Idaho dam reservoir contracts
56 contracts tracked across 1 municipality.
Contracts
56
municipalities
1
Distinct vendors
42
municipalities with the most dam reservoir contracts
Top vendors in Idaho dam reservoir
| Vendor | Contracts | Volume |
|---|---|---|
| COUNTY OF POWER | 3 | $105K |
| PROTEC PEST CONTROL SERVICES LLC | 3 | $347K |
| BONNEVILLE COUNTY | 3 | $1.1M |
| NORTH SIDE CANAL COMPANY LTD | 2 | $248K |
| FALLS IRRIGATION DISTRICT | 2 | $4.0M |
| MDD CLEANING SERVICES LLC | 1 | $336K |
Recent dam reservoir contracts in Idaho
| Title | municipality | Vendor | Value | Solicitation |
|---|---|---|---|---|
| MINIDOKA DAM AND POWERPLANT JANITORIAL SERVICES | Idaho (Bureau of Reclamation federal awards) | MDD CLEANING SERVICES LLC | $336K | — |
| AMERICAN FALLS RESERVOIR LE - POWER CO. | Idaho (Bureau of Reclamation federal awards) | COUNTY OF POWER | $40K | — |
| WATER CONSERVATION AND DELIVERY EFFICIENCY IMPROVEMENTS BY ADDING SCADA SITES PROJECT ABSTRACTAWARD PURPOSE:WITH INFRASTRUCTURE THAT IS OVER 100 YEARS OLD AND THE EFFECTS OF CLIMATE CHANGE BEING FELT EVERY YEAR, NSCC HAS THE NEED TO CONSERVE WATER WHEREVER POSSIBLE. AN ANALYSIS PERFORMED BY CH2MHILL OF THE WATER DISTRIBUTION NETWORK DETERMINED THAT ONLY 50 OF THE WATER CONVEYED FROM MILNER DAM MAKES IT TO THE FARMS. NSCC PLANS TO RECAPTURE SOME OF THE LOST WATER BY IMPROVING WATER MANAGEMENT AND DELIVERY EFFICIENCY BY ADDING 33 STRATEGICALLY PLACED SUPERVISORY CONTROL AND DATA ACQUISITION SITES (SCADA) TO ITS CURRENT NETWORK OF 66 SITES. THIS ADDITION OF SCADA SITES IS EXPECTED TO RESULT IN AN ANNUAL WATER SAVINGS OF 30,856 ACRE-FEET. ACTIVITIES TO BE PERFORMED: THE RECIPIENT WILL INSTALL AUTOMATED GATE CONTROL AND FLOW MONITORING SCADA EQUIPMENT AT 15 CONTROL SITES AND 18 MONITORING SITES.EXPECTED DELIVERABLES OR OUTCOMES: THE ADDITION OF SCADA SITES IS EXPECTED TO RESULT IN AN ANNUAL WATER SAVINGS OF 30,856 ACRE-FEET.INTENDED BENEFICIARIES: THE WATER CONSERVATION AND DELIVERY EFFICIENCY IMPROVEMENTS BY ADDING SCADA SITES ACHIEVES THE PUBLIC PURPOSE OF THE ACT BY CONSERVING WATER AND IMPROVING WATER MANAGEMENT.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N A | Idaho (Bureau of Reclamation federal awards) | NORTH SIDE CANAL COMPANY LTD | $223K | — |
| HEATING, VENTILATION,&AIR CONDITIONING (HVAC) SYSTEM UPGRADE -- PALISADES DAM | Idaho (Bureau of Reclamation federal awards) | REAGENT WORLD, INC. | $492K | — |
| THE ENTERPRIZE CANAL COMPANY (COMPANY) IN RIRIE, IDAHO, WILL BUILD AN INDEPENDENT, PIPED CANAL SYSTEM TO DELIVER WATER TO ITS CUSTOMERS AND TO THREE GROUNDWATER RECHARGE FACILITIES. THIS PROJECT, ONCE IMPLEMENTED, WILL DELIVER A MULTITUDE OF BENEFITS TO INCREASE DROUGHT RESILIENCY BY INCREASING OPERATIONAL FLEXIBILITY, ENHANCING WATER RELIABILITY, AND PROVIDING THE CAPABILITY TO RECHARGE UP TO 4,706 ACRE-FEET WATER PER YEAR WITHIN THE EASTERN SNAKE PLAIN AQUIFER (ESPA). THIS RECHARGE WILL BENEFIT STREAM FLOWS AT THE AMERICAN FALLS RESERVOIR AND OTHER DOWNSTREAM WATER USERS. BY ENHANCING WATER SUPPLY RELIABILITY, THE COMPANY CAN RENT OR LEASE WATER SUPPLIES TO OTHER WATER USERS WHICH IS A KEY MECHANISM FOR DROUGHT MITIGATION. THIS PROJECT WILL DIRECTLY BENEFIT THE IDAHO WATER RESOURCES BOARDS INITIATIVE TO INCREASE WATER SUPPLIES IN THE ESPA AND SUPPORTS THE IDAHO DEPARTMENT OF WATER RESOURCES DROUGHT PLAN GOAL OF DEVELOPING INTERAGENCY AGREEMENTS TO HELP PLAN FOR AND MITIGATE THE IMPACTS OF DROUGHT. | Idaho (Bureau of Reclamation federal awards) | ENTERPRIZE CANAL COMPANY LTD. | $5.0M | — |
| THE FALLS IRRIGATION DISTRICT, LOCATED IN AMERICAN FALLS, WILL AUTOMATE A 3,700-HORSEPOWER PUMP STATION BY ADDING AN INDUSTRIAL CONTROL PANEL VARIABLE SPEED MOTORS, PUMPS AND DRIVES FLOWMETERS AND A SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM. CURRENTLY, THE PUMP STATION RUNS AT A CONSTANT SPEED, RESULTING IN OVER-PUMPING AND CONVEYANCE SPILLS. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 1,684 ACRE-FEET BY ENABLING THE DISTRICT TO MATCH SUPPLY AND DEMAND. CONSERVED WATER WILL BE STORED IN THE AMERICAN FALLS RESERVOIR, HELPING TO MAINTAIN HIGHER WATER LEVELS AND COLDER TEMPERATURES, AND WILL OFFSET THE NEED TO PUMP GROUNDWATER. | Idaho (Bureau of Reclamation federal awards) | FALLS IRRIGATION DISTRICT | $3.7M | — |
| TETON DAM 50TH COMMEMORATION OVERLOOK PROJECT | Idaho (Bureau of Reclamation federal awards) | GUARDIAN CONSTRUCTION, INC. | $1.7M | — |
| WHEEL LOADERS FOR PALISADES DAM AND ANDERSON RANCH DAM. | Idaho (Bureau of Reclamation federal awards) | FEDERAL CONTRACTS LLC | $525K | — |
| BUSHINGS SUPPLY FOR ANDERSON RANCH DAM | Idaho (Bureau of Reclamation federal awards) | POWER ASSET RECOVERY CORPORATION | $295K | — |
| JANITORIAL SERVICES, SNAKE RIVER AREA OFFICE, UPPER SNAKE FIELD OFFICE, PALISADES DAM, IRWIN, IDAHO. | Idaho (Bureau of Reclamation federal awards) | PAVLAT BETHANY S | $260K | — |
| AWARD OF SNAKE RIVER AREA OFFICE NOXIOUS WEED CONTROL FOR PALISADES DAM AND RIRIE DAM, BONNEVILLE COUNTY, IDAHO | Idaho (Bureau of Reclamation federal awards) | PROTEC PEST CONTROL SERVICES LLC | $197K | — |
| JANITORIAL SERVICES MINIDOKA DAM AND POWERPLANT, RUPERT, IDAHO. PERIOD OF PERFORMANCE INCLUDES A BASE YEAR PERIOD AND FOUR (4) OPTION YEAR PERIODS. | Idaho (Bureau of Reclamation federal awards) | ECO-FRIENDLY CLEANING SPECIALIST, LLC | $127K | — |
| AWARD OF SNAKE RIVER AREA OFFICE NOXIOUS WEED CONTROL MINIDOKA DAM AND AMERICAN FALLS DAM | Idaho (Bureau of Reclamation federal awards) | HIGH COUNTRY WEED CONTROL LLC | $103K | — |
| BONNEVILLE COUNTY LAW ENFORCEMENT FOR RIRIE DAM | Idaho (Bureau of Reclamation federal awards) | BONNEVILLE COUNTY ID | $102K | — |
| LIDAR OF PALISADES RESERVOIR | Idaho (Bureau of Reclamation federal awards) | DJ&A, P.C. | $82K | — |
| PURCHASE PEST CONTROL SERVICES TO INCLUDE SPIDERS, FLYING/STINGING INSECTS (EXCLUDING HONEYBEES), ANTS, VENOMOUS SNAKES, RACOONS, GROUND SQUIRRELS, PACK RATS, AND MICE FOR MINIDOKA DAM. | Idaho (Bureau of Reclamation federal awards) | PROTEC PEST CONTROL SERVICES LLC | $79K | — |
| PROVIDE PEST CONTROL SERVICES FOR PALISADES DAM | Idaho (Bureau of Reclamation federal awards) | PROTEC PEST CONTROL SERVICES LLC | $71K | — |
| GARBAGE DISPOSAL SERVICES FOR BLACK CANYON DAM PARKS | Idaho (Bureau of Reclamation federal awards) | ALLIED WASTE SERVICES OF NORTH AMERICA, LLC | $70K | — |
| ANDERSON RANCH DAM UTV | Idaho (Bureau of Reclamation federal awards) | AMIGO IMPLEMENT COMPANY, INC. | $37K | — |
| EO14398- MIN AND PAL DAM PEST CONTROL | Idaho (Bureau of Reclamation federal awards) | BECOME THE BAG, LLC | $30K | — |
| RENT ONE EXCAVATOR WITH A THUMB ATTACHMENT, ONE ARTICULATED ROCK TRUCK, ONE WHEEL LOADER, AND ONE 2000 GALLON WATER TRUCK FOR DELIVER TO THE WILLOW BAY MARINA AT THE AMERICAN FALLS RESERVOIR, IDAHO FOR THE RENTAL PERIOD 18 NOVEMBER TO 27 NOVEMBER 202 | Idaho (Bureau of Reclamation federal awards) | WHEELER MACHINERY CO | $28K | — |
| MINIDOKA DAM SEWAGE LAGOON SEEPAGE TESTS | Idaho (Bureau of Reclamation federal awards) | ATLAS TECHNICAL CONSULTANTS LLC | $12K | — |
| ANDERSON RANCH DAM RAISE DESIGN POWERLINE RELOCATION | Idaho (Bureau of Reclamation federal awards) | IDAHO POWER COMPANY | $9K | — |
| BLACK CANYON DAM C-LINE EMERGENCY CROSS ARM REPAIR | Idaho (Bureau of Reclamation federal awards) | INTERNATIONAL LINE BUILDERS, INC. | $9K | — |
| LAW ENFORCEMENT PATROL SERVICES, SNAKE RIVER AREA OFFICE, UPPER SNAKE FIELD OFFICE, AMERICAN FALLS RESERVOIR, POWER COUNTY, IDAHO | Idaho (Bureau of Reclamation federal awards) | COUNTY OF POWER | $724 | — |
| AWARD PURPOSE: BOISE PROJECT BOARD OF CONTROLS (BPBC) PHASE 10 OF NEW YORK CANAL (NYC) LINING WILL REPLACE 5,230 LINEAR FEET (1 MILE) OF CANAL LINING IN THE NEW YORK CANAL TO INCREASE WATER CONSERVATION AND WATER-USE EFFICIENCY AND RELIABILITY BY REDUCING SEEPAGE LOSSES.ACTIVITIES TO BE PERFORMED: NYC LINING PHASE 10: FROM STATION 175 00 TO STATION 228 00 THE CROSS-SECTIONAL WIDTH OF THE NEW YORK CANAL IS APPROXIMATELY 60 FEET WIDE. THE EXISTING FLOORING IS CONCRETE THAT TRANSITIONS INTO UNLINED, EARTHEN FLOORING. THE NORTH AND SOUTH WALLS OF THE CANAL CONSIST OF A MIX OF CONCRETE AND OR ASPHALT. THE ASPHALT AND CONCRETE ON THE FLOORING WILL BE REMOVED ALONG WITH TWO FEET OF DIRT. ONE FOOT OF FILL MATERIAL WILL BE COMPACTED INTO THE FLOOR AND SIDES. THE GEOCOMPOSITE MEMBRANE CANAL LINER WILL BE INSTALLED AND LATERALLY SEAMED EVERY 25 FEET AND ADHERED TOGETHER WITH A SPECIALIZED ADHESIVE MADE ESPECIALLY BY THE MAKERS OF THE LINING. SIX INCHES OF CONCRETE WITH RANCH PANELS ON THE SIDES AND 4 REBAR ON THE FLOORING IS THEN LAYERED ON TOP OF THE MEMBRANE.EXPECTED DELIVERABLES OR OUTCOMES: POST-PROJECT SEEPAGE LOSSES ARE EXPECTED TO BE MINIMAL. AFTER INSTALLATION SEEPAGE WILL BE MINIMAL ALLOWING FOR THE 4,047 ACRE-FEET PER YEAR WILL REMAIN IN THE RESERVOIR SYSTEM UNTIL IT IS TO BE USED FOR ITS INTENDED PURPOSE, IRRIGATION OF CROPS AND LANDSCAPING, WITH THE ABILITY TO GENERATE POWER. ACCORDING TO THE STUDY PERFORMED BY THE BUREAU OF RECLAMATION AND THEIR REPORT TITLED INTENDED BENEFICIARIES: WITH THE WATER IN THE CANALS AND NOT SEEPED INTO THE GROUND, BPBC IS ABLE TO DELIVER IRRIGATION WATER TO USERS AND GENERATE 4 KILOWATTS OF POWER WITH THE TWO LOW-HYDRO POWER PLANTS AND LESS WATER NEEDS TO BE DIVERTED INTO THE NEW YORK CANAL AND ALLOWS THIS PRECIOUS COMMODITY TO STAY IN THE RESERVOIRS LONGER WHICH WILL BENEFIT THE PRODUCTION OF POWER THROUGH ARROWROCK POWERPLANT AND THE WATER WILL BE STORED FOR FUTURE USE ESPECIALLY IF THE DROUGHT CONTINUES AS FORECASTED BY NOAA AND CONTRIBUTE TO THE SURVIVAL OF THE THREATENED BULL TROUT, ALONG WITH THE OTHER SPECIES OF FISH IN THE RESERVOIRS.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N A | Idaho (Bureau of Reclamation federal awards) | BOISE PROJECT BOARD OF CONTROL | $3.6M | — |
| THE HENRYS FORK FOUNDATION (HFF), A NON-PROFIT WATERSHED CONSERVATION ORGANIZATION, WILL PARTNER WITH IDAHO DEPARTMENT OF FISH AND GAME (IDFG) TO DEVELOP A WATER QUALITY BASIN PLAN ACROSS MULTIPLE SUBBASINS OF THE HENRYS FORK WATERSHED IN IDAHO AND WYOMING. PERVASIVE DROUGHT AND CLIMATE CHANGE, COUPLED WITH RAPIDLY AGING INFRASTRUCTURE AND A GROWING POPULATION, HAVE INCREASED AVERAGE WATER TEMPERATURES, REDUCED SPRING-FED THERMAL REFUGIA, AND CAUSED IMPAIRMENTS INCLUDING HIGH DISSOLVED OXYGEN CONCENTRATIONS AND HARMFUL ALGAE BLOOMS WITHIN THE ISLAND PARK RESERVOIR AND THE HENRYS FORK RIVER. THIS OVERALL POOR WATER QUALITY HAS HARMED LOCAL FISH AND WILDLIFE POPULATIONS, AQUATIC MACROINVERTEBRATE COMMUNITY HEALTH, AND THE RECREATIONAL FISHING EXPERIENCE. THE WATER QUALITY BASIN PLAN WILL ASSESS A SUITE OF NATURE- AND EVIDENCE-BASED PROJECT DESIGNS TO RESTORE WATER QUALITY BUILD RESILIENCE TO DROUGHT, CLIMATE CHANGE, AGING INFRASTRUCTURE, AND HUMAN POPULATION GROWTH AND THEREBY PROTECT REGIONAL FISH, WILDLIFE, AND AQUATIC HABITAT AND ASSOCIATED ECONOMIC RESOURCES. THE PLAN WILL INFORM THE DEVELOPMENT OF 60% PROJECT DESIGNS THAT ADDRESS AGING FACILITIES WITH NEW OR RETROFIT INFRASTRUCTURE IN ISLAND PARK RESERVOIR, AND RESTORE DEGRADED TRIBUTARIES WITH WATERSHED-SCALE, NATURE-BASED STREAM, WETLAND, AND AQUIFER RESTORATION PROJECTS. PROJECTS WILL BE PRIORITIZED FOR IMPLEMENTATION AFTER COLLABORATIVE EVALUATION, DATA COLLECTION, AND STAKEHOLDER OUTREACH IN PARTNERSHIP WITH LOCAL, STATE, AND FEDERAL AGENCIES. | Idaho (Bureau of Reclamation federal awards) | HENRY'S FORK FOUNDATION, INC | $1.1M | — |
| AWARD PURPOSE: UNDER THIS AGREEMENT BONNEVILLE COUNTY PARKS WILL CONTINUE TO OPERATE ANDMAINTAIN RIRIE RESERVOIR RECREATION AREAS FOR PUBLIC USE AT BLACKTAIL PARK AND JUNIPER CAMPGROUND, AS WELL AT BOAT-ACCESS ONLY PARKS BENCHLAND PARK AND WILLOW POINT PARK. ACTIVITIES TO BE PERFORMED: MAINTENANCE IMPROVEMENTS TO BOAT DOCKS, TRASH COLLECTION, LANDSCAPING, PARKING LOT MAINTENANCE, CAMPGROUND MAINTENANCE, AND MISCELLANEOUS MAINTENANCE NEEDS AND SERVICES. INCLUDING LAGOON REPAIR, LANDSCAPING WITH ADDITIONAL DOCKS AND PAVING. RE-LINING OF SEWAGE LAGOONS TO MEET IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY STANDARDS, WHERE ALL SEWAGE LAGOONS MUST BE LINED TO AVOID WASTEWATER SEEPAGE. SEWAGE LAGOONS WERE INSTALLED BY RECLAMATION PRIOR TO DEPARTMENT OF ENVIRONMENTAL QUALITYS EXISTENCE.EXPECTED DELIVERABLES OR OUTCOMES: GENERAL MAINTENANCE: GROUNDS, SPRINKLERS, BUILDING, AUTO AND EQUIPMENT. MAINTENANCE ON PARKS, ROADS, BUILDING AND TRAILS, TO PROVIDE SAFE, UNIVERSAL ACCESS, AND ATTRACTIVE FACILITIES TO PROVIDE HIGH QUALITY RECREATION OPPORTUNITIES AND EXPERIENCE.INTENDED BENEFICIARIES: RECREATIONALISTS WHO WANTS TO HAVE A SAFE, CLEAN, CARED FOR RECREATION AREA. RIRIE RESERVOIR SERVES PEOPLE FROM ALL OVER THE COUNTY, AS WELL AS LOCAL RV USERS AND BOATERS.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N A | Idaho (Bureau of Reclamation federal awards) | BONNEVILLE COUNTY | $963K | — |
| THE PURPOSE OF THE PROJECT THE ALTA HARRIS CREEK BOISE RIVER SIDE CHANNEL PROJECT (PROJECT) WILL IMPROVE AQUATIC HABITAT IN THE BOISE RIVER BY RESTORING SPAWNING AND REARING HABITAT FOR SALMONID FISHES AND PROVIDE FISH PASSAGE CONNECTING THE LOWER BOISE RIVER TO BARBER POOL. THE PROJECT ENTAILS THE CONSTRUCTION OF 1,600 FEET (ABOUT 487.68 M) OF SIDE CHANNEL AND A FISH PASSAGE FACILITY SOURCING WATER FROM BARBER POOL. THE ACTIVITIES TO BE PERFORMED APPROXIMATELY 450 FEET OF THE CHANNEL WOULD BE A CLEAN OUT OF AN EXISTING BACK CHANNEL AN ADDITIONAL REMAINING 450 FEET WOULD BE EXCAVATED ON LAND A PORTION OF THE EMBANKMENT WILL BE EXCAVATED AND A FISHWAY WITH A WATER CONTROL HEAD GATE AND A TRASH RACK WILL BE CONSTRUCTED ON THE UPSTREAM SIDE DOWNSTREAM OF BARBER POOL A BOX CULVERT WILL BE INSTALLED, SUFFICIENT TO HANDLE VEHICLES ON LYSTED ROAD, AN UNPAVED DRIVEWAY TO THE BARBER DAM POWERHOUSE APPROXIMATELY 700 FEET OF THE CHANNEL WILL BE NATURE-LIKE AND CONNECT TO THE EXISTING ALTA HARRIS CREEK SIDE CHANNEL. IN THIS SECTION WE WILL INCLUDE A SERIES OF POOLS AND STEPS FEATURING LARGER ROCKS, WOOD AND BOULDERS AND THESE HABITAT FEATURES WILL ALLOW FOR RESTING AREAS FOR FISH THAT MAY BE MIGRATING UPSTREAM IN THIS SECTION BECAUSE IT WILL BE HIGHER GRADIENT THAN ANY OTHER PORTION OF THE SIDE CHANNEL MONITOR THE PROJECT DURING AND AFTER CONSTRUCTION IS COMPLETE AND WATER IS FLOWING IN THE CHANNEL. THE EXPECTED DELIVERABLES OR OUTCOMES THE EXPECTED DELIVERABLES FROM THE PROJECT INCLUDE THE FOLLOWING BENEFITS TO THE BOISE RIVER CORRIDOR: RECONNECT 2.5 MILES (ABOUT 4 KM) OF MAIN BOISE RIVER HABITAT FOR AQUATIC SPECIES AND MORE THAN ONE MILE (ABOUT 1.6 KM) OF SIDE CHANNEL HABITAT FOR SPAWNING AND REARING OF YOUNG OF YEAR FISH, AND AN ASSOCIATED RIPARIAN AREA ON APPROXIMATELY FIVE ACRES PROVIDE AN EXTRA OUTLET FROM BARBER DAM THAT WILL PROVIDE ASSURANCE OF FLOWS TO THE LOWER BOISE RIVER WHEN HYDROPOWER OPERATIONS ARE INTERRUPTED AND IN TURN DISRUPT RIVER FLOWS THAT BENEFITS IRRIGATORS AND WATER USERS RIPARIAN COVER OF THE SIDE CHANNEL WILL HELP MODERATE HIGHER TEMPERATURES THAT OCCUR FROM SOLAR EXPOSURE DURING SUMMER MONTHS A HALF MILE (ABOUT 0.8 KM) OF BOISE RIVER WHERE RISK OF FISH ENTRAINMENT INTO AN IRRIGATION CANAL WILL BE BYPASSED BY THE SIDE CHANNEL RUSSIAN OLIVE TREES (INVASIVE) WILL BE REMOVED AND REPLACED WITH WILLOW AND COTTONWOOD PLANTINGS (NATIVE) CONSTRUCT A VIEWING AREA OF THE SIDE CHANNEL STREAM WITH INTERPRETIVE SIGNS. THE INTENDED BENEFICIARIES WHILE SOME BENEFICIARIES MAY BE OBVIOUS, LIKE AQUATIC SPECIES AND WILDLIFE IN OUR RIVER RESTORATION AND FISH PASSAGE PROJECT, OTHER BENEFICIARIES INCLUDE RECREATIONALISTS, WATER USERS AND IRRIGATORS FROM THE AGRICULTURAL SECTOR, AND OTHER STAKEHOLDERS INVESTED IN THE BOISE RIVER THROUGHOUT A MULTITUDE OF DISCIPLINES, OUTLINED IN MULTIPLE PLANNING DOCUMENTS FOUND THROUGHOUT OUR APPLICATION. ANY SUBRECIPIENT ACTIVITIES, IF KNOWN. THIS PROJECT WILL BE AWARDED TO AND MANAGED BY TROUT UNLIMITED THERE WILL NOT BE ANY SUBRECIPIENT ACTIVITIES. | Idaho (Bureau of Reclamation federal awards) | TROUT UNLIMITED, INC. | $734K | — |
| AWARD PURPOSE: TO IMPROVE WATERSHED HEALTH ACROSS THREE SITES TO ENHANCE OVER 10,000 FEET OF STREAM FOR JUVENILE STEELHEAD HABITAT.ACTIVITIES TO BE PERFORMED: THE NEZ PERCE SOIL AND WATER CONSERVATION DISTRICT HAS THREE SITES THAT WILL IMPROVE WATERSHED HEALTH. MAJOR COMPONENTS OF THE PROJECT WILL INCLUDE:SITE 1: INSTALL APPROXIMATELY 21 SMALL WOOD STRUCTURES (E.G., BEAVER DAM ANALOGS) IN MILL CREEKSITE 2: INSTALL APPROXIMATELY 25 SMALL WOOD STRUCTURES, REPLACE A CULVERT, COMPLETE 48 ACRES OF FOREST THINNING IN THE HEADWATERS OF SWEETWATER CREEKSITE 3: INSTALL APPROXIMATELY 62 SMALL WOOD STRUCTURES IN MISSION CREEK AND COMPLETE 81 ACRES OF FOREST THINNING ON ADJACENT PRIVATE LAND.EXPECTED DELIVERABLES OR OUTCOMES: COLLECTING BASELINE HABITAT QUALITY DATA, IMPROVE WATERSHED HEALTH, HABITAT IMPROVEMENTS FOR JUVENILE STEELHEAD HABITAT, BEAVERS, AND FOREST THINNING.INTENDED BENEFICIARIES: ANYONE DEALING WITH WATERSHED IMPROVEMENT, FISH HABITAT, AND FISHERY CONSERVATION MANAGEMENT.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): NA | Idaho (Bureau of Reclamation federal awards) | NEZ PERCE SOIL AND WATER CONSERVATION DISTRICT | $452K | — |
| SPORTSMAN S PARK OAND M PROJECT ABSTRACTAWARD PURPOSE SPORTSMAN S PARK IS LOCATED THREE MILES EAST OF ABERDEEN, IDAHO IN BINGHAM COUNTY THE PARK IS A MULTI USE AREA WITH FACILITIES AND ACTIVITIES FOR A VARIETY OF RECREATIONAL USES WHICH INCLUDE TWO LARGE GROUP SHELTERS AND EIGHT SMALLER PICNIC SHELTERS, TWO PLAYGROUNDS, THREE RESTROOMS, HORSESHOE PITS AND VOLLEYBALL COURTS, 23 SITES WITH ELECTRIC AND WATER, 5 SITES WITH ELECTRIC ONLY AND 8 TENT SITES, AND A RV DUMP STATION IS AVAILABLE THERE IS A PAVED HIKING BICYCLE TRAIL ALONG THE RIM OF THE RESERVOIR THE TRAILHEAD IS AT THE PARK AND IS 1 1 MILES LONG SPECIAL FEATURES ARE TWO OBSERVATION PLATFORMS WITH A PAVILION AND BENCHES FOR USERS TO OBSERVE THE WATERFOWL SITUATED ADJACENT TO THE AMERICAN FALLS RESERVOIR, IT PROVIDES PRIMARY ACCESS TO THE LAKE FOR BOATERS AND FISHERMEN WITH TWO BOAT RAMPS THE PARK IS ALSO A POPULAR SPOT FOR ICE FISHERMEN IN THE WINTER ACTIVITIES TO BE PERFORMED INCLUDE DAY TO DAY CAMPGROUND DUTIES, INCLUDING CLEANING OF BATHROOMS, TAKING RESERVATIONS, CHECKING IN GUESTS, COLLECTING AND VERIFYING PAYMENT, EDUCATING VISITORS ON PARK RULES, MAINTAINING SECURITY, MOWING, PEST CONTROL, AND GENERAL UPKEEP EXPECTED DELIVERABLES OR OUTCOMES FUNDING FOR THIS PROJECT WILL ALLOW THE RECIPIENT TO CONTINUE PROVIDING A SAFE, CLEAN, CARED FOR RECREATIONAL AREA FOR THE PUBLIC THE WORK FOR THIS PROJECT WILL OCCUR ONCE THE FUNDS ARE AUTHORIZED WITH A COMPLETION DATE OF SEPTEMBER 30, 2027 INTENDED BENEFICIARIES CONTINUED OAND M OF SPORTSMAN S PARK IS IMPERATIVE FOR PUBLIC ACCESS AND HEALTH AND SAFETY AT THE AMERICAN FALLS RESERVOIR, A FEDERAL WATER PROJECT THE BENEFITS OF OUTDOOR RECREATION TO MENTAL AND PHYSICAL WELLBEING FOR THE INDIVIDUAL AND SOCIETY ARE WITHOUT END THE OUTDOORS PROVIDES EDUCATIONAL VENUE AND CREATIVE INSPIRATION PROVIDING SAFE ACCESS TO RECREATION CONTRIBUTES TO FULFILLMENT OF RECLAMATION S OBLIGATION AND MISSION SUBRECIPIENT ACTIVITIES IF KNOWN OR SPECIFIED AT TIME OF AWARD N A | Idaho (Bureau of Reclamation federal awards) | BINGHAM COUNTY | $325K | — |
| THE FALLS IRRIGATION DISTRICT (DISTRICT), LOCATED IN AMERICAN FALLS, IDAHO, PROVIDES IRRIGATION WATER TO 12,621 ACRES IN A SINGLE IRRIGATION SEASON. THE MAJORITY OF THE DISTRICT IS SERVED BY THE GRAVITY CANAL SYSTEM FROM THE SNAKE RIVER. DURING YEARS OF DROUGHT, THE SURFACE WATER PUMPING PLANT IS UNABLE TO MEET THE NEEDS OF WATER USERS LATE IN THE IRRIGATION SEASON DUE TO LOSS OF HEAD IN AMERICAN FALLS RESERVOIR. TO SECURE A RELIABLE WATER SUPPLY FOR LATE SEASON DELIVERIES, THE DISTRICT HAS SECURED THE WATER RIGHTS FROM THE IDAHO DEPARTMENT OF WATER RESOURCES TO DRILL THREE WELLS TO PUMP WATER FROM THE SNAKE RIVER PLAIN AQUIFER INTO THE DISTRICTS EXISTING CANAL DISTRIBUTION SYSTEM. THE THREE ADDITIONAL WELLS THAT WILL BE CONSTRUCTED AS A RESULT OF THIS PROJECT WILL PROVIDE THE DISTRICT UP TO AN ADDITIONAL 1,873 ACRE-FEET OF SUPPLEMENTAL SUPPLY IN TIMES OF DROUGHT. THIS PROJECT IS PART OF THE DISTRICTS DEVELOPMENT ACTIONS TO RESPOND DROUGHT DECLARATIONS AND UTILIZE GROUNDWATER SUPPLIES WHEN SURFACE WATER SUPPLIES ARE MORE AVAILABLE. | Idaho (Bureau of Reclamation federal awards) | FALLS IRRIGATION DISTRICT | $325K | — |
| PORTNEUF WATERSHED PARTNERSHIP, IN PARTNERSHIP WITH THE CITY OF POCATELLO, LOCATED IN SOUTHERN IDAHO, WILL BUILD ON EXISTING WATERSHED PLANS AND STAKEHOLDER ENGAGEMENT ACTIVITIES IN THE PORTNEUF RIVER WATERSHED. THE PORTNEUF RIVER FLOWS FROM ITS HEADWATERS ON THE FORT HALL INDIAN RESERVATION OF THE SHOSHONE-BANNOCK TRIBES ACROSS NON-RESERVATION LAND BEFORE IT RETURNS TO THE RESERVATION WHERE IT DISCHARGES INTO THE SNAKE RIVER AT THE U.S. BUREAU OF RECLAMATIONS AMERICAN FALLS DAM. THE PARTNERSHIP WILL EXPAND OUTREACH EFFORTS, WITH A SPECIFIC FOCUS ON ENGAGING IRRIGATORS AND RANCHERS AND THE SHOSHONE-BANNOCK TRIBES, EXPAND AND UPDATE THEIR EXISTING WATERSHED RESTORATION PLAN, AND DEVELOP A PREDICTIVE STREAM FLOW MODEL REPRESENTING THE WATERSHED. THE PLANNING EFFORT WILL ADDRESS RESOURCE CONCERNS IN THE WATERSHED, INCLUDING WATER SUPPLY ISSUES RELATED TO DROUGHT AND OVERCONSUMPTION OF SURFACE WATER, WATER QUALITY CONCERNS RELATED TO AGRICULTURAL RUN-OFF, AND ECOSYSTEM HEALTH THREATS CAUSED BY HIGH SUMMER WATER TEMPERATURES AND HIGH SEDIMENT LEVELS. | Idaho (Bureau of Reclamation federal awards) | CITY OF POCATELLO | $300K | — |
| THE SALMON RIVER CANAL COMPANY (COMPANY), LOCATED IN TWIN FALLS COUNTY, IDAHO, WILL PIPE 9,790 LINEAR FEET OF AN EARTHEN CANAL AND REPLACE TEN ELECTRIC POWER PUMPS WITH A GRAVITY PRESSURE SYSTEM FOR IRRIGATION. THE PROJECT IS EXPECTED TO RESULT IN ANNUAL WATER SAVINGS OF 540 ACRE-FEET, CURRENTLY LOST TO EVAPORATION AND SEEPAGE AND WILL INCREASE THE ENERGY EFFICIENCY OF THE IRRIGATION SYSTEM. THESE EFFICIENCIES WILL DECREASE DEMAND ON THE UPSTREAM SALMON FALLS DAM, SUPPORTING RECREATION AND FISH POPULATIONS IN THE AREA. THE PROJECT WILL ALSO BENEFIT FARMERS BY ALLOWING THE COMPANY TO DELIVER WATER LATER IN THE GROWING SEASON, WHICH IS CRITICAL DURING INCREASINGLY FREQUENT AND LONGER DRY YEARS IN SOUTHERN IDAHO. | Idaho (Bureau of Reclamation federal awards) | SALMON RIVER CANAL CO LTD | $250K | — |
| AWARD PURPOSE: THE LITTLEWOOD RESERVOIR RECREATION AREA IS LOCATED APPROXIMATELY 10 MILES NORTH OF CAREY, IDAHO IN BLAINE COUNTY. THE DAM WAS CONSTRUCTED BY THE BUREAU OF RECLAMATION (RECLAMATION) FROM 1936-1939 AND IS NOW OPERATED AND MAINTAINED BY THE LITTLE WOOD RIVER IRRIGATION DISTRICT. THE DAM IMPOUNDS APPROXIMATELY 600 SURFACE ACRES OF WATER WITH STREAMFLOW BELOW THE DAM UNTIL REACHING THE DIVERSION DAM A COUPLE OF MILES DOWNSTREAM. STARTING DOWNSTREAM OF THE DAM IS A POPULAR DISPERSED RECREATION AREA THAT THE PUBLIC ENJOYS CAMPING AND FISHING ALONG THE RIVER. ACTIVITIES TO BE PERFORMED: ACTIVITIES TO BE PERFORMED INCLUDE:MAINTENANCE AND OR IMPROVING THE BOAT DOCKS, TRASH COLLECTION, LANDSCAPE MOWING AND TRIMMING, WEED AND PEST CONTROL, SHORELINE CLEAN UP, CLEANING SUPPLIES, MINOR FACILITY REPAIR, REPAIR REPLACEMENT OF PICNIC TABLES FIRE GRILLS, ROAD, TRAIL AND PARKING LOT MAINTENANCE (SWEEPING, PAINTING, SNOW REMOVAL, ETC.), CAMPGROUND MAINTENANCE, SPRINKLER REPAIRS, TOOL AND SMALL EQUIPMENT REPAIR AND REPLACEMENT, AND MISCELLANEOUS SERVICES NEEDED ACCORDING TO THE MANAGEMENT AGREEMENT TERMS AND CONDITIONS.PROVIDE SAFE, UNIVERSAL ACCESS, AND ATTRACTIVE FACILITIES IN ORDER TO PROVIDE HIGH QUALITY RECREATION OPPORTUNITIES AND EXPERIENCE.EXPECTED DELIVERABLES OR OUTCOMES: THE EXPECTED DELIVERABLES AND OUTCOMES WILL PROVIDE A SAFE RECREATIONAL AREA FOR THE PUBLIC. INTENDED BENEFICIARIES: THE PUBLIC PURPOSE OF THIS AGREEMENT IS TO PROVIDE A SAFE RECREATION AREA FOR THE PUBLIC TO UTILIZE AT THE LITTLEWOOD RESERVOIR RECREATION AREA AND HIGH 5. THIS AGREEMENT WILL ENSURE THAT THE FACILITIES ARE MAINTAINED AND PROVIDE A SAFE ENVIRONMENT FOR RECREATIONAL USE FOR THE PUBLIC.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N A | Idaho (Bureau of Reclamation federal awards) | CITY OF CAREY WATER & SEWER | $184K | — |
| THIS RESEARCH WILL UTILIZE NUMERICAL MODELING AND CONDUCT VARIOUS EXPERIMENTS TO UNDERSTAND FLOW FIELDS AROUND BEDROCK BLOCKS IN RIVERS. EROSION OF UNLINED SPILLWAYS CAN POSE HUGE RISKS FOR DAM SAFETY, WHERE EROSION CAN PROPAGATE UPSTREAM AND PUT THE RESERVOIR AT RISK OF BREACH. CURRENT SPILLWAY EROSION MODELS WORK RELATIVELY WELL FOR COHESIVE ROCK OR SOIL-COVERED UNLINED SPILLWAYS, BUT THEIR CAPABILITIES BREAK DOWN IN SCENARIOS WITH HIGHLY FRACTURED ROCK WHERE THE PRIMARY EROSIONAL MECHANISM IS BY PLUCKING. IN CONTRAST, THE HURST 1D EROSION MODEL (H1DE MODEL) IS A ONE-DIMENSIONAL NUMERICAL MODEL THAT CAN INCORPORATE THE DETAILED MECHANICS OF BLOCK PLUCKING THAT WILL BE EXPLORED HERE. REGENTS OF THE UNIVERSITY OF IDAHO WILL INVESTIGATE THE MECHANICS OF BLOCK PLUCKING USING LABORATORY EXPERIMENTS BY VARYING FLOW CHARACTERISTICS, BLOCK GEOMETRY, BED ROUGHNESS, AND FRACTURE CONDITIONS. THE DETAILED TIME VARYING FORCES AND PRESSURES ON BLOCKS DUE TO TURBULENCE WILL BE MEASURED, WHICH IS LIKELY A PRIMARY CAUSE OF BLOCK PLUCKING. IN COLLABORATION WITH UNITED STATES BUREAU OF RECLAMATION (USBR), WHO WILL BE CONDUCTING COMPUTATIONAL FLUID DYNAMICS (CFD) SIMULATIONS, WE WILL USE THE EXPERIMENTS AND CFD MODELING TO EXPLORE A WIDE RANGE OF BLOCK ARRANGEMENT AND FLOW SCENARIOS. WE WILL USE THE DATA TO INFORM MODELS OF SPILLWAY AND BEDROCK RIVER EROSION TO POTENTIALLY GENERATE BETTER PREDICTIONS OF EROSION BY PLUCKING. A MORE ROBUST EROSION MODEL FOR UNLINED SPILLWAYS COULD CURRENTLY BE APPLIED TO 150 INTERAGENCY DAMS (UNITED STATES BUREAU OF RECLAMATION (USBR), BUREAU OF INDIAN AFFAIRS (BIA), NATIONAL PARK SERVICE (NPS), UNITED STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE (USFS) AND BUREAU OF LAND MANAGEMENT (BLM) TO BETTER UNDERSTAND THE CURRENT EROSION RISK AND TO BETTER PLAN FOR FUTURE INFRASTRUCTURE. | Idaho (Bureau of Reclamation federal awards) | REGENTS OF THE UNIVERSITY OF IDAHO | $148K | — |
| WATER STORAGE TANK RE-COATING PROJECT ABSTRACTAWARD PURPOSE: THE SHOSHONE-BANNOCK TRIBES COMMUNITY WATER SYSTEM SERVES AN AREA OF 28.4 SQUARE MILES AND SERVES RESIDENTIAL, COMMERCIAL, AND INSTITUTIONAL CUSTOMERS WITH A COMBINED 1,108 EQUIVALENT DWELLING UNITS. AN INSPECTION HAS IDENTIFIED THAT THE STORAGE STRUCTURES WERE MOSTLY IN GOOD CONDITION, HOWEVER THEY ALL HAD SOME LEVEL OF CORROSION FROM COATING FAILURE. DUE TO THIS, THE TRIBE HAS IDENTIFIED THE NEED TO COMPLETE THE BLAST AND PAINT FOR THE INTERIOR/EXTERIOR OF THE SHEEPSKIN RESERVOIR.ACTIVITIES TO BE PERFORMED:UTILIZE AN APPROPRIATELY LICENSED AND QUALIFIED CONTRACTOR TO COMPLETE THE WATER STORAGE TANK RE-COATING. THE CONTRACTOR WILL BLAST AND PAINT THE INTERIOR/EXTERIOR OF THE SHEEPSKIN RESERVOIR.EXPECTED DELIVERABLES OR OUTCOMES:THIS PROJECT WILL RE-COAT THE SHEEPSKIN RESERVOIR STRUCTURE. THIS WORK WOULD BE CARRIED OUT DURING JULY OF 2022 WITH A COMPLETION DATE OF OCTOBER OF 2022.INTENDED BENEFICIARIES:THIS PROJECT WILL BENEFIT THE TRIBES BY ACTING TO INCREASE THE RELIABILITY OF THE COMMUNITY WATER SYSTEM. THE PROJECT WILL EXTEND THE LIFE AND AID IN PROVIDING FULL AND UNINTERRUPTED FUNCTIONING OF THE WATER DELIVERY SYSTEM. IN ADDITION, TAKING CARE OF THESE REFURBISHMENTS NOW WILL FREE UP THE TRIBES IN THE FUTURE TO USE THEIR CAPACITY FOR OTHER FURTHER DEVELOPMENT IN THE COMMUNITY WATER SYSTEM TO ADDRESS POPULATION GROWTH AND POTENTIAL DROUGHT IMPACTS.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD):N/A | Idaho (Bureau of Reclamation federal awards) | SHOSHONE BANNOCK TRIBES | $140K | — |
| FREMONT MADISON IRRIGATION DISTRICT (DISTRICT), LOCATED IN EASTERN IDAHO, WILL AUTOMATE SIX WATER CONTROL STRUCTURES AND INSTALL REMOTE OPERATION AND DATA COLLECTION EQUIPMENT. WITH THE INSTALLATION OF AUTOMATED GATES, THE DISTRICT WILL BE ABLE TO SET THE DESIRED WATER ELEVATION IN THE CANAL AND AUTOMATICALLY ADJUST GATE POSITION TO MAINTAIN DESIRED WATER LEVELS. THIS PROJECT WILL BENEFIT THE UPPER SNAKE RESERVOIR SYSTEM AND RESULT IN IN MORE CONSTANT RELEASES FROM THE RESERVOIR TO IMPROVE CONDITIONS FOR FISH AND WILDLIFE INCLUDING THE YELLOWSTONE CUTTHROAT TROUT. THIS PROJECT SUPPORTS THE GOALS OF THE FREMONT-MADISON IRRIGATION DISTRICT CONSERVATION PLAN. | Idaho (Bureau of Reclamation federal awards) | FREMONT MADISON IRRIGATION DISTRICT | $100K | — |
| AWARD PURPOSE FUNDING FRORN THIS FINANCIAL ASSISTANCE AGREEMENT WILL BE USED TO PROVIDE LABOR COSTS FOR THE PARK SOPERATIONS AND MAINTENANCE, COVER THE COSTS OF SUPPLIES, TOOLS, AND EQUIPMENT AS WELL AS COVER ROUTINEMAINTENANCE AND REPAIRS ASSOCIATED WITH THE OPERATION OF THE BOAT RAMP RECREATION AREA ACTIVITIES TO BE PERFORMED THE ROUTINE MAINTENANCE AND REPAIRS THAT WILL BE COVERED BY THIS AGREEMENT INCLUDE MAINTAINING THE GRAVEL PARKING AREA, MOWING THE WEEDS SURROUNDING THE PARKING AREA AND BOAT RAMP, MAINTAINING PICNIC AREAS, CLEANING VAULT TOILETS, MAINTAINING AND INSTALLING THE BOAT DOCK, REPAIRING THE SHELTERS, WEEKLY TRASH REMOVAL, AND TRAFFIC CONTROL EXPECTED DELIVERABLES OR OUTCOMES IN THE PAST POWER COUNTY HAS MANAGED THE RECREATION AREA WITHOUT ADDITIONAL FEDERAL FUNDING, HOWEVER, INCREASING PUBLIC USE OF THE RECREATION AREA HAS NECESSITATED FEDERAL FUNDING FOR RECLAMATION TO FULFILL ITS OBLIGATION TO PROVIDE SAFE RECREATION OPPORTUNITIES THROUGH THE MANAGEMENT AGREEMENT THE PUBLIC UTILIZES THE WEST BOAT RAMP AND ASSOCIATED RECREATION AREA THROUGHOUT THE YEAR THIS FUNDING WILL CREATED A SAFER ENVIRONMENT FOR THE RECREATING PUBLIC AS WELL AS PROVIDE A CLEANER ENVIRONMENT FOR THOSE WHO UTILIZE THE RECREATION AREA INTENDED BENEFICIARIES THIS WILL ENABLE THE RECREATION AREA TO CONTINUE TO BE OPEN THROUGHOUT THE YEAR WHICH WILL ALLOW THE PUBLIC TO CONTINUE TO HAVE OPPORTUNITIES TO RECREATE AT THE AMERICAN FALLS RESERVOIR SUBRECIPIENT ACTIVITIES IF KNOWN OR SPECIFIED AT TIME OF AWARD | Idaho (Bureau of Reclamation federal awards) | COUNTY OF POWER | $64K | — |
| AWARD PURPOSE: THE PURPOSE OF THIS PROJECT IS TO DESIGN A NEW RECREATION SITE ALONG THE BOISE GREENBELT ALONG THE BOISE RIVER TO ADDRESS PUBLIC HEALTH AND SAFETY CONCERNS AND TO MEET FEDERAL ACCESSIBILITY STANDARDS.ACTIVITIES TO BE PERFORMED: THIS PROJECT WILL COMPLETE THE DESIGN ASPECT FOR A NEW PARK THAT WILL BE MANAGED BY ADA COUNTY ON BUREAU OF RECLAMATION PROPERTY. THE SITE WILL ALSO APPEAL TO A WIDE VARIETY OF RECREATIONISTS (PEDESTRIANS, CYCLISTS, BIRDWATCHERS, ANGLERS, ETC.) WHO WILL BE ABLE TO FORMALLY PARK AND ACCESS THE GREENBELT AND THE BOISE RIVER FROM HIGHWAY 21. THE COMPLETED PARK WILL FUNCTION AS A SHADED REST AREA FOR GREENBELT USERS AND AN EDUCATIONAL SITE FOR THOSE SEEKING MORE INFORMATION REGARDING DIVERSION DAM AND OTHER NEARBY POINTS OF INTEREST. WITHOUT PROPER PARK PLANNING AND DESIGN, THE AREA WILL BE DEVELOPED IN A HAPHAZARD MANNER BY THE RECREATING PUBLIC AND WILL LIKELY RESULT IN RESOURCE DAMAGE FROM USER CREATED TRAILS AND IMPROPER USAGE AS WELL AS ADDITIONAL ACCESS ISSUES. WITH PROPER PARK PLANNING, WE CAN ADDRESS BOTH RECREATION NEEDS AND RESOURCE PROTECTION WHILE FILLING CLEAR VOIDS WITHIN THIS AREA OF THE GREENBELT: DESIGNATED PARKING AND SHADED REST AREAS WITH RECREATIONAL AMENITIES.EXPECTED DELIVERABLES OR OUTCOMES: THIS PROJECT WILL CREATE A USEABLE DESIGN FOR A FUTURE CONSTRUCTION PROJECT AT THE PARK SITE. THE DESIGN WILL MEET ACCESSIBILITY REQUIREMENTS, AND ADDRESS PUBLIC HEALTH AND SAFETY CONCERNS IN THE AREA. INTENDED BENEFICIARIES: THE PUBLIC USERS OF THE RIVER AND FUTURE USERS OF THE PARK. SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): NONE | Idaho (Bureau of Reclamation federal awards) | ADA COUNTY IDAHO | $50K | — |
| WATER MANAGEMENT, CONSERVATION, AND MODERNIZATION PLAN UPDATE PROJECT ABSTRACTAWARD PURPOSE NORTH SIDE CANAL COMPANY NSCC OWNS AND OPERATES A NETWORK OF 900 MILES OF CANALS USED TO CONVEY IRRIGATION WATER TO 160,000 ACRES OF FARMLAND BETWEEN HAZELTON AND KING HILL, IDAHO WITH THE MAIN OFFICE LOCATED IN JEROME NSCC HAS EXISTING STORAGE WATER CONTRACTS WITH THE RECLAMATION IN JACKSON LAKE WYOMING , PALISADES RESERVOIR IDAHO , AND AMERICAN FALLS RESERVOIR IDAHO , ALL LOCATED ON THE MAIN STEM OF THE SNAKE RIVER THIS STORAGE WATER ALONG WITH NATURAL FLOW WATER RIGHTS ON THE SNAKE RIVER, ARE DIVERTED AT MILNER DAM, NEAR HAZELTON, IDAHO THE IDAHO DEPARTMENT OF WATER RESOURCES THROUGH WATER DISTRICT 1 OVERSEES THE ADMINISTRATION AND ACCOUNTING OF NSCC S STORAGE AND NATURAL FLOW WATER RIGHTS THIS PLANNING PROJECT WILL UPDATE THE EXISTING WATER MANAGEMENT AND CONSERVATION PLAN THAT WAS COMPLETED BY CH2M HILL AND WILL BE USED TO GUIDE NSCC IN ITS FUTURE PLANNING AND PROJECT CONSTRUCTION ACTIVITIES ACTIVITIES TO BE PERFORMED NSCC WILL UPDATE THEIR 2003 WATER CONSERVATION AND MANAGEMENT PLAN THE UPDATE WILL FOCUS ON DEFINING AREAS FOR CANAL IMPROVEMENTS, QUANTIFYING BENEFITS, AND PRIORITIZING PROJECTS BASED ON WATER SAVINGS, ENERGY SAVINGS, AND COSTS THE NEW WATER CONSERVATION AND MANAGEMENT PLAN WILL PROVIDE DIRECTION TO NSCC STAKEHOLDERS TO SYSTEMATICALLY UPGRADE INFRASTRUCTURE WHERE IT IS MOST NEEDED AND IMPROVE WATER ADMINISTRATION AND CONTROL EXPECTED DELIVERABLES OR OUTCOMES THE UPDATED WATER MANAGEMENT AND CONSERVATION PLAN WILL PROVIDE NSCC WITH A ROADMAP OF PROJECTS THAT WILL ENABLE GREATER CONSERVATION OF WATER, DEFINE OPPORTUNITIES TO DEVELOP AND CONSERVE ENERGY, AND MAKE DELIVERIES TO SHAREHOLDERS MORE RELIABLE AND EFFICIENT THIS WORK WILL BE CARRIED OUT STARTING AUGUST 15, 2022, WITH A COMPLETION DATE OF MARCH 15, 2023 INTENDED BENEFICIARIES THE WATER CONSERVATION FIELD SERVICES PROGRAM PROVIDES FUNDING FOR PROJECTS THAT RESULT IN WATER MANAGEMENT PLANNING THESE PLANNING PROJECTS SUPPORT PLANNING FOR WATER MANAGERS TO PLAN, PRIORITIZE, AND DESIGN PROJECTS THAT CONSERVE AND USE WATER MORE EFFICIENTLY MITIGATE CONFLICT RISK IN AREAS AT A HIGH RISK OF FUTURE WATER CONFLICT AND ACCOMPLISH OTHER BENEFITS THAT CONTRIBUTE TO SUSTAINABILITY IN THE WESTERN UNITED STATES SUBRECIPIENT ACTIVITIES IF KNOWN OR SPECIFIED AT TIME OF AWARD N A | Idaho (Bureau of Reclamation federal awards) | NORTH SIDE CANAL COMPANY LTD | $25K | — |
| AWARD PURPOSE: UNDER THIS AGREEMENT BONNEVILLE COUNTY PARKS WILL CONTINUE TO OPERATE ANDMAINTAIN RIRIE RESERVOIR RECREATION AREAS FOR PUBLIC USE AT BLACKTAIL PARK AND JUNIPER CAMPGROUND, AS WELL AT BOAT-ACCESS ONLY PARKS BENCHLAND PARK AND WILLOW POINT PARK. ACTIVITIES TO BE PERFORMED: MAINTENANCE IMPROVEMENTS TO BOAT DOCKS, TRASH COLLECTION, LANDSCAPING, PARKING LOT MAINTENANCE, CAMPGROUND MAINTENANCE, AND MISCELLANEOUS MAINTENANCE NEEDS AND SERVICES. INCLUDING LAGOON REPAIR, LANDSCAPING WITH ADDITIONAL DOCKS AND PAVING. RE-LINING OF SEWAGE LAGOONS TO MEET IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY STANDARDS, WHERE ALL SEWAGE LAGOONS MUST BE LINED TO AVOID WASTEWATER SEEPAGE. SEWAGE LAGOONS WERE INSTALLED BY RECLAMATION PRIOR TO DEPARTMENT OF ENVIRONMENTAL QUALITYS EXISTENCE.EXPECTED DELIVERABLES OR OUTCOMES: GENERAL MAINTENANCE: GROUNDS, SPRINKLERS, BUILDING, AUTO AND EQUIPMENT. MAINTENANCE ON PARKS, ROADS, BUILDING AND TRAILS, TO PROVIDE SAFE, UNIVERSAL ACCESS, AND ATTRACTIVE FACILITIES TO PROVIDE HIGH QUALITY RECREATION OPPORTUNITIES AND EXPERIENCE.INTENDED BENEFICIARIES: RECREATIONALISTS WHO WANTS TO HAVE A SAFE, CLEAN, CARED FOR RECREATION AREA. RIRIE RESERVOIR SERVES PEOPLE FROM ALL OVER THE COUNTY, AS WELL AS LOCAL RV USERS AND BOATERS.SUBRECIPIENT ACTIVITIES (IF KNOWN OR SPECIFIED AT TIME OF AWARD): N A | Idaho (Bureau of Reclamation federal awards) | BONNEVILLE COUNTY | — | — |
| ANDERSON RANCH DAM TURBINE MODERNIZATION AND RUNNER REPLACEMENT. | Idaho (Bureau of Reclamation federal awards) | ANDRITZ HYDRO CORP | $16.6M | — |
| AWARD OF RIRIE RESERVOIR MITIGATION | Idaho (Bureau of Reclamation federal awards) | IDAHO DEPARTMENT OF FISH GAME | $1.4M | — |
| BLACK CANYON DAM HYDRO-PUMP RUNNER REPLACEMENTS | Idaho (Bureau of Reclamation federal awards) | CANYON INDUSTRIES INC | $472K | — |
| LAW ENFORCEMENT PATROL SERVICES - RIRIE DAM AND RESERVOIR, UPPER SNAKE FIELD OFFICE, HEYBURN, IDAHO (BONNEVILLE COUNTY). | Idaho (Bureau of Reclamation federal awards) | BONNEVILLE COUNTY | $153K | — |
| ANDERSON RANCH DAM CRB | Idaho (Bureau of Reclamation federal awards) | CDM FEDERAL PROGRAMS CORPORATION | $136K | — |
| THIS IS A WEED CONTROL PURCHASE ORDER FOR RIRIE DAM, AT RIRIE, IDAHO. LENGHTH OF THIS PO IS 1 BASE YEAR AND 4 OPTION YEARS. | Idaho (Bureau of Reclamation federal awards) | NEW ENVIRONMENT, L.L.C | $64K | — |
| DIVING SERVICES FOR BIOLOGICAL SAMPLING, SNAKE RIVER AREA OFFICE, UPPER SNAKE FIELD OFFICE, SNAKE RIVER NEAR MINIDOKA DAM, IDAHO | Idaho (Bureau of Reclamation federal awards) | MARY ANN SPAULDING | $44K | — |
| 2024 SRAO PHYSICALS - MINIDOKA DAM, PALISADES DAM, BLACK CANYON DAM-PARKS, BLACK CANYON DAM-MAINTENANCE, BLACK CANYON DAM-OPERATIONS, AMERICAN FALLS DAM, ANDERSON RANCH/ARROWROCK DAM'S, JACKSON LAKE, AND RIRIE DAM. | Idaho (Bureau of Reclamation federal awards) | COMPREHENSIVE OCCUPATIONAL MEDICAL SERVICES, P.C. | $32K | — |