New Jersey stormwater contracts

19 contracts tracked across 1 municipality.

Contracts
19
municipalities
1
Distinct vendors
12

municipalities with the most stormwater contracts

Top vendors in New Jersey stormwater

VendorContractsVolume
VERINA CONSULTING GROUP LLC5$481K
NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION3$11.4M
OCEAN COUNTY COLLEGE2$4.5M
GUARDIAN ENVIRONMENTAL SERVICES CO INC1$350K
CITY OF HACKENSACK1$4.5M
TOWNSHIP OF TEANECK1$1.1M

Recent stormwater contracts in New Jersey

TitlemunicipalityVendorValueSolicitation
CONDUCT REMOVAL ACTIVITIES AT THE PIONEER METAL FINISHING SITE IN FRANKLINVILLE, NJ UNDER SITE ID A28J, TO MITIGATE RUNOFF WATER AND SOILS FOR STREET DECONTAMINATION, CONTAINMENT OF FIRE WATER RUNOFF AND DECONTAMINATION OF EQUIPMENT AND SUPPLIES AT TNew Jersey (EPA federal awards)GUARDIAN ENVIRONMENTAL SERVICES CO INC$350K—
TASK ORDER UNDER EXISTING IDIQ CONTRACT #68HERC22D0005 TITLED "MODIFICATION TO STORMWATER PLANTERS FOR INCREASED PERFORMANCE"New Jersey (EPA federal awards)VERINA CONSULTING GROUP LLC$150K—
NEW TASK ORDER UNDER CONTRACT #68HERC22D0005 TITLED "RESEARCH IN SUPPORT OF MONITORING STORMWATER CONTROL MEASURESNew Jersey (EPA federal awards)VERINA CONSULTING GROUP LLC$122K—
AJ11 - MODIFICATION TO STORMWATER PLANTERS FOR INCREASED PERFORMANCENew Jersey (EPA federal awards)VERINA CONSULTING GROUP LLC$51K—
NEW TASK ORDER UNDER EXISTING IDIQ CONTRACT# 68HERC22D0005 TITLED "PRELIMINARY INVESTIGATION INTO THE FEASIBILITY OF DESIGNING CAPILLARY BARRIERS IN STORMWATER CONTROL MEASURES"New Jersey (EPA federal awards)VERINA CONSULTING GROUP LLC$28K—
DESCRIPTION:THE AGREEMENT PROVIDES FUNDING TO SUPPORT THE NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION PROJECT TO PROVIDE SUBAWARDS TO LOCAL MUNICIPALITIES IN NEW JERSEY FOR COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE WATER QUALITY IMPROVEMENT AND PROTECTION PROJECTS.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND DEVELOPMENT OF OVERFLOW AND/OR STORMWATER INFRASTRUCTURE PROJECTS. SUBRECIPIENT:SUBAWARD ACTIVITIES UNDER THIS AWARD INCLUDE PLANNING, DESIGN AND CONSTRUCTION OF STORMWATER INFRASTRUCTURE PROJECTS.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE: PLANS, DESIGNS, AND/OR CONSTRUCTED OVERFLOW OR STORMWATER INFRASTRUCTURE. ADDITIONAL DELIVERABLES MAY INCLUDE: INTEGRATED STORMWATER MANAGEMENT MASTER PLAN; TECHNICAL DESIGN DOCUMENTS; SANITARY SEWER OVERFLOW CONTROL SOLUTIONS, INCLUDING PLANS AND SPECIFICATIONS FOR THE SANITARY SEWER OVERFLOW PROJECT TO CORRECT AND REDUCE INFLOW AND INFILTRATION. THE EXPECTED OUTCOMES ARE: THE OUTCOMES PROVIDED FROM THIS GRANT ARE EXPECTED TO PROTECT PUBLIC HEALTH AND IMPROVE WATER QUALITY BY REDUCING SEWER OVERFLOWS THROUGH THE MANAGEMENT OF STORMWATER. THE INTENDED BENEFICIARIES ARE: MUNICIPAL ENTITIES, OF WHICH, MAY BE RURAL AND/OR DISADVANTAGED COMMUNITIES.New Jersey (EPA federal awards)NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION$5.3M—
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF HACKENSACK, NJ TO IMPLEMENT ITS PROJECT TO CONSTRUCT SEPARATED STORMWATER AND SANITARY SEWER IMPROVEMENTS WITHIN CAMDEN STREET, UNION STREET, CLAY STREET, PARK STREET, AND RAILROAD AVENUE, AND FROM EAST CAMDEN STREET, THROUGH FOSCHINI PARK, TO THE HACKENSACK RIVER AS DIRECTED IN THE 2022 AND 2023 CONSOLIDATED APPROPRIATIONS ACTS OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. THE PROJECT WILL IMPLEMENT IMMEDIATE IMPROVEMENTS THAT INCREASE OPERABILITY OF THE CITY'S STORMWATER, SANITARY, AND COMBINED SEWER LINES, THUS PREVENTING COSTLY, REACTIONARY REPAIRS, REDUCING COMBINED SEWER OVERFLOWS, AND REDUCING FLOODING. SUCH IMPACTS, IF NOT ADDRESSED, WOULD HAVE NEGATIVELY AFFECTED THE CITY'S RESIDENTS, INCLUDING INCREASING ANNUAL TAXES AND CAUSING POTENTIAL FLOODING AND SURCHARGE DAMAGE TO HOMES, BUSINESSES, AND VITAL RECREATIONAL SPACES SUCH AS FOSCHINI PARK.ACTIVITIES:THE CITY'S PROJECT SCOPE CONSISTED OF THE CONSTRUCTION OF SEPARATED STORMWATER AND SANITARY SEWER IMPROVEMENTS WITHIN CAMDEN STREET, UNION STREET, CLAY STREET, PARK STREET, AND RAILROAD AVENUE, AND FROM EAST CAMDEN STREET, THROUGH FOSCHINI PARK, TO THE HACKENSACK RIVER. THE PROJECT WAS COMPRISED OF THREE PHASES BROKEN DOWN INTO THREE SEPARATE CONSTRUCTION CONTRACTS. 1.) CONTRACT 1 REFERS TO ALL STORMWATER AND SANITARY SEWER IMPROVEMENTS COMPLETED WITHIN UNION STREET, FROM CENTRAL AVENUE TO CAMDEN STREET, CLAY STREET, FROM PARK STREET TO UNION STREET, AND CAMDEN STREET, FROM UNION STREET TO MAIN STREET. CONTRACT 1 INCLUDED THE FOLLOWING IMPROVEMENTS: REMOVAL OF THE EXISTING PIPES, EXCAVATION, AND TEST PITS AS NEEDED; INSTALLATION OF REINFORCED CONCRETE AND DUCTILE IRON STORMWATER PIPES RANGING FROM 12' TO 42' IN DIAMETER; INSTALLATION OF 48'X60' PRECAST CONCRETE STORMWATER BOX CULVERT; INSTALLATION OF PVC SANITARY SEWER PIPES RANGING FROM 8' TO 18' IN DIAMETER; INSTALLATION OF PVC SANITARY SEWER LATERAL CONNECTIONS RANGING FROM 6' TO 12' IN DIAMETER; INSTALLATION OF CURED IN PLACE PIPE LINING FOR EXISTING SEWERS RANGING FROM 6' TO 24' IN DIAMETER; RECONSTRUCTION OF EXISTING STORMWATER INLETS; INSTALLATION OF NEW STORMWATER INLETS AND MANHOLES; INSTALLATION OF NEW SANITARY SEWER MANHOLES; RECONSTRUCTION OF THE PROJECT AREA INCLUDING PAVEMENT, CURB, AND SIDEWALK CONSTRUCTION; TRAFFIC MARKING AND STRIPING, AND ALL ASSOCIATED MISCELLANEOUS CONSTRUCTION. 2.) CONTRACT 2 REFERS TO ONLY STORMWATER IMPROVEMENTS WITHIN EAST CAMDEN STREET AND FOSCHINI PARK, AND THROUGH A PRIVATELY OWNED PROPERTY BETWEEN FOSCHINI PARK AND THE HACKENSACK RIVER. CONTRACT 2 INCLUDED THE FOLLOWING IMPROVEMENTS: REMOVAL OF THE EXISTING PIPES, EXCAVATION, AND TEST PITS AS NECESSARY; INSTALLATION OF A CONCRETE HEADWALL AND OUTFALL WITH INLINE CHECK VALVE TO ACCOMMODATE NEW STORMWATER INFRASTRUCTURE; INSTALLATION OF REINFORCED CONCRETE STORMWATER PIPES RANGING FROM 24' TO 42' IN DIAMETER; INSTALLATION OF 48'X96' PRECAST CONCRETE STORMWATER BOX CULVERT; INSTALLATION OF PRECAST CONCRETE STORMWATER MANHOLES AND CHAMBERS; REPAVING OF THE PROJECT AREA; RELOCATION OF UTILITIES WHERE DIRECTED, AND ALL ASSOCIATED MISCELLANEOUS CONSTRUCTION. 3.) FINALLY, CONTRACT 3 REFERS TO ALL STORMWATER AND SANITARY SEWER IMPROVEMENTS COMPLETED WITHIN CLAY STREET, FROM RAILROAD PLACE TO PARK STREET, FROM CENTRAL AVENUE TO CLAY STREET, AND EAST RAILROAD AVENUE, FROM PASSAIC STREET TO CLAY STREET. ADDITIONALLY, THIS CONTRACT INCLUDED THE INSTALLATION OF STORMWATER INFRASTRUCTURE BENEATH THE NJ TRANSIT PASCACK VALLEY LINE RAILROAD AT ITS INTERSECTION WITH CLAY STREET, TO ALLOW FOR THE FUTURE CONNECTION OF INFRASTRUCTURE FROM THE WEST THAT WILL FURTHER REDUCE FLOODING. CONTRACT 3 INVOLVED THE FOLLOWING IMPROVEMENTS: REMOVAL OF THE EXISTING PIPES, EXCAVATION, AND TEST PITS AS NECESSARY; INSTALLATION OF REINFORCED CONCRETENew Jersey (EPA federal awards)CITY OF HACKENSACK$4.5M—
DESCRIPTION:THE PURPOSE OF THIS AGREEMENT IS TO PROVIDE FUNDS TO THE RECIPIENT FOR IT TO PROVIDE SUBAWARDS TO MUNICIPALITIES FOR COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE WATER QUALITY IMPROVEMENT AND PROTECTION PROJECTS.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE THE SOLICITATION AND REVIEW OF ELIGIBLE SUBAWARD RECIPIENTS WHO WILL PLAN, DESIGN AND CONSTRUCT ELIGIBLE PROJECTS.SUBRECIPIENT:SUBAWARD ACTIVITIES UNDER THIS AWARD INCLUDE PLANNING, DESIGN AND CONSTRUCTION OF STORMWATER INFRASTRUCTURE PROJECTS.OUTCOMES:THE EXPECTED OUTCOMES ARE TO PROTECT PUBLIC HEALTH AND IMPROVE WATER QUALITY BY REDUCING SEWER OVERFLOWS THROUGH THE MANAGEMENT OF STORMWATER. THE INTENDED BENEFICIARIES ARE THE MUNICIPALITIES THAT RECEIVE A SUBAWARD TO COMPLETE A PROJECT.New Jersey (EPA federal awards)NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION$3.9M—
DESCRIPTION:THIS COOPERATIVE AGREEMENT PROVIDES FUNDING UNDER THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58) TO OCEAN COUNTY COLLEGE. THE RECIPIENT WILL SUPPORT IMPLEMENTATION OF THE 2021 COMPREHENSIVE CONSERVATION AND MANAGEMENT PLAN (CCMP) AND THE POLICY COMMITTEE-APPROVED FFY24-26 IIJA WORKPLAN (IIJA FFY24-26 WORKPLAN) TO IMPROVE WATER QUALITY, PROTECT THE NATURAL HABITAT AND LIVING RESOURCES, AND SUPPORT SUSTAINABLE HUMAN USES. THE PROJECTS PROPOSED FOR FUNDING VIA THE IIJA WILL LEVERAGE EXISTING EFFORTS. SPECIFICALLY, THE RECIPIENT WILL IMPLEMENT THE FOLLOWING PROJECTS: - COUNTY/MUNICIPAL STORMWATER MANAGEMENT GRANT PROGRAM, PROVIDING A GRANT-FUNDING OPPORTUNITY TO FUND STORMWATER MANAGEMENT IMPLEMENTATION PROJECTS; - WATER QUALITY MONITORING INFRASTRUCTURE, ENABLING REPLACEMENT AND UPGRADES TO THE WATER QUALITY MONITORING EQUIPMENT TO CONTINUE THE MONITORING PROGRAM; - SAV HEALTH ASSESSMENT PROJECT, ENABLING SEAGRASS MAPPING AND PROVIDING A DEMOGRAPHIC ASSESSMENT; - JERSEY-FRIENDLY YARDS (JFY) PROJECT IMPLEMENTATION, TO FURTHER GROW AND EXPAND THIS HIGHLY SUCCESSFUL PROGRAM TO IMPROVE STORMWATER MANAGEMENT AND REDUCE NONPOINT SOURCE POLLUTION BY EDUCATING THE PUBLIC ABOUT BEST MANAGEMENT PRACTICES; - MINIMUM ECOLOGICAL WATER FLOW ASSESSMENT, TO DETERMINE MINIMUM ECOLOGICAL FLOWS TO MAINTAIN BAY ECOLOGY; - ADVANCING SUSTAINABLE TECHNOLOGIES FOR AQUACULTURE LEASES, IMPLEMENTING CONSERVATION SCENARIOS FOR OYSTERS; - HABITAT PROTECTION AND RESTORATION PLAN DEVELOPMENT; - WETLAND AND RIPARIAN MAPPING; - WETLAND ASSESSMENT AND RESTORATION AND; - IMPLEMENTATION CAPACITY BUILDING, PARTIALLY SUPPORTING BBP STAFF, INCLUDING A DEVELOPMENT COORDINATOR, SUSTAINABILITY COORDINATOR, STEWARDSHIP SPECIALIST TO HELP IMPLEMENT CCMP PRIORITIES.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE: - IMPLEMENTATION OF ONE OR MORE STORMWATER PROJECTS; - REPLACEMENT AND UPGRADES OR REFURBISHMENT OF COMPONENTS OF THE BBP WATER QUALITY MONITORING NETWORK TO ALLOW THE CONTINUED COLLECTION OF WATER QUALITY DATA; - MAPPING OF SEAGRASS TO UPDATE THE 2009 BAY-WIDE MAPPING CURRENTLY AVAILABLE AND ASSESSING THE HEALTH OF SEAGRASSES WITHIN THE BAY; - HIRING OF A FULL-TIME BBP STAFF PERSON TO ASSIST WITH JERSEY-FRIENDLY YARDS (JFY) EDUCATION AND OUTREACH PROJECT TO EDUCATE ABOUT BEST LANDSCAPE PRACTICES; - DETERMINATION OF MINIMUM WATER FLOWS ESSENTIAL FOR MAINTAINING THE ECOLOGY OF THE BAY; - IMPLEMENTATION OF CONSERVATION SCENARIOS TO RAISE OYSTERS TO BE PLACED ON A RESTORATION REEF; - DEVELOPMENT OF A HABITAT PLAN THAT WILL PRIORITIZE ENHANCEMENT AND RESTORATION PROJECTS; - WETLAND AND RIPARIAN ZONE MAPPING; - UTILIZE STREAM CROSSING AND WETLAND ASSESSMENT DATA TO ASSESS INTERTIDAL WETLANDS TO DEVELOP RESTORATION PROJECTS WITH PARTNERS AND; - PARTIALLY SUPPORT THE HIRING OF ADDITIONAL BBP PROGRAM STAFF, INCLUDING A DEVELOPMENT COORDINATOR, SUSTAINABILITY COORDINATOR, STEWARDSHIP SPECIALIST IN ORDER TO GROW THE CAPACITY OF THE BBP PROGRAM OFFICE.SUBRECIPIENT:$795,000 WILL BE MADE AVAILABLE TO MUNICIPALITIES THROUGH A GRANT FUNDING OPPORTUNITY TO ENABLE THE IMPLEMENTATION OF ONE OR MORE STORMWATER IMPLEMENTATION PROJECTS TO REDUCE NONPOINT SOURCE POLLUTION INTO BARNEGAT BAY AND INCREASE PUBLIC AWARENESS ABOUT THE BAY AND INCREASED COMMUNITY RESILIENCE. $460,000 WILL BE MADE AVAILABLE TO USGS TO ADVANCE THE WORK TO ASSESS AND IDENTIFY MINIMUM WATER FLOWS NECESSARY TO SUSTAIN THE BAY'S ECOLOGY UNDER DIFFERENT CLIMATE SCENARIOS. OUTCOMES:THE ANTICIPATED DELIVERABLES AND EXPECTED OUTCOMES ARE: - THE COMPLETION OF STORMWATER MANAGEMENT PROJECTS THAT WILL REDUCE NONPOINT SOURCE POLLUTION AND FLOODING AND INCREASE COMMUNITY RESILIENCE; - CONTINUATION OF THE COLLECTION OF WATER QUALITY DATA TO DETERMINE THE STATUS AND TRENDS OF WATER QUALITY IN THE BAY AND ASSESS THE EFFORTS TO REDUCE NONPOINT SOLUTION. - DEVELOPMENT OF MAPS OF SEAGRASS DISTRIBUTION WITHIN THE BAY AND A DEMOGRAPHIC ASSESSMENT REPORT THAT WILL BE USED TO IDENTIFY FUTURE RESTNew Jersey (EPA federal awards)OCEAN COUNTY COLLEGE$2.7M—
DESCRIPTION:THE AGREEMENT PROVIDES FUNDING TO SUPPORT THE NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION TO PROVIDE SUBAWARDS TO LOCAL MUNICIPALITIES IN NEW JERSEY FOR COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE WATER QUALITY IMPROVEMENT AND PROTECTION PROJECTS.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND DEVELOPMENT OF OVERFLOW AND/OR STORMWATER INFRASTRUCTURE PROJECTS.SUBRECIPIENT:SUBAWARD ACTIVITIES UNDER THIS AWARD INCLUDE PLANNING, DESIGN AND CONSTRUCTION OF STORMWATER INFRASTRUCTURE PROJECTS.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE: PLANS, DESIGNS, AND/OR CONSTRUCTED OVERFLOW OR STORMWATER INFRASTRUCTURE. ADDITIONAL DELIVERABLES MAY INCLUDE: INTEGRATED STORMWATER MANAGEMENT MASTER PLAN; TECHNICAL DESIGN DOCUMENTS; SANITARY SEWER OVERFLOW CONTROL SOLUTIONS, INCLUDING PLANS AND SPECIFICATIONS FOR THE SANITARY SEWER OVERFLOW PROJECT TO CORRECT AND REDUCE INFLOW AND INFILTRATION. THE OUTCOMES PROVIDED FROM THIS GRANT ARE EXPECTED TO PROTECT PUBLIC HEALTH AND IMPROVE WATER QUALITY BY REDUCING SEWER OVERFLOWS THROUGH THE MANAGEMENT OF STORMWATER. THE INTENDED BENEFICIARIES ARE: MUNICIPAL ENTITIES, OF WHICH, MAY BE RURAL AND/OR DISADVANTAGED COMMUNITIES.New Jersey (EPA federal awards)NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION$2.3M—
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE TOWNSHIP OF TEANECK TO IMPLEMENT ITS PROJECT TO INSTALL AN UNDERGROUND STORMWATER DETENTION IN SAGAMORE PARK, WHICH BORDERS BELLE AVENUE AND BEATRICE STREET AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE THE INSTALLATION OF AN UNDERGROUND STORMWATER DETENTION IN SAGAMORE PARK, WHICH BORDERS BELLE AVENUE AND BEATRICE STREET. IT WILL BE CONNECTED TO THE EXISTING STORMWATER SYSTEM IN TEANECK AND WILL RELEASE THE DETAINED WATER BACK INTO THE SYSTEM FOLLOWING A HEAVY RAINFALL EVENT. THE FOLLOWING IS THE SCOPE OF WORK FOR THE PROPOSED PROJECT: - SITE MOBILIZATION - EXCAVATION, GRADING, AND FIELD RESTORATION - INSTALLATION OF THE STORMWATER DETENTION SYSTEM - INSTALLATION OF INLETS TYPE B - INSTALLATION OF NEW STORM MANHOLES - INSTALLATION OF A 9'X18' CONCRETE VERTICAL CURB - INSTALLATION OF A CONCRETE SIDEWALK 4' THICK - INSTALLATION OF A CONCRETE AND ASPHALT DRIVEWAY APRON - 4' THICK TOPSOIL, FERTILIZING, SEEDING, AND MULCHING - REPAINTING TRAFFIC MARKINGS, LINES, AND INSTALLATION OF LONG LIFE THERMOS PLASTICSUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES AND OUTCOMES ARE A STORMWATER DETENTION SYSTEM THAT WILL SERVE AS A TEMPORARY STORAGE UNIT DURING HEAVY STORMWATER FLOW EVENTS THAT CAN HOLD UP TO 90,000 GALLONS OF WATER, WHICH IS EXPECTED TO LEAD TO THE ELIMINATION OF THREATS TO TEANECK RESIDENTS' SAFETY AND WELLBEING DUE TO FREQUENT FLOODING EVENTS.New Jersey (EPA federal awards)TOWNSHIP OF TEANECK$1.1M—
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO BOROUGH OF CLIFFSIDE PARK TO IMPLEMENT ITS PROJECT TO EXPAND THE DRAINAGE SYSTEM ON AND AROUND OAKDENE AVENUE AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDES THE EXCAVATION OF ROADWAY, SOIL AND BEDROCK, ON OREGON AVENUE, BETWEEN GREENMOUNT AVENUE AND OAKDENE AVENUE, INCLUDING THE INTERSECTIONS AT GREENMOUNT AVENUE, AND AT OAKDENE AVENUE, TO A SUFFICIENT SIZE ALLOWING PROPER INSTALLATION OF STORMWATER PIPE AND STRUCTURES. A 950 L.F. 15-INCH PVC STORMWATER PIPE WILL BE INSTALLED ON OREGON AVENUE, STARTING AT GREENMOUNT AVENUE THEN CONTINUING TO OAKDENE AVENUE. AN 80 L.F. 30-INCH PVC STORMWATER PIPE WILL BE INSTALLED ON OREGON AVENUE CONTINUING ON OAKDENE AVENUE TO CONNECT INTO THE EXISTING STORMWATER DRAINAGE SYSTEM. TWO, 48-INCH STORMWATER MANHOLES WILL BE INSTALLED: ONE AT THE INTERSECTION OF OREGON AVENUE AND GREENMOUNT AVENUE, AND ONE ON OREGON AVENUE. ONE, 60-INCH STORMWATER MANHOLE WILL BE INSTALLED AT THE INTERSECTION OF OREGON AVENUE AND OAKDENE AVENUE. NINE UNITS OF TYPE B INLETS WILL BE INSTALLED:4 UNITS AT THE INTERSECTION OF OREGON AVENUE AND GREENMOUNT AVENUE, 2 UNIT ON OREGON AVENUE, AND 3 UNITS AT THE INTERSECTION OF OREGON AVENUE AND OAKDENE AVENUE. AFTER INSTALLATION, THE AREA WILL BE BACKFILLED, COMPACTED, AND ROADWAY REPAIRED OF ANY EXCAVATIONS.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE OAKDENE AVENUE STORMWATER IMPROVEMENTS PROJECT WILL IMPROVE CRITICAL SEWER INFRASTRUCTURE AND INCREASE ITS CURRENT LIMITED CAPACITY TO REDUCE FLOODING ISSUES WITHIN RESIDENTIAL HOMES AND ON ROADWAYS. THIS PROJECT WILL PREVENT POTENTIAL COSTLY EMERGENCY REPAIRS AND FIX THE PRESENT ISSUES CAUSED BY THE OUTDATED PIPES. BY COMPLETING THIS PROJECT, PUBLIC HEALTH CONDITIONS AND SAFETY WITHIN THE BOROUGH WILL BE IMPROVED.New Jersey (EPA federal awards)BOROUGH OF CLF PK$1.0M—
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO MOUNT OLIVE TOWNSHIP TO IMPLEMENT ITS PROJECT TO MAKE IMPROVEMENTS TO THE DRAINAGE ON CEDAR STREET, MCKELVIE STREET, JOHNSON AVENUE, AND ROUTE 46 BY RETROFITTING EIGHTEEN STORM DRAIN INLETS AND INSTALLING THREE STORMWATER MANUFACTURED TREATMENT DEVICES TO REDUCE POLLUTANT DISCHARGE INTO BUDD LAKE AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A STORM WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF RETROFITTING INLETS THROUGH THE EXCAVATION OF ROADWAY AROUND THE EXISTING DRAIN, DISCONNECTING IT FROM THE SYSTEM, REMOVING THE OLD DRAIN, INSTALLING A NEW DRAIN WITH PROPER CONNECTIONS, BACKFILLING THE TRENCH WITH COMPACTED SOIL, AND RESTORING THE ROADWAY SURFACE WITH ASPHALT. THE INSTALLATION OF THE MANUFACTURED TREATMENT DEVICES (MTDS) INCLUDES SITE PREPARATION, EXCAVATION OF ROADWAY, PLACEMENT OF THE MTD UNIT, CONNECTION TO THE INLET AND OUTLET PIPES, BACKFILLING AND FINAL GRADING. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE IMPROVEMENTS TO THE DRAINAGE ON CEDAR STREET, MCKELVIE STREET, JOHNSON AVENUE, AND ROUTE 46 BY RETROFITTING EIGHTEEN STORM DRAIN INLETS AND INSTALLING THREE STORMWATER MANUFACTURED TREATMENT DEVICES TO REDUCE POLLUTANT DISCHARGE INTO BUDD LAKE. THE EXPECTED OUTCOMES INCLUDE DECREASING THE SEDIMENT AND PHOSPHORUS INPUTS INTO BUDD LAKE AND IMPROVE THE OVERALL WATER QUALITY THROUGH THE INSTALLATION OF NEW MDT'S AND RETROFITTED STORM DRAINS. THE INTENDED BENEFICIARIES INCLUDE THE RESIDENTS OF THE MOUNT OLIVE TOWNSHIP AND VISITORS.New Jersey (EPA federal awards)MOUNT OLIVE TOWNSHIP$600K—
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE TOWN OF HAMMONTON TO IMPLEMENT ITS PROJECT TO DETERMINE THE SOURCE OF THE INTRODUCTION OF UNWANTED GROUNDWATER AND STORMWATER INTO THE SEWER SYSTEM AND PERFORM SYSTEM REPAIRS AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE: CONDUCTING AN INITIAL STUDY, WHERE A WATERPROOF CAMERA WILL RECORD ANY INFILTRATION IN ABOUT 30% OF TWO PUMPING STATIONS TOTAL PIPING; PERFORMING MINOR REPAIRS TO THE SYSTEM AND SLIP LINING THE PIPE WHERE INFILTRATION HAS BEEN FOUND; EVALUATING THE EFFECTIVENESS OF THE SLIP LINING AND MINOR REPAIRS.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE A STUDY DETERMINING THE CAUSE OF INTRODUCTION OF UNWANTED STORMWATER AND GROUNDWATER INTO THE SEWER SYSTEM, MINOR REPAIRS AND SLIP LINING OF PIPES WHERE INFILTRATION HAS BEEN FOUND AND A FOLLOW-UP STUDY DETERMINING THE EFFECTIVENESS OF REPAIRS, WHICH ARE EXPECTED TO LEAD TO THE IDENTIFICATION AND THE SOLUTION OF THE CAUSE OF UNWANTED STORMWATER AND GROUNDWATER INTO THE SEWER SYSTEM FOR THE RESIDENTS OF THE TOWN OF HAMMONTON.New Jersey (EPA federal awards)TOWN OF HAMMONTON$395K—
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO CITY OF WOODBURY TO IMPLEMENT ITS PROJECT TO REHABILITATE AND REPLACE AGING STORMWATER INFRASTRUCTURE THROUGH REPLACEMENT AND LINING OF PIPES ALONG WEST BARBER AVENUE, BETWEEN S. HORACE AND S. WARNER STREETS, AND ALONG MYRTLE AVENUE AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A STORM WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF: REPLACEMENT OF EIGHTEEN-INCH CORRUGATED METAL PIPE ALONG WEST BARBER AVENUE, INSTALLATION OF A NEW MODIFIED 'B' INLET, LINING OF A 36' RCP STORMWATER PIPE BETWEEN S. HORACE AND S. WARNER STREETS, AND THE REPLACEMENT OF A 36' PIPE THAT CONNECTS A BRIDGE CULVERT WITHIN SOUTH COLUMBIA STREET TO TWO 'B' INLETS LOCATED WITHIN SOUTH HORACE STREET. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE REPLACEMENT OF EIGHTEEN-INCH CORRUGATED METAL PIPE ALONG WEST BARBER AVENUE, INSTALLATION OF A NEW MODIFIED 'B' INLET, LINING OF A 36' RCP STORMWATER PIPE BETWEEN S. HORACE AND S. WARNER STREETS, AND THE REPLACEMENT OF A 36' PIPE THAT CONNECTS A BRIDGE CULVERT WITHIN SOUTH COLUMBIA STREET TO TWO 'B' INLETS LOCATED WITHIN SOUTH HORACE STREET. THE EXPECTED OUTCOMES INCLUDE IMPROVED EFFICIENCY OF WOODBURY'S STORM SEWER NETWORK TO ENSURE EFFECTIVE PASSAGE OF STORMWATER FLOW AND REDUCE FLOODING. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS AND LOCAL ECOSYSTEMS WITHIN THE CITY OF WOODBURY.New Jersey (EPA federal awards)CITY OF WOODBURY$531K—
NEW TASK ORDER UNDER IDIQ CONTRACT 68HERC22D0005 TITLED "MODIFICATION TO STORMWATER PLANTERS FOR INCREASED PERFORMANCE AND AUTOMATING PORE WATER SAMPLING"New Jersey (EPA federal awards)VERINA CONSULTING GROUP LLC$131K—
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE MORRIS COUNTY PARK COMMISSION TO IMPLEMENT ITS PROJECT TO IMPLEMENT KEY SECURITY INFRASTRUCTURE AND STORMWATER EROSION CONTROL MEASURES ON JERSEY CITY'S BOONTON RESERVOIR PROPERTY AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE THE INSTALLATION OF NEW FENCING; THE INSTALLATION OF CLOSE-CIRCUIT (CCTV) AND/OR TRAIL CAMERAS ON THE PROPERTY; AND A COMBINATION OF ENGINEERING SOLUTIONS AND NATIVE VEGETATION PLANTINGS PLANNED TO IMPROVE THE ECOLOGICAL CONDITIONS AND POTENTIALLY IMPROVE LOCAL WATER QUALITY AT STORMWATER RUNOFF LOCATIONS.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE 4,500 LINEAR FEET OF FENCING ALONG THE GREENBANK DRIVE AND PARSIPPANY BOULEVARD SIDES OF THE RESERVOIR, ACCESS VIA 3 NEW VEHICLE GATES AND 4 PEDESTRIAN GATES, AND 18 NEW CLOSED-CIRCUIT CAMERAS INSTALLED IN STRATEGIC LOCATIONS AT THE NEWLY ESTABLISHED TRAILHEAD LOCATIONS AND ALONG THE 7.7-MILE LOOP HIKING TRAIL, AND A COLLECTION OF STORMWATER INFRASTRUCTURE IMPROVEMENTS AND ASSOCIATED NATIVE VEGETATION PLANTINGS, THUS ENHANCING WATER QUALITY PRIOR TO RELEASE INTO NEARBY STREAMS AND POTENTIALLY THE RESERVOIR, FOR RESIDENTS OF MORRIS COUNTY, JERSEY CITY, AND THE STATE OF NEW JERSEY.New Jersey (EPA federal awards)MORRIS COUNTY PARK COMMISSION$600K—
DESCRIPTION:A COOPERATIVE AGREEMENT IS PROVIDED TO OCEAN COUNTY COLLEGE/BARNEGAT BAY PARTNERSHIP (BBP) TO SUPPORT IMPLEMENTATION OF ITS 2021 COMPREHENSIVE CONSERVATION AND MANAGEMENT PLAN (CCMP) AND THE POLICY COMMITTEE-APPROVED FFY22 BIPARTISAN INFRASTRUCTURE LAW WORKPLAN DATED JANUARY 18, 2023 (BIL FFY22 WORKPLAN). THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA OR 'BIPARTISAN INFRASTRUCTURE LAW' OR BIL) PASSED THE U.S. SENATE IN AUGUST 2021 AND THE U.S. HOUSE OF REPRESENTATIVES IN NOVEMBER 2021. PRESIDENT BIDEN SIGNED IT INTO LAW ON NOVEMBER 15, 2021. THIS LEGISLATION PROVIDES AN ADDITIONAL $132 MILLION TO THE 28 NATIONAL ESTUARY PROGRAMS (NEP) OVER FIVE YEARS IN ADDITION TO REGULAR APPROPRIATIONS. IMPLEMENTATION OF THE FFY22 BIL WORKPLAN WILL HELP MEET THE FOUR GOALS LAID OUT IN THE CCMP: TO PROTECT AND IMPROVE WATER QUALITY THROUGHOUT BARNEGAT BAY AND ITS WATERSHED; TO ENSURE ADEQUATE WATER SUPPLIES AND FLOW FOR ECOLOGICAL AND HUMAN COMMUNITIES; TO PROTECT AND RESTORE HABITAT AND HEALTHY AND SUSTAINABLE NATURAL COMMUNITIES OF PLANTS AND ANIMALS AND; TO IMPROVE AND SUSTAIN COLLABORATIVE APPROACHES TO RESPONSIBLE LAND USE PLANNING AND OPEN SPACE PRESERVATION. THE PROJECTS THAT WILL BE IMPLEMENTED INCLUDE: - COUNTY/MUNICIPAL STORMWATER MANAGEMENT GRANT PROGRAM, PROVIDING A GRANT-FUNDING (SUBAWARD) OPPORTUNITY TO FUND STORMWATER MANAGEMENT IMPLEMENTATION PROJECTS WITHIN OR BENEFITTING A DISADVANTAGED COMMUNITY AND IN CONSIDERATION OF SEA LEVEL RISE; - WATER QUALITY MONITORING INFRASTRUCTURE, ENABLING REPLACEMENT AND UPGRADES TO THE WATER QUALITY MONITORING EQUIPMENT TO CONTINUE THE MONITORING PROGRAM; - MAPPING AND DEMOGRAPHIC ASSESSMENT PROJECT, ENABLING SEA GRASS MAPPING TO UPDATE THE 2009 MAPPING CURRENTLY AVAILABLE AND PROVIDING A DEMOGRAPHIC ASSESSMENT AND FILLING THE HIGHEST PRIORITY INFORMATION GAP FOR BARNEGAT BAY; - WATERSHED STREAM CROSSING ASSESSMENT, ENABLING ASSESSMENT OF CULVERTS AND BRIDGES FOR AQUATIC PASSAGE AND PRIORITIZATION FOR IMPROVEMENTS TO STREAM CONNECTIVITY AND REDUCTION IN LOCAL FLOODING; - JERSEY-FRIENDLY YARDS (JFY) PROJECT IMPLEMENTATION, TO FURTHER GROW AND EXPAND THIS HIGHLY SUCCESSFUL PROGRAM TO IMPROVE STORMWATER MANAGEMENT AND REDUCE NONPOINT SOURCE POLLUTION BY EDUCATING THE PUBLIC ABOUT BEST MANAGEMENT PRACTICES, FOCUSING ON DELIVERING PROJECTS IN DISADVANTAGED COMMUNITIES; - DIVERSITY, EQUITY, AND INCLUSION WORKGROUP, TO ENABLE THE BBP TO WORK WITH PARTNERS AND CONTRACTORS TO FURTHER IDENTIFY UNDERSERVED STAKEHOLDERS, DEVELOP A COMMUNITY WORKGROUP, AND PROVIDE FUNDING AND TECHNICAL SUPPORT; - PARTIALLY SUPPORT BBP STAFF, INCLUDING A COMMUNICATIONS COORDINATOR, WETLANDS COORDINATOR, AND CITIZEN SCIENCE/STEWARDSHIP COORDINATOR TO HELP IMPLEMENT CCMP PRIORITIES. ACTIVITIES:THE ACTIVITIES IN THE BILFFY22 WORKPLAN TO BE PERFORMED INCLUDE: - ONE OR MORE STORMWATER IMPLEMENTATION PROJECTS IN DISADVANTAGED COMMUNITIES; - REPLACEMENT AND UPGRADES OR REFURBISHMENT OF COMPONENTS OF THE BBP WATER QUALITY MONITORING NETWORK TO ALLOW THE CONTINUED COLLECTION OF WATER QUALITY DATA; - MAPPING OF SEAGRASS TO UPDATE THE 2009 BAY-WIDE MAPPING CURRENTLY AVAILABLE AND ASSESS THE HEALTH OF SEAGRASSES WITHIN THE BAY; - ASSESSMENT OF ROAD-STREAM CROSSINGS SUCH AS CULVERTS AND BRIDGES FOR AQUATIC PASSAGE AND CLIMATE READINESS AND STORING THIS INFORMATION IN A PUBLICLY ACCESSIBLE DATABASE; - HIRING OF A FULL-TIME BBP STAFF PERSON TO ASSIST WITH JERSEY-FRIENDLY YARDS (JFY) EDUCATION AND OUTREACH PROJECT TO EDUCATE ABOUT BEST LANDSCAPE PRACTICES; FOCUSING ON PROJECTS IN DISADVANTAGED COMMUNITIES; - ESTABLISHMENT OF A DIVERSITY, EQUITY, INCLUSION (DEI) WORKGROUP TO WORK WITH CONTRACTOR TO IDENTIFY DISADVANTAGED COMMUNITIES AND HELP BUILD CAPACITIES WITHIN THOSE GROUPS AND COMMUNITIES; - PARTIALLY SUPPORT THE HIRING OF ADDITIONAL BBP PROGRAM STAFF, INCLUDING A COMMUNICATIONS AND MARKETING COORDINATOR, WETLANDS COORDINATOR, AND STEWARDSHIP/CITIZEN SCIENCE POSITION IN ORDER TONew Jersey (EPA federal awards)OCEAN COUNTY COLLEGE$1.8M—
DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING UNDER THE INFLATION REDUCTION ACT (IRA). THIS AGREEMENT PROVIDES FUNDING TO CITY OF NEWARK IN NEW JERSEY AND COMPRISES A TRAINING, MONITORING AND RESEARCH/RESEARCH APPLICATION COMPONENT. THE WORKFORCE DEVELOPMENT TRAINING PROGRAM IN AIR QUALITY, GREEN INFRASTRUCTURE, AND SAFETY AND ENVIRONMENTAL REGULATIONS WILL BOOST THE UNDERSERVED NEWARK COMMUNITY'S DIRECT INVOLVEMENT IN THE LOCAL GREEN WORKFORCE AND AIR QUALITY ADVOCACY. THE AIR QUALITY (AND TEMPERATURE) MONITORING SENSORS TO BE DEPLOYED BY THE WORKFORCE DEVELOPMENT PROGRAM GRADUATES AND OTHER NEWARK RESIDENTS WILL SUPPLEMENT THESE CITIZEN SCIENTISTS' EXPERIENCE IN AIR QUALITY ADVOCACY, SUPPLEMENT THE CURRENTLY LACKLUSTER AIR QUALITY MONITORING SYSTEM IN NEWARK AND PROVIDE SUPPLEMENTAL DATA FOR THE RESEARCH COMPONENT OF THIS GRANT. THE COLLECTION AND ANALYSIS OF AIR QUALITY AND TEMPERATURE DATA BY NEW JERSEY INSTITUTE OF TECHNOLOGY WILL GIVE THE CITY OF NEWARK THE CHOICE TO ACT ON AT LEAST ONE RESULTING RECOMMENDATION TO IMPROVE AIR QUALITY AND MORE EFFICIENTLY USE CITY PLANNING RESOURCES TO ADDRESS THE URBAN HEAT ISLAND PUBLIC HEALTH CONCERN IDENTIFIED IN A PRIORITY AREA MAP ALONG WITH A PORTFOLIO OF EXAMPLE OPTIONS FOR HEAT ISLAND MITIGATION. SIMILARLY, THE DEMONSTRATION OF THE I-TREE ECO SOFTWARE APPLICATION BY NEW JERSEY INSITUTE OF TECHNOLOGY WILL ENABLE THE CITY OF NEWARK TO MAKE BETTER USE OF CITY PLANNING RESOURCES BY MAXIMIZING THE POTENTIAL BENEFITS OF GREEN INFRASTRUCTURE MEASURES. ACTIVITIES:THIS PROJECT COMPRISES FIVE MAJOR ACTIVITIES, INCLUDING: 1) CONDUCTING COMMUNITY OUTREACH AND STAKEHOLDER ENGAGEMENTS LET BY A COMMUNITY BASED NONPROFIT ORGANIZATION TO INFORM RESIDENTS ABOUT THE ENVIRONMENTAL CHALLENGES IN NEWARK AND THE BENEFITS OF THE WORKFORCE DEVELOPMENT PROGRAM TO RECRUIT POTENTIAL PARTICIPANTS, 2) DEVELOPING AND CARRYING OUT A WORKFORCE DEVELOPMENT PROGRAM COVERING 1) STORMWATER GREEN INFRASTRUCTURE TRAINING, 2) AIR QUALITY TRAINING, AND 3) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) AND ENVIRONMENTAL REGULATION TRAINING FOR 35 PARTICIPANTS PER YEAR OVER TWO YEARS (70 TOTAL) AND ADVANCED GREEN INFRASTRUCTURE TRAINING FOR 5 OF THOSE PARTICIPANTS PER YEAR OVER TWO YEARS (10 TOTAL), 3) ENGAGING 30 WORKFORCE DEVELOPMENT PROGRAM GRADUATES AND OTHER NEWARK RESIDENTS AS CITIZEN SCIENTISTS AND AIR QUALITY ADVOCATES TO MEASURE AIR QUALITY AND TEMPERATURE STRATEGICALLY DETERMINED ACROSS NEWARK, 4) ANALYZING, AT LEAST PARTIALLY WITH ARTIFICIAL INTELLIGENCE, AIR QUALITY AND TEMPERATURE DATA COLLECTED BY CITIZEN SCIENTIST, ACADEMIC RESEARCHERS AND SATELLITE TO PROVIDE AT LEAST ONE RECOMMENDATION ON MINIMIZING INDOOR AIR POLLUTION AND ONE MAP INDICATING PRIORITY HEAT SOURCES AND EXAMPLE OPTIONS FOR MITIGATION IN THE CITY OF NEWARK, AND 5) DEMONSTRATING FOR THE CITY OF NEWARK WITH AT LEAST TEN GREEN INFRASTRUCTURE MEASURES HOW TO DETERMINE THEIR AIR QUALITY IMPROVEMENTS USING THE I-TREE ECO ECOSYSTEM SERVICE MODEL SOFTWARE APPLICATION. SUBRECIPIENT:ALL PROJECT ACTIVITIES ARE SUBSTANTIALLY FACILITATED BY SUBAWARDS. THIS PROJECT COMPRISES FIVE MAJOR ACTIVITIES, INCLUDING: 1) CBO-LED COMMUNITY OUTREACH AND STAKEHOLDER ENGAGEMENTS TO INFORM RESIDENTS ABOUT THE ENVIRONMENTAL CHALLENGES IN NEWARK AND THE BENEFITS OF THE WORKFORCE DEVELOPMENT PROGRAM TO RECRUIT POTENTIAL PARTICIPANTS, 2) ACADEMIC INSTITUTION-LED WORKFORCE DEVELOPMENT PROGRAM COVERING 1) STORMWATER GREEN INFRASTRUCTURE (GI) TRAINING, 2) AIR QUALITY (AQ) TRAINING, AND 3) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) TRAINING FOR 50 PARTICIPANTS IN THE REGULAR COURSE AND 5 IN THE ADVANCE COURSE EVERY YEAR, 3) WORKFORCE DEVELOPMENT PARTICIPANT-LED AIR QUALITY (AND TEMPERATURE) MONITORING THAT WILL SUPPLEMENT THE LACKING CURRENT AIR MONITORING IN THE CITY OF NEWARK AND ENGAGE 30 SELECT PARTICIPANTS AS CITIZEN SCIENTISTS AND AIR QUALITY ADVOCATES BY PROVIDING THEM WITH PURPLE AIR SENSORS, INSTRUCTIONAL WORKSHOP TO USE THEM, AND A REQUIREMENew Jersey (EPA federal awards)CITY OF NEWARK$1.0M—