FAIRVIEW PARK.Ohio (EPA federal awards)CITY OF FAIRVIEW PARK$1.2M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF STEUBENVILLE TO IMPLEMENT ITS PROJECT TO REPLACE THE GRIT REMOVAL SYSTEM AT THE WASTEWATER TREATMENT PLANT AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE REPLACEMENT OF THE GRIT REMOVAL SYSTEM AT THE CITY OF STEUBENVILLE'S WASTEWATER TREATMENT PLANT. WORKPLAN ACTIVITIES CONSIST OF REMOVING THE EXISTING EQUIPMENT WHICH WAS INSTALLED IN 1979 AND INSTALLING A NEW SYSTEM WHICH WILL ALLOW THE PLANT TO OPERATE MORE EFFICIENTLY. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE A NEW GRIT REMOVAL SYSTEM AT THE CITY OF STEUBENVILLE'S WASTEWATER TREATMENT PLANT. THE EXPECTED OUTCOMES INCLUDE A MORE EFFICIENT WASTEWATER TREATMENT PLANT IN THE CITY OF STEUBENVILLE. THE INTENDED BENEFICIARIES INCLUDE THE RESIDENTS OF STEUBENVILLE.Ohio (EPA federal awards)CITY OF STEUBENVILLE$1.0M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO WASHINGTON COUNTY BOARD OF COMMISSIONERS TO IMPLEMENT ITS PROJECT FOR THE DESIGN AND ENGINEERING OF A NEW SEWER COLLECTION SYSTEM AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF WASTEWATER INFRASTRUCTURE CONSTRUCTION. WORKPLAN ACTIVITIES CONSIST OF: CONVEYANCE SYSTEM IMPROVEMENTS, WASTEWATER MANAGEMENT/TREATMENT SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE PRELIMINARY ENGINEERING REPORT, ALTERNATIVES ANALYSIS, DETAILED DESIGN DOCUMENTS, PROFESSIONAL ENGINEER'S ESTIMATE, AND THE BID, CONSTRUCTION AND CONTRACT DOCUMENTS FOR A SEWAGE COLLECTION SYSTEM ALONG STATE ROUTE 7. THE EXPECTED OUTCOMES INCLUDE PRELIMINARY ENGINEERING AND DETAILED DESIGN FOR A LOW PRESSURE SEWAGE COLLECTION OF WASTEWATER FROM CURRENTLY UNSEWERED AREAS ALONG STATE ROUTE 7 FROM BLUE KNOB ROAD AND TRANSPORT OF THE WASTEWATER TO EITHER THE CITY OF BELPRE'S EXISTING GRAVITY COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT OR TO THE CITY OF MARIETTA'S EXISTING GRAVITY COLLECTION SYSTEM AND WASTEWATER TREATMENT PLANT. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS WITHIN WASHINGTON COUNTY, OH.Ohio (EPA federal awards)WASHINGTON COUNTY COMMISSIONERS$1.0M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF TOLEDO TO IMPLEMENT ITS PROJECT TO RESTORE THE OPERATIONAL PERFORMANCE OF THE BELT FILTER PRESSES (BFP) THROUGH A COMPREHENSIVE REBUILD AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF: WASTEWATER TREATMENT PLANT IMPROVEMENTS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE REPLACING ALL WORN COMPONENTS OF THE BFP SYSTEM, ALONG WITH ASSOCIATED UPGRADES TO RELATED EQUIPMENT, INCLUDING WASH WATER PUMPS, ELECTRICAL SYSTEMS, AND CONTROL COMPONENTS. THE EXPECTED OUTCOMES INCLUDE REDUCED UNPLANNED DOWNTIME AND ENHANCED DEWATERING EFFICIENCY. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS WITHIN THE CITY OF TOLEDO.Ohio (EPA federal awards)CITY OF TOLEDO$880K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF COLUMBIANA TO IMPLEMENT ITS PROJECT TO INSTALL A NEW SEWER LIFT STATION AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE INSTALLATION OF A NEW SEWER LIFT STATION TO FUNCTIONALLY REPLACE AN EXISTING LIFT STATION AND OF A GRAVITY SEWER AND FORCE MAIN TO CONNECT THE LIFT STATION TO THE CITY'S SEWER SYSTEM. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE A NEW SEWER LIFT STATION, GRAVITY SEWER, AND FORCE MAIN. THE EXCEPTED OUTCOMES ARE THE IMPROVEMENT OF THE CITY OF COLUMBIANA'S WASTEWATER INFRASTRUCTURE AS THE NEW LIFT STATION IS FUNCTIONALLY REPLACING A FAILING LIFT STATION. THE INTENDED BENEFICIARIES INCLUDE THE RESIDENTS OF COLUMBIANA, OH.Ohio (EPA federal awards)CITY OF COLUMBIANA$1.0M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE VILLAGE OF SEVILLE TO IMPLEMENT ITS PROJECT TO EXPAND THE EXISTING WASTEWATER TREATMENT PLANT AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF: WASTEWATER TREATMENT PLANT IMPROVEMENTS.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE THE ADDITION OF AN SBR, NEW LAB BUILDING, AND REHABILITATED CONTROLS, PUMPS, VALVES, BLOWERS, AND FINAL CLARIFIER. THE EXPECTED OUTCOMES INCLUDE AN INCREASED CAPACITY AT THE WASTEWATER TREATMENT PLANT. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS WITHIN THE VILLAGE OF SEVILLE.Ohio (EPA federal awards)VILLAGE OF SEVILLE$1.0M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO HOLMES COUNTY COMMISSIONERS TO IMPLEMENT ITS WASTEWATER TREATMENT PLANT EXPANSION PROJECT AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF WASTEWATER INFRASTRUCTURE CONSTRUCTION. WORKPLAN ACTIVITIES CONSIST OF: WASTEWATER TREATMENT PLANT IMPROVEMENTS AND STORMWATER POLLUTION PREVENTION MEASURES.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE CONSTRUCTION OF THE COPPER TREATMENT BUILDING ADDITION AND CHEMICAL SURGE TANKS. THE EXPECTED OUTCOMES INCLUDE THE REMOVAL OF COPPER DOWN BELOW A DISCHARGE LIMIT OF 24 UG/L TO PROTECT THE DOUGHTY CREEK AND SURROUNDING WATERSHED. THE INTENDED BENEFICIARIES INCLUDE HOLMES COUNTY.Ohio (EPA federal awards)HOLMES COUNTY COMMISSIONERS$1.0M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF GARFIELD HEIGHTS TO IMPLEMENT ITS PROJECT TO CONSTRUCT A NEW STORM SEWER AND LINING THE EXISTING COMBINED SEWER TO CONVEY ONLY SANITARY SEWER AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER INFRASTRUCTURE CONSTRUCTION AND STORM WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF: STORMWATER MANAGEMENT/TREATMENT, AND SANITARY SEWER SYSTEM IMPROVEMENTS SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE COMPLETION OF THE NEW STORM SEWER, CONVERSION OF THE COMBINED SEWER TO SANITARY SEWER, SERVICE LATERAL TIE INS, RESTORATION OF THE ROADWAY AND OTHER DISTURBED AREAS, AND ELIMINATION OF THE COMBINED SEWER FLOW. THE EXPECTED OUTCOMES INCLUDE REDUCED BASEMENT AND ROADWAY FLOODING AND AN IMPROVED STORMWATER AND SEWER SYSTEM. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS NEAR THE MLK BOULEVARD AREA IN THE CITY OF GARFIELD HEIGHTS.Ohio (EPA federal awards)CITY OF GARFIELD HEIGHTS$1.0M
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO CITY OF CIRCLEVILLE TO IMPLEMENT ITS PROJECT TO TO BRING SEWER SERVICE TO PROPERTIES THAT ARE CURRENTLY USING HOME SEWAGE TREATMENT SYSTEMS AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE INSTALLATION OF 8,700 LINEAR FEET OF NEW SEWER PIPES, MANHOLES, AND TEN INDIVIDUAL GRINDER PUMPS THROUGHOUT THE CITY OF CIRCLEVILLE. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE 8,700 LINEAR FEET OF NEW SEWER PIPES, MANHOLES, AND TEN INDIVIDUAL GRINDER PUMPS THROUGHOUT THE CITY OF CIRCLEVILLE. THE EXPECTED OUTCOMES ARE THE CITY OF CIRCLEVILLE BRINING SEWER SERVICE TO PROPERTIES THAT ARE CURRENTLY USING HOME SEWAGE TREATMENT SYSTEMS. THE INTENDED BENEFICIARIES INCLUDE THE RESIDENTS OF THE CITY OF CIRCLEVILLE.Ohio (EPA federal awards)CITY OF CIRCLEVILLE$975K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO CITY OF LAKEWOOD TO IMPLEMENT ITS PROJECT TO INSTALL A NEW CONTROL BUILDING FOR THEIR NEW 6.1 MILLION GALLON STORAGE FACILITY AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE INSTALLATION OF A NEW CONTROL BUILDING FOR THE CITY OF LAKEWOOD'S NEW 6.1 MILLION GALLON STORAGE TANK. THE 6.1 MILLION GALLON STORAGE TANK IS ADJACENT TO THE LAKEWOOD WASTEWATER TREATMENT PLANT AND WILL REDUCE THE NUMBER OF SEWER OVERFLOWS INTO THE ROCKY RIVER. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE A NEW CONTROL BUILDING FOR THE 6.1 MILLION GALLON STORAGE FACILITY ADJACENT TO THE LAKEWOOD WASTEWATER TREATMENT PLANT. THE EXPECTED OUTCOMES INCLUDE REDUCED OCCURRENCES OF SEWER OVERFLOWS INTO THE ROCKY RIVER. THE INTENDED BENEFICIARIES INCLUDE THE RESIDENTS OF LAKEWOOD AND THE ENVIRONMENT SURROUNDING LAKE ERIE.Ohio (EPA federal awards)CITY OF LAKEWOOD$960K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO FULTON COUNTY TO IMPLEMENT ITS PROJECT TO RELOCATE AND UPDATE IT'S WASTE WATER TREATMENT PLANT AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE UPDATE AND RELOCATION OF THE PLEASANT VIEW WASTEWATER TREATMENT PLANT (WWTP) IN FULTON COUNTY, OH. UPDATING AND RELOCATING THE WWTP WILL ENSURE RELIABLE TREATMENT OF THE SEWAGE FROM THE NEARBY SUBDIVISION AND REDUCE THE RISK OF UNTREATED SEWAGE ENTERING THE SURROUNDING ENVIRONMENT DURING A FLOOD EVENT. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE A UPDATED AND RELOCATED PLEASANT VIEW WASTEWATER TREATMENT PLANT. THE EXPECTED OUTCOMES ARE MORE RELIABLE TREATMENT OF SEWAGE AND THE REDUCED RISK OF UNTREATED WASTEWATER ENTERING THE ENVIRONMENT DURING A FLOOD EVENT. THE INTENDED BENEFICIARIES ARE THE RESIDENTS OF FULTON COUNTY.Ohio (EPA federal awards)FULTON COUNTY$960K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO CITY OF BAY VILLAGE TO IMPLEMENT DESIGN AND ENGINEERING FOR THEIR SANITARY SEWER OVERFLOW ELIMINATION PROJECT AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF DESIGN AND ENGINEERING OF THE SANITARY SEWER OVERFLOW ELIMINATION PROJECT. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE ENGINEERING AND DESIGN OF THE EQUALIZATION TANK, CONSTRUCTION SPECIFICATIONS AND COST ESTIMATES, CONSTRUCTION INSPECTION, ENGINEER REVIEWED OPERATION AND MAINTENANCE MATERIALS AND POST CONSTRUCTION MONITORING FOR THE CITY OF BAY VILLAGE'S SANITARY SEWER OVERFLOW ELIMINATION PROJECT. THE EXPECTED OUTCOMES INCLUDE REMOVAL OF THE TWO SANITARY SEWER OVERFLOWS AND ELIMINATION OF SEWAGE DISCHARGES INTO LAKE ERIE. THE INTENDED BENEFICIARIES INCLUDE THE RESIDENTS OF BAY VILLAGE AND COMMUNITIES SURROUNDING LAKE ERIE.Ohio (EPA federal awards)CITY OF BAY VILLAGE OHIO$866K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO BELMONT COUNTY WATER AND SEWER DISTRICT TO IMPLEMENT ITS PROJECT TO MAKE IMPROVEMENTS TO THEIR SANITARY SEWER SYSTEM AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE CONSTRUCTION OF APPROXIMATELY 6,820 LF 12' PVC GRAVITY FORCE MAIN RUNNING FROM PASCO DRIVE TO THE TAFLAN TANK TO REPLACE THE EXISTING 8' GRAVITY FORCE MAIN. THE PROJECT ALSO INCLUDES THE REFURBISHMENT OF THE TOPS OF 25 MANHOLES ON THE EXISTING 12' GRAVITY SEWER LINE.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE REPLACEMENT OF EXISTING GRAVITY FORCE MAIN AND REFURBISHMENT OF EXISTING MANHOLES, WHICH ARE EXPECTED TO LEAD TO INCREASED SEWAGE CAPACITY AND REDUCED ODOR ISSUES FOR RESIDENTS OF BELMONT COUNTY.Ohio (EPA federal awards)COUNTY OF OHIO BELMONT$800K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE GEAUGA COUNTY DEPARTMENT OF WATER RESOURCES (GCDWR) TO IMPLEMENT ITS PROJECT TO RENOVATE AND UPGRADE THE MCFARLAND WASTEWATER TREATMENT PLANT (WWTP) AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT.ACTIVITIES:GCDWR INTENDS TO USE THIS FUNDING TO PURCHASE THE EQUIPMENT NEEDED TO UPGRADE THE MCFARLAND WWTP. THEY WILL PURCHASE: - MECHANICAL SCREENING PACKAGE - GRIT REMOVAL PACKAGE - 2 SUMP PUMPS -NON-POTABLE WATER BOOSTER PUMP - 3 INFLUENT PUMPS - 2 EQ PUMPS; AND -ROLL-OFF CONTAINERS FOR GRIT DISPOSAL SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE (INSERT SPECIFICS FROM THE WORKPLAN), WHICH ARE EXPECTED TO LEAD TO BRING THE MCFARLAND WWTP INTO COMPLIANCE WITH THE REQUIREMENTS OF AN ADMINISTRATIVE ORDER ON CONSENT BETWEEN THE U.S. ENVIRONMENTAL PROTECTION AGENCY, REGION 5 AND GEAUGA COUNTY.Ohio (EPA federal awards)GEAUGA COUNTY DEPARTMENT OF WATER RESOURCES$800K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO MADISON COUNTY BOARD TO IMPLEMENT ITS PROJECT TO TO EXTEND SEWER LINES AND PROVIDE SANITARY SEWER SERVICE TO UNINCORPORATED AREAS IN AND AROUND SUMMERFORD, OH AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE FUNDING TWO MATERIAL PURCHASE CONTRACTS: - THE FIRST MATERIAL ONLY CONTRACT IS FOR THE PURCHASE AND DELIVERY OF 94 SIMPLEX GRINDER PUMPS, A DUPLEX GRINDER PUMP, AND 25 SPARE GRINDER PUMPS. - THE SECOND MATERIAL ONLY CONTRACT IS FOR THE PURCHASE AND DELIVERY OF AN EXCEL PUMP STATION WITH DIESEL GENERATOR AND ATS BOTH OF THESE CONTRACTS WILL CONTRIBUTE TO THE INSTALLATION OF A NEW CENTRALIZED WASTEWATER TREATMENT SYSTEM. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE MATERIAL PURCHASING CONTRACTS, WHICH ARE EXPECTED TO LEAD TO THE INSTALLATION OF A CENTRALIZED WASTEWATER TREATMENT SYSTEM IN SUMMERFORD, OH CONNECTING SERVICES TO OVER 100 RESIDENTS WHO ARE CURRENTLY RESPONSIBLE FOR THEIR OWN ON-SITE TREATMENT SYSTEM.Ohio (EPA federal awards)MADISON COUNTY SANITARY SEWER & WATER$765K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO CITY OF COLUMBUS, DEPARTMENT OF PUBLIC UTILITIES TO IMPLEMENT ITS PROJECT TO CONDUCT AN OPTIMIZATION STUDY FOR THE SOUTHERLY WASTEWATER TREATMENT PLANT EXPANSION AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER INFRASTRUCTURE STUDY. WORKPLAN ACTIVITIES CONSIST OF WASTEWATER TREATMENT PLANT EXPANSION IMPROVEMENTS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE TECHNICAL MEMORANDUMS ASSOCIATED WITH INDIVIDUAL STUDIES TO JUSTIFY ADDITIONAL PRIMARY AND SECONDARY TREATMENT FOR SWWTP THAT IS ASSUMED TO BE SIZED TO HANDLE 37 MGD AVERAGE DAILY FLOW AND 110 MGD OF PEAK DAILY FLOW, AND INCLUDE THE ABILITY TO TREAT FOR PHOSPHORUS. THE EXPECTED OUTCOMES INCLUDE ENVIRONMENTAL BENEFITS BY PROTECTING AQUATIC ECOSYSTEMS, MITIGATING WATER POLLUTION, CONSERVING WATER RESOURCES, REDUCING NUTRIENT POLLUTION, GENERATING RENEWABLE ENERGY, AND IMPROVING SOIL AND AGRICULTURAL PRACTICES. THE OPTIMIZATION STUDY WILL REVIEW THE EXISTING PLANT CONDITION AND DESIGN BASIS, AND DETERMINING ALL POTENTIAL OPPORTUNITIES FOR OPTIMIZING THE PLANT OPERATION WITHIN THOSE EXISTING CONDITIONS. ONCE THOSE ALTERNATIVES ARE DEVELOPED AND EVALUATED, THE NEEDS FOR POTENTIAL FUTURE EXPANSION WILL BE EVALUATED AND CONSIDERED TO DETERMINE THE HIGHEST ENVIRONMENTAL BENEFIT AND RETURN ON INVESTMENT. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS WITHIN THE CITY OF COLUMBUS, OHIO.Ohio (EPA federal awards)CITY OF COLUMBUS$750K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO TRI-CITIES NORTH REGIONAL WASTEWATER AUTHORITY TO IMPLEMENT ITS PROJECT TO PLAN AND DESIGN IMPROVEMENTS TO THE TRI-CITIES NORTH REGIONAL WASTEWATER AUTHORITY (TCA) NORTH REGIONAL WASTEWATER TREATMENT PLANT AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES INCLUDE PRELIMINARY PLANNING AND DESIGNING IMPROVEMENTS TO TRI-CITIES NORTH REGIONAL WASTEWATER AUTHORITY(TCA) NORTH REGIONAL WASTEWATER TREATMENT PLANT. THE OUTCOMES OF THE PRELIMINARY PLANNING AND DESIGN PHASE IS A BASIS OF DESIGN REPORT THAT OUTLINES PROPOSED DESIGN CRITERIA FOR EACH TREATMENT PROCESS, NEW STRUCTURE, AND SITE WORK.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLE IS THE A BASIS OF DESIGN REPORT FOR THE IMPROVEMENTS TO THE TRI-CITIES NORTH REGIONAL WASTEWATER AUTHORITY(TCA) NORTH REGIONAL WASTEWATER TREATMENT PLANT. THE EXPECTED OUTCOMES INCLUDE IMPROVED WASTEWATER TREATMENT AND ULTIMATELY IMPROVED WATER QUALITY THROUGHOUT THE SURROUNDING AREAS. THE INTENDED BENEFICIARIES INCLUDE THE RESIDENTS OF THE TRI-CITIES REGION.Ohio (EPA federal awards)TRI CITIES NORTH REGIONAL WASTE WATER AUTHORITY$750K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE VILLAGE OF LOWELLVILLE TO IMPLEMENT ITS PROJECT TO MAKE WASTEWATER IMPROVEMENTS AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE CONSTRUCTION OF A NEW PUMP/LIFT STATION AND A NEW FORCE MAIN.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE A NEW PUMP/LIFT STATION AND A NEW FORCE MAIN, WHICH ARE EXPECTED TO LEAD TO REDUCE SANITARY SEWER BACKUPS FOR THE VILLAGE OF LOWELLVILLE.Ohio (EPA federal awards)LOWELLVILLE VILLAGE OF$550K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE VILLAGE OF SCIO TO IMPLEMENT ITS PROJECT TO EXTEND A PUBLIC SEWER MAIN TO PROVIDE MUNICIPAL SEWER CONNECTIONS AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF WASTEWATER INFRASTRUCTURE CONSTRUCTION. WORKPLAN ACTIVITIES CONSIST OF CONVEYANCE SYSTEM IMPROVEMENTS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE INSTALLATION AND EXTENSION OF THE SANITARY SEWER SYSTEM. THE EXPECTED OUTCOMES INCLUDE PROPER SEWAGE COLLECTION AND TREATMENT, ELIMINATING POTENTIAL HEALTH RISKS FROM SEWAGE IN A RESIDENTIAL AREA. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS OF THE VILLAGE OF SCIO.Ohio (EPA federal awards)SCIO VILLAGE OF$500K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE VILLAGE OF TUSCARAWAS TO IMPLEMENT ITS PROJECT TO IMPROVE THE EXISTING WWTP AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF WASTEWATER TREATMENT PLANT IMPROVEMENTS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE REPLACEMENT OF A DIFFUSED AERATION SYSTEM, CHLORINE GAS SANITIZATION SYSTEM, DIESEL GENERATOR, INFLUENT PUMP, WET WELL PUMP, AND INSTALLATION OF CONTINUOUS SAMPLERS AND MECHANICAL BAR SCREENINGS. THE EXPECTED OUTCOMES INCLUDE BEING ABLE TO OPERATE THE WWTP PROPERLY DURING A POWER OUTAGE AND BRING THE AERATION SYSTEM BACK TO OPERATIONAL CONDITIONS. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS OF THE WAINWRIGHT DISTRICT AND THE VILLAGE OF TUSCARAWAS.Ohio (EPA federal awards)TUSCARAWAS, VILLAGE OF$500K
DESCRIPTION: THE TOLEDO METROPOLITAN AREA COUNCIL OF GOVERNMENTS WILL WORK WITH OWENS COMMUNITY COLLEGE, THE CITY OF TOLEDO, AND PARTNERS IN EDUCATION, PUBLIC UTILITIES, LABOR UNIONS, TRADE ORGANIZATIONS, AND COMMUNITY PARTNERS TO CREATE A WATER AND WASTEWATER SECTOR WORKFORCE DEVELOPMENT COLLABORATIVE THAT WILL RECRUIT, TRAIN, AND PLACE WORKERS IN PUBLIC AND PRIVATE SECTOR UTILITIES TO ADDRESS REGIONAL WORKFORCE NEEDS IN NORTHWEST OHIO, WHICH CURRENTLY FACES ANTICIPATED WORKFORCE SHORTAGES AS 41% OF WATER AND 44% WASTEWATER OPERATORS PREPARE TO RETIRE BY 2028. A SUBAWARD WILL BE ISSUED TO OWENS COMMUNITY COLLEGE FOR EDUCATION AND TRAINING OF STUDENTS TO COVER LAB FEES, TUITION, AND PROFESSIONAL INSTRUCTIONAL DEVELOPMENT. ACTIVITIES: THIS COLLABORATIVE EFFORT WILL PROVIDE A STRUCTURED TRAINING AND A CLEAR CAREER PATH FOR FUTURE WATER AND WASTEWATER OPERATORS FROM SECONDARY AND POST-SECONDARY EDUCATION AND INDIVIDUALS RE-ENTERING THE WORKFORCE. OUTCOMES: GRADUATES OF THE PROGRAM WILL BE PREPARED TO TAKE AND PASS THE OHIO EPA CLASS I WATER AND/OR WASTEWATER EXAMINATION AS AN OPERATOR IN TRAINING. ANTICIPATED OUTCOMES OF THE PROGRAM INCLUDE STRENGTHENED COLLABORATIONS TO SUPPORT THE CHANGING NEEDS OF THE WATER UTILITY WORKFORCE IN NW OHIO, MORE INDIVIDUALS ENTERING THE UTILITY WORKFORCE, INCREASED TRAINING OPPORTUNITIES FOR THOSE ENTERING THE WATER UTILITY WORKFORCE, GREATER AVAILABILITY OF FACULTY AND WATER UTILITY EMPLOYEES TO TRAIN INCOMING WATER UTILITY EMPLOYEES, ENHANCED SKILLSETS FOR EXISTING WATER UTILITY EMPLOYEES IN NW OHIO, AND IMPROVED IN COMMUNICATIONS BETWEEN WATER UTILITIES AND POTENTIAL EMPLOYEES. SUBRECIPIENT:Ohio (EPA federal awards)TOLEDO METROPOLITAN AREA COUNCIL OF GOVERNMENTS$495K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE VILLAGE OF GROVER HILL TO IMPLEMENT ITS PROJECT TO REMOVE AND REPLACE THE OLD CONCRETE SEPTIC TANK WITH A NEW HDPE SEPTIC TANK, THE INSTALLATION OF NEW MANHOLES, AND THE INSTALLATION OF A NEW SUBMERSIBLE PUMP AT THE WAYNE STREET LIFT STATION AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A WASTEWATER INFRASTRUCTURE CONSTRUCTION AND STORM WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF: CONVEYANCE SYSTEM IMPROVEMENTS, LIFT STATION UPGRADES, AND STORMWATER MANAGEMENT SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE THE REMOVAL AND REPLACEMENT OF THE OLD CONCRETE SEPTIC TANK WITH A NEW HDPE SEPTIC TANK, THE INSTALLATION OF NEW MANHOLES, AND THE INSTALLATION OF A NEW SUBMERSIBLE PUMP AT THE WAYNE STREET LIFT STATION. THE REMOVAL AND REPLACEMENT OF THE OLD CONCRETE SEPTIC TANK WITH A NEW HDPE SEPTIC TANK WILL ENSURE WASTE FROM THE RESIDENTS ARE BEING PROPERLY HANDLED AND EVENTUALLY TREATED AT THE WWTP. THE INSTALLATION OF NEW MANHOLES WILL HELP ENABLE THE VILLAGE TO CLEAN AND TELEVISE THE COLLECTION SYSTEM. THE LIFT STATION IS CURRENTLY NOT OPERATING AS DESIGNED AND THE IMPROVEMENTS TO BE MADE WILL HELP ENSURE THE PROPER PUMPING OF WASTEWATER TO THE WWTP AND THAT THE STATION WILL BE BE ER PREPARED FOR EMERGENCIES. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS IN THE VILLAGE OF GROVER HILL.Ohio (EPA federal awards)VILLAGE OF GROVER HILL$400K
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF WILMINGTON TO IMPLEMENT ITS PROJECT TO UPDATE THEIR WASTEWATER TREATMENT PLANT AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE PURCHASING OF THE GRIT REMOVAL EQUIPMENT.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE THE GRIT REMOVAL EQUIPMENT, WHICH ARE EXPECTED TO RESULT IN BETTER WATER QUALITY IN LYTLE CREEK AND OTHER DOWNSTREAM RIVERS AND WATERBODIES FOR THE CITY OF WILMINGTON.Ohio (EPA federal awards)WILMINGTON CITY OF$400K