California drinking water contracts
92 contracts tracked across 1 municipality.
Contracts
92
municipalities
1
Distinct vendors
31
municipalities with the most drinking water contracts
Top vendors in California drinking water
| Vendor | Contracts | Volume |
|---|---|---|
| STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | 18 | $1.7B |
| HOOPA VALLEY PUBLIC UTILITIES DISTRICT | 3 | $5.7M |
| INTER-TRIBAL COUNCIL OF ARIZONA INC | 1 | $1.6M |
| IIPAY NATION OF SANTA YSABEL | 1 | $1.5M |
| SOQUEL CREEK WATER DISTRICT | 1 | $1.4M |
| SHERWOOD VALLEY RANCHERIA | 1 | $298K |
Recent drinking water contracts in California
| Title | municipality | Vendor | Value | Solicitation |
|---|---|---|---|---|
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING UNDER THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) TO THE STATE OF CALIFORNIA TO IMPLEMENT RESOURCES AND PRIORITIES TO HELP ADDRESS PER- AND POLYFLUOROALKYL SUBSTANCES (PFAS) AND EMERGING CONTAMINANT CHALLENGES; TARGET RESOURCES TO COMMUNITIES MOST IN NEED OF ASSISTANCE TO ENSURE THAT NO COMMUNITY IS LEFT BEHIND WITH UNSAFE, INADEQUATE WATER; AND ADVANCE THE PRIORITIES OF EQUITY AND ENVIRONMENTAL JUSTICE. CALIFORNIA WILL PROVIDE TECHNICAL ASSISTANCE TO PUBLIC WATER SYSTEMS SERVING SMALL OR DISADVANTAGED COMMUNITIES TO ADDRESS PFAS AND OTHER EMERGING CONTAMINANTS WITH THIS AWARD FUNDING. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $169,115,000. PRE-AWARD COSTS HAVE BEEN APPROVED BACK TO 07/01/2023.ACTIVITIES:THE ACTIVITIES INCLUDE PROJECTS AND ACTIVITIES TO ADDRESS EMERGING CONTAMINANTS IN SMALL OR DISADVANTAGED COMMUNITIES, INCLUDING BUT NOT LIMITED TO RESEARCH AND TESTING; PLANNING AND DESIGN TO ADDRESS EMERGING CONTAMINATES; TREATMENT OF EMERGING CONTAMINANTS; SOURCE WATER ACTIVITIES RELATED TO EMERGING CONTAMINANTS; STORAGE; WATER SYSTEM RESTRUCTURING; PROVIDING HOUSEHOLDS ACCESS TO DRINKING WATER SERVICES; TECHNICAL ASSISTANCE; OUTREACH AND EDUCATION; AND WORKFORCE OR TRAINING SUPPORT TO PUBLIC WATER SYSTEMS IN ADDRESSING EMERGING CONTAMINANTS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THIS AGREEMENT IS TO AN ELIGIBLE STATE OR TERRITORY TO IMPLEMENT A PROGRAM TO PROVIDE ASSISTANCE TO ADDRESS EMERGING CONTAMINANTS IN DRINKING WATER TO SMALL OR DISADVANTAGED COMMUNITIES. FUNDS ARE TO CARRY OUT PROJECTS AND ACTIVITIES NEEDED FOR PUBLIC WATER SYSTEMS TO COMPLY WITH THE SAFE DRINKING WATER ACT, PROGRAMS TO PROVIDE HOUSEHOLD WATER QUALITY TESTING, ACTIVITIES FOR A STATE TO RESPOND TO A DRINKING WATER CONTAMINANTS, AND ACTIVITIES THAT BENEFIT THE IMPACTED COMMUNITIES. THE ANTICIPATED DELIVERABLES INCLUDE SAMPLING EMERGING CONTAMINANTS AT ALL COMMUNITY WATER SYSTEMS SERVING SMALL AND DISADVANTAGED COMMUNITIES, TECHNICAL EVALUATION OF SOLUTIONS TO ADDRESS EMERGING CONTAMINANTS, PLANNING AND CONSTRUCTION OF TREATMENT SOLUTIONS, PUBLIC OUTREACH AND ENGAGEMENT, TESTING OF PRIVATE WELLS FOR POTENTIAL CONNECTION WITH EXISTING PUBLIC WATER SYSTEMS. THE EXPECTED OUTCOMES INCLUDE REDUCTION IN PFAS AND OTHER EMERGING CONTAMINANTS IN DRINKING WATER OF SMALL AND DISADVANTAGED COMMUNITIES IN CALIFORNIA. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS OF SMALL AND DISADVANTAGED COMMUNITIES THROUGHOUT THE STATE. DIRECT BENEFICIARIES OF THIS PROGRAM INCLUDE ALL STATE RESIDENTS AND OCCUPANTS, BOTH PERMANENT AND TEMPORARY. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $169.1M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD. SECTION 1452 OF THE SAFE DRINKING WATER ACT (SDWA) AND INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) PL 117-58 AUTHORIZES THE STATE TO UTILIZE FUNDS TO FURTHER THE HEALTH PROTECTION OBJECTIVES OF SDWA. THIS AGREEMENT WILL PROVIDE FUNDS TO CAPITALIZE THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND (DWSRF). AS PART OF THIS AGREEMENT, THE STATE ENSURES COMPLIANCE WITH FEDERAL AND STATE REGULATIONS, WHICH ARE DESIGNED TO PROTECT PUBLIC HEALTH. THIS GRANT AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $227,150,000.00. PRE-AWARD COSTS ARE APPROVED BACK TO 7/1/23. ACTIVITIES:THE BULK OF THE STATE REVOLVING FUND (SRF) WILL BE USED FOR LOANS AND OTHER AUTHORIZED ASSISTANCE TO PUBLIC WATER SYSTEMS FOR ELIGIBLE PROJECTS, INCLUDING IMPROVING DRINKING WATER TREATMENT, WATER DISTRIBUTION, IMPROVING SOURCE OF WATER SUPPLY, REPLACING OR CONSTRUCTING FINISHED WATER STORAGE TANKS, AND OTHER INFRASTRUCTURE PROJECTS NEEDED TO PROTECT PUBLIC HEALTH. THE RECIPIENT MAY ALSO USE SOME OF THE FUNDING FOR SPECIFIC 'SET-ASIDES'; TO PROVIDE TECHNICAL ASSISTANCE TO SMALL SYSTEMS, PROGRAM ADMINISTRATION, STATE PROGRAM MANAGEMENT AND OTHER ALLOWABLE USES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S DWSRF. THE FUND CAN THEN BE USED TO INCREASE TECHNICAL, FINANCIAL AND MANAGERIAL CAPACITY OF PUBLIC WATER SYSTEMS, AND PROVIDE ASSURANCE OF A CLEANER AND SAFER POTABLE WATER SUPPLY BY FUNDING IMPROVEMENTS TO MULTIPLE WATER INFRASTRUCTURE PROJECTS. THESE PUBLIC HEALTH BENEFITS WILL BE STATEWIDE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $227.2M | — |
| DESCRIPTION:THE PRIMARY PURPOSE/OBJECTIVE OF THIS PROGRAM IS TO CAPITALIZE CALIFORNIA CWSRF PROGRAM FOR FUNDING EMERGING CONTAMINANTS PROJECTS CONSISTENT WITH THE INFRASTRUCTURE INVESTMENT AND JOBS ACT CW EMERGING CONTAMINANTS APPROPRIATION. SECTION 302 OF THE SAFE DRINKING WATER ACT AMENDMENTS OF 1996, 42 U.S.C. 300J-12, AND SUBSEQUENT PUB. L. 109-54, TITLE II, AUG 2, 2005, 119 STAT. 530 ALLOWS FOR THE TRANSFER OF THESE FUNDS TO THE DWSRF AT CALIFORNIA'S REQUEST. THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD HAS PROVIDED SUCH A REQUEST AND HAS PROVIDED THE NECESSARY DOCUMENTATION. THE CW FEDERAL FUNDS IN THE AMOUNT OF $15,208,000 WILL BE AWARDED AS EPA IN-KIND AND AFTER GRANT ACCEPTANCE THE FUNDS WILL BE REPROGRAMMED AND AWARDED TO CALIFORNIA IN THE DW EMERGING CONTAMINANTS GRANT. THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD WILL LOAN THE FUNDS OUT IN CALIFORNIA ENTIRELY AS ADDITIONAL SUBSIDY, CONSISTENT WITH THE LAW, TO PROTECT WATER QUALITY AND PUBLIC HEALTH IN CALIFORNIA AND TO VITALIZE THE ECONOMY THROUGH THE CREATION OF JOBS. THIS PROCESS SATISFIES THE STATUTORY REQUIREMENT THAT THE CWSRF AWARD BE MADE PRIOR TO THE FUNDS TRANSFER. PRE-AWARD COSTS ARE APPROVED BACK TO 7/1/23. ACTIVITIES:THE FULL ALLOTMENT WILL BE TRANSFERRED TO THE DWSRF EMERGING CONTAMINANT GRANT TO THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD. THE ACTIVITIES ARE TO PROVIDE LOW INTEREST FINANCING TO NUMEROUS SUBRECIPIENTS FOR COST ELIGIBLE UNDER SECTION 1452 OF THE SAFE DRINKING WATER ACT (SDWA) AND THE PRIMARY PURPOSE MUST BE TO ADDRESS EMERGING CONTAMINANTS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S DWSRF WITH PRIMARY PURPOSE TO ADDRESS EMERGING CONTAMINANTS IN DRINKING WATER WITH A FOCUS ON PROJECTS ADDRESSING PFAS. THESE PUBLIC HEALTH BENEFITS WILL BE STATEWIDE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $15.2M | — |
| DESCRIPTION:THE PURPOSE OF THIS AGREEMENT IS FOR A CAPITALIZATION GRANT WHICH PROVIDES FUNDS FOR THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND (DWSRF) PROGRAM WITH THE PRIMARY PURPOSE TO ADDRESS EMERGING CONTAMINANTS IN DRINKING WATER WITH A FOCUS ON PROJECTS ADDRESSING PERFLUOROALKYL AND POLYFLUOROALKYL SUBSTANCES (PFAS). EMERGING CONTAMINANTS REFER TO SUBSTANCES AND MICROORGANISMS, INCLUDING MANUFACTURED OR NATURALLY OCCURRING PHYSICAL, CHEMICAL, BIOLOGICAL, RADIOLOGICAL, OR NUCLEAR MATERIALS, WHICH ARE KNOWN OR ANTICIPATED IN THE ENVIRONMENT, THAT MAY POSE NEWLY IDENTIFIED OR RE-EMERGING RISKS TO HUMAN HEALTH, AQUATIC LIFE, OR THE ENVIRONMENT. THESE SUBSTANCES, MICROORGANISMS OR MATERIALS CAN INCLUDE MANY DIFFERENT TYPES OF NATURAL OR MANUFACTURED CHEMICALS AND SUBSTANCES - SUCH AS THOSE IN SOME COMPOUNDS OF PERSONAL CARE PRODUCTS, PHARMACEUTICALS, INDUSTRIAL CHEMICALS, PESTICIDES, AND MICROPLASTICS. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $73,336,000. PRE-AWARD COSTS HAVE BEEN APPROVED BACK TO JULY 1, 2022. ACTIVITIES:SECTION 1452 OF THE SAFE DRINKING WATER ACT (SDWA) AUTHORIZES THE STATE TO UTILIZE FUNDS TO FURTHER THE HEALTH PROTECTION OBJECTIVES OF SDWA. THE STATE HAS SUBMITTED AN INTENDED USE PLAN (IUP) AS PART OF THE APPLICATION PACKAGE FOR THIS CAPITALIZATION GRANT. THIS IUP CONTAINS A LIST OF THE CAPITAL PROJECTS THAT ADDRESS EMERGING CONTAMINANTS THAT MAY RECEIVE FUNDING FROM THIS GRANT. THE RECIPIENT MAY ALSO USE SOME OF THE FUNDING FOR SPECIFIC 'SET-ASIDES' TO PROVIDE TECHNICAL ASSISTANCE TO SMALL SYSTEMS, PROGRAM ADMINISTRATION, STATE PROGRAM MANAGEMENT AND OTHER ALLOWABLE USES. SUBRECIPIENT:NO SUBAWARDS WILL BE ISSUED.OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S DWSRF WITH PRIMARY PURPOSE TO ADDRESS EMERGING CONTAMINANTS IN DRINKING WATER WITH A FOCUS ON PROJECTS ADDRESSING PFAS. THE FUND CAN THEN BE USED TO INCREASE TECHNICAL, FINANCIAL AND MANAGERIAL CAPACITY OF PUBLIC WATER SYSTEMS, AND PROVIDE ASSURANCE OF A CLEANER AND SAFER POTABLE WATER SUPPLY BY FUNDING IMPROVEMENTS TO MULTIPLE WATER INFRASTRUCTURE PROJECTS. THESE PUBLIC HEALTH BENEFITS WILL BE STATEWIDE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $73.3M | — |
| AUTHORIZED UNDER THE WATER INFRASTRUCTURE IMPROVEMENTS FOR THE NATION (WIIN) ACT, THE LEAD TESTING IN SCHOOL AND CHILD CARE PROGRAM DRINKING WATER GRANT CREATES A VOLUNTARY PROGRAM TO ASSIST WITH TESTING FOR LEAD IN DRINKING WATER AT SCHOOLS AND CHILD CARE PROGRAMS. SPECIFICALLY, INTER-TRIBAL COUNCIL OF ARIZONA (ITCA) WILL OVERSEE AND FUND THIS PROGRAM FOR TRIBAL SCHOOLS INCLUDING OUTREACH AND COMMUNICATION. | California (EPA federal awards) | INTER-TRIBAL COUNCIL OF ARIZONA INC | $1.6M | — |
| DESCRIPTION:THE AGREEMENT PROVIDES FUNDING TO IIPAY NATION OF SANTA YSABEL TO IMPLEMENT PROJECTS AND ACTIVITIES THAT ASSIST PUBLIC WATER SYSTEMS SERVING TRIBES TO COMPLY WITH NATIONAL PRIMARY DRINKING WATER REGULATIONS (NPDWRS) OR OTHERWISE FURTHER THE HEALTH PROTECTION OBJECTIVES OF THE SDWA. THIS PROJECT WILL INCLUDE INSTALLATION OF SMART WATER METER TECHNOLOGY THROUGHOUT THE WATER SYSTEM, INSTALLATION OF TELEMETRY AT EACH TANK AND PUMPHOUSE, UPGRADES TO REPLACE 2,000 FEET OF EXISTING 2 INCH PIPING THAT HAS REQUIRED MULTIPLE REPAIRS AND AN INTERCONNECTION TO SAN FELIPE WHICH CONSISTS OF 2,500 FEET OF 6 INCH C900 THAT WOULD INTERCONNECT THE UPPER AND LOWER SYSTEMS TO PROVIDE A RELIABLE WATER SUPPLY. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $1,510,100. ACTIVITIES:ACTIVITIES INCLUDE INSTALLATION OF SMART WATER METER TECHNOLOGY THROUGHOUT THE WATER SYSTEM, INSTALLATION OF TELEMETRY AT EACH TANK AND PUMPHOUSE, UPGRADES TO REPLACE 2,000 FEET OF EXISTING 2 INCH PIPING THAT HAS REQUIRED MULTIPLE REPAIRS, AND AN INTERCONNECTION TO SAN FELIPE WHICH CONSISTS OF 2,500 FEET OF 6 INCH C900 THAT WOULD INTERCONNECT THE UPPER AND LOWER SYSTEMS TO PROVIDE A RELIABLE WATER SUPPLY.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE 1. SMART WATER METER TECHNOLOGY WILL BE INSTALLED ON THE WATER SYSTEMS. 2. THE PROJECT WOULD INSTALL TELEMETRY AT EACH TANK AND PUMPHOUSE. 3. THE UPPER AND LOWER SYSTEMS OF SAN FELIPE WILL BE CONNECTED FOR RELIABLE WATER SUPPLY, THE LOWER 2,000 FEET OF EXISTING 2 INCH PIPING THAT HAS REQUIRED MULTIPLE REPAIRS WILL BE REPLACED, AND A MAIN LINE PRESSURE REDUCING STATION AND 5 FIRE HYDRANTS WILL BE INSTALLED. EXPECTED OUTCOMES ARE ABILITY TO REMOTELY MONITOR WATER USAGE AND POTENTIAL LEAKS, PROVIDE 80,000 GALLONS OF RELIABLE WATER STORAGE, AND PROVIDE FIRE PROTECTION. THE INTENDED BENEFICIARIES INCLUDE MEMBERS OF THE IIPAY NATION OF SANTA YSABEL RESIDING IN THE AREA. | California (EPA federal awards) | IIPAY NATION OF SANTA YSABEL | $1.5M | — |
| DESCRIPTION:THE PURPOSE OF THIS AGREEMENT IS TO PROVIDE FUNDING TO SOQUEL CREEK WATER DISTRICT TO IMPLEMENT ITS MOOSEHEAD DRIVE RELIABILITY AND FIRE IMPROVEMENT MAIN REPLACEMENT PROJECT AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. THIS GRANT AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $1,416,000.00. PRE-AWARD COSTS ARE APPROVED BACK TO 6/1/24. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE AS FOLLOWS: 1. PROCURE ENVIRONMENTAL CONSULTANT-ENVIRONMENTAL CONSULTANT WAS PROCURED PRIOR TO 9/1/24 BUT WAS WORKING DURING THIS PERIOD 2. SUBMIT NEPA CATEX CHECKLIST AND CULTURAL RESOURCES TECH REPORT TO EPA 3. SITE SURVEY AND ASSESSMENT 4. DESIGN AND ENGINEERING-DESIGN ENGINEERING HAS STARTED BUT IT IS NOT COMPLETE 5. SUBMIT NEPA CATEX CHECKLIST AND CULTURAL RESOURCES TECH REPORT TO EPA 6. SITE SURVEY AND ASSESSMENT 7. DESIGN AND ENGINEERING 8. OBTAIN ALL NECESSARY PERMITS 9. PREPARE THE BID DOCUMENTS 10. SUBMIT NOTICE TO INVITE BIDS ON DISTRICT WEBSITE AND DBE GOOD FAITH 11. HOLD CONSTRUCTION PRE-BID MEETING 12. SITE PREPARATION AND STAGING 13. TRENCHING AND EXCAVATION 14. PIPELINE INSTALLATION 15. BACKFILLING AND COMPACTION 16. TESTING AND INSPECTION SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE THE REPLACEMENT AND UPSIZING OF AGING INFRASTRUCTURE INCLUDING THE EXISTING WATER DELIVERY PIPES THAT HAVE DETERIORATED OVER TIME TO MEET DEMAND AND ACCOMMODATE POPULATION GROWTH IN THE CITY OF SOQUEL. THE CURRENT PIPES ARE PRONE TO LEAKS AND BURSTS, WHICH CAN DISRUPT WATER SUPPLY AND REQUIRE FREQUENT REPAIRS, AND THE SMALL DIAMETER PROVIDES INADEQUATE FLOW. BY INSTALLING NEW, UPSIZED, DURABLE PIPES, THE PROJECT AIMS TO ENHANCE THE OVERALL RELIABILITY OF THE WATER DELIVERY SYSTEM, ENSURING A CONSISTENT AND UNINTERRUPTED WATER SUPPLY TO THE COMMUNITY. THE PROJECT WILL ENHANCE FIRE FLOW PROTECTION IN THE MOOSEHEAD DRIVE AREA AS ADEQUATE WATER PRESSURE AND VOLUME STANDARDS WILL BE MET. THE PROJECT ALSO AIMS TO INCREASE THE RESILIENCE OF THE WATER DELIVERY SYSTEM AGAINST VARIOUS CHALLENGES, SUCH AS NATURAL DISASTERS, PIPE FAILURES, AND OTHER EMERGENCIES. BY REPLACING AGING AND VULNERABLE PIPES WITH NEW, HIGH-QUALITY MATERIALS, THE SYSTEM WILL BE BETTER EQUIPPED TO WITHSTAND EXTERNAL STRESSES AND CONTINUE TO FUNCTION OPTIMALLY UNDER ADVERSE CONDITIONS. ADDRESSING CURRENT WATER SYSTEM INADEQUACIES WILL REDUCE MAINTENANCE AND OPERATIONAL COSTS FOR THE SOQUEL CREEK WATER DISTRICT. FREQUENT REPAIRS AND MAINTENANCE OF THE AGING PIPES ARE COSTLY AND TIME-CONSUMING. THE NEW, MODERN PIPES WILL REQUIRE LESS MAINTENANCE AND HAVE A LONGER LIFESPAN, LEADING TO SIGNIFICANT COST SAVINGS FOR THE WATER DISTRICT AND MINIMIZING DISRUPTIONS TO THE COMMUNITY. THIS PROACTIVE INVESTMENT IN INFRASTRUCTURE WILL YIELD LONG-TERM FINANCIAL AND OPERATIONAL BENEFITS. THE PROJECT WILL ENSURE THAT THE WATER DELIVERY SYSTEM COMPLIES WITH CURRENT REGULATORY STANDARDS AND INDUSTRY BEST PRACTICES. THIS INCLUDES MEETING GUIDELINES FOR WATER QUALITY, SAFETY, AND FIRE PROTECTION. BY ADHERING TO THESE STANDARDS, THE PROJECT WILL HELP PROTECT PUBLIC HEALTH AND ENSURE THE COMMUNITY'S WATER SUPPLY IS SAFE AND RELIABLE. IN ADDITION TO THE TECHNICAL IMPROVEMENTS, THE PROJECT WILL HAVE POSITIVE IMPACTS ON THE COMMUNITY AND ENVIRONMENT. A RELIABLE AND RESILIENT WATER SYSTEM SUPPORTS COMMUNITY GROWTH AND DEVELOPMENT, ENHANCES PROPERTY VALUES, AND CONTRIBUTES TO OVERALL QUALITY OF LIFE. ENVIRONMENTALLY, REDUCING LEAKS AND WATER WASTE ALIGNS WITH SUSTAINABILITY GOALS AND PROMOTES RESPONSIBLE WATER MANAGEMENT. | California (EPA federal awards) | SOQUEL CREEK WATER DISTRICT | $1.4M | — |
| DESCRIPTION:THE PURPOSE OF THIS GRANT IS TO ASSIST THE STATE OF CALIFORNIA TO DEVELOP AND IMPLEMENT A PUBLIC WATER SYSTEM SUPERVISION (PWSS) PROGRAM TO ADEQUATELY ENFORCE THE NATIONAL PRIMARY DRINKING WATER REGULATIONS AND THE REQUIREMENTS OF THE SAFE DRINKING WATER ACT (SDWA). THE OBJECTIVES OF THIS PROGRAM ARE TO ENSURE THE FULL AND EFFECTIVE ADMINISTRATION OF THE PWSS PROGRAM (PURSUANT TO SAFE DRINKING WATER ACT (SDWA) SECTION 1443(A)) UNDER THE PRIMACY PROVISIONS OF TITLE 40 CODE OF FEDERAL REGULATIONS (CFR), PART 142, TO HELP ENSURE THE DELIVERY OF WATER SUPPLY THAT MEETS ALL REQUIREMENTS OF THE NATIONAL PRIMARY DRINKING WATER REGULATIONS AS SET FORTH IN 40 CFR, PART 141 TO PROTECT PUBLIC HEALTH, AND TO MAINTAIN PRIMARY ENFORCEMENT AUTHORITY. THIS GRANT AGREEMENT PROVIDES PARTIAL FEDERAL FUNDING IN THE AMOUNT OF $7,081,000.00. PRE-AWARD COSTS ARE APPROVED BACK TO 10/1/2024. ACTIVITIES:THE PROPOSED WORK IN THIS AGREEMENT INCLUDES DEVELOPING STATE DRINKING WATER REGULATIONS NO LESS STRINGENT THAN THE FEDERAL REGULATIONS, MAINTAINING AN INVENTORY OF DRINKING WATER SYSTEMS, MANAGING INFORMATION ON PUBLIC WATER SYSTEMS, ENSURING THAT PUBLIC PARTICIPATION OCCURS REGARDING DRINKING WATER SYSTEMS, PROVIDING TECHNICAL ASSISTANCE TO PUBLIC WATER SYSTEMS AND ENFORCING DRINKING WATER REGULATIONS. THESE ACTIVITIES WILL SUPPORT THE PROTECTION OF THE PUBLIC HEALTH OF RESIDENTS OF AND VISITORS TO THE STATE OF CALIFORNIA BY ENSURING THAT PUBLIC WATER SYSTEMS PROVIDE SAFE DRINKING WATER THROUGH COMPLIANCE WITH REGULATIONS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE: TAKING TARGETED ACTIONS, SUCH AS TRAINING AND TECHNICAL ASSISTANCE, TO SUPPORT EFFORTS TO REDUCE THE NUMBER OF HEALTH-BASED VIOLATIONS AND REDUCE CONSUMER EXPOSURE TO CONTAMINANTS. PROGRAMS SHOULD LOOK COMPREHENSIVELY AT COMMUNITY NEEDS TO IDENTIFY APPROACHES TO ENSURE SUSTAINABLE COMPLIANCE AND SHOULD COORDINATE WITH THE OFFICE OF WATER'S TECHNICAL ASSISTANCE EFFORT TO PROVIDE ASSISTANCE. SUBMITTING PRIMACY PACKAGES FOR ALL NATIONAL PRIMARY DRINKING WATER REGULATIONS (NPDWRS) TO REDUCE THE BACKLOG OF UNSUBMITTED OR UNAPPROVED PACKAGES. COMPLETING SANITARY SURVEYS IN A TIMELY MANNER TO MEET THE REQUIREMENTS OF THE LAW AND SUPPORTING WATER SYSTEMS IN ADDRESSING ANY DEFICIENCIES FOUND. SEEKING OPPORTUNITIES TO IMPLEMENT POLICIES THAT WILL ENHANCE PROGRAM COLLABORATION WITH THE DRINKING WATER STATE REVOLVING FUND (DWSRF), THE WATER INFRASTRUCTURE IMPROVEMENTS FOR THE NATION ACT (WIIN ACT) AND THE CAPACITY DEVELOPMENT PROGRAMS TO ADDRESS NONCOMPLIANCE AMONG VULNERABLE SYSTEMS. ENSURING THAT COMPLIANCE DATA SUBMITTED TO THE US ENVIRONMENTAL PROTECTION AGENCY REGION 9 ARE ACCURATE, COMPLETE, AND SUBMITTED IN A TIMELY MANNER. ADDRESSING IMPLEMENTATION OF THE NEW PER- AND POLYFLUOROALKYL SUBSTANCES (PFAS) RULE, AND THE LEAD AND COPPER RULE REVISION (LCRR) REQUIREMENTS EFFECTIVE IN 2024, INCLUDING LEAD SERVICE LINE INVENTORIES. CONTINUING TO IMPLEMENT THE GROUND WATER RULE AND THE STAGE 2 DISINFECTANTS AND DISINFECTION BYPRODUCTS RULE, WHICH REPRESENTS THE LARGEST NUMBER OF HEALTH-BASED VIOLATIONS. CONTINUING TO ADDRESS SIMULTANEOUS COMPLIANCE CHALLENGES WITH THE LEAD AND COPPER RULE. DEVOTING A PROPORTION OF EACH PWSS GRANT TO ENSURING THAT DATA ARE EFFECTIVELY MANAGED AND THAT REQUIRED DATA ARE SUBMITTED TO THE EPA SUCH THAT WATER SYSTEM COMPLIANCE DETERMINATIONS ARE CONSISTENT WITH FEDERAL AND STATE REGULATIONS; CORRECTIVE ACTIONS ASSOCIATED WITH DATA FILE REVIEWS AND ANNUAL PROGRAM REVIEWS ARE IMPLEMENTED; AND PWSS GRANTEES SUBMIT TO THE EPA THE REQUIRED INVENTORY, COMPLIANCE AND ENFORCEMENT DATA. THE EXPECTED OUTCOME WILL BE THE PROTECTION OF PUBLIC HEALTH BY PREVENTING WATER-BORNE ILLNESS. THE EXPECTED OUTCOMES ALSO INCLUDE REDUCING THE NUMBER OF COMMUNITY WATER SYSTEMS STILL IN NONCOMPLIANCE WITH HEALTH-BASED STANDARDS AND PROVIDING COMMUNITIES WITH TECHNICAL, MANAGERIAL, OR FINANCIAL ASSISTANCE | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $7.1M | — |
| DESCRIPTION:THE AGREEMENT PROVIDES FUNDING TO THE SHERWOOD VALLEY RANCHERIA OF POMO INDIANS OF CALIFORNIA TO IMPLEMENT PROJECTS AND ACTIVITIES THAT ASSIST PUBLIC WATER SYSTEMS SERVING TRIBES TO COMPLY WITH NATIONAL PRIMARY DRINKING WATER REGULATIONS (NPDWRS) OR OTHERWISE FURTHER THE HEALTH PROTECTION OBJECTIVES OF THE SDWA. SPECIFICALLY, THE RECIPIENT WILL CONNECT THE WATER TREATMENT PLANT TO POWER SO THAT THE TRIBE IS ABLE TO CHLORINATE ITS DRINKING WATER. SINCE OLD SHERWOOD VALLEY IS OFF-GRID, THIS PROJECT WILL PROVIDE NEEDED POWER FOR TREATMENT PLANT OPERATION.ACTIVITIES:THE ACTIVITIES INCLUDE TRENCHING ELECTRICAL DISTRIBUTION LINES, INSTALLING CONDUIT LINES, SECURING GENERATOR STORAGE UNITS AND JUNCTION BOXES, AND ADDING SECURITY MEASURES TO THE POWER SOURCES.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE QUARTERLY REPORTS DOCUMENTING PROJECT PROGRESS. THE EXPECTED OUTCOMES INCLUDE COMPLETE INSTALLATION OF THE ELECTRICAL DISTRIBUTION LINES AND SECURITY FOR THE TREATMENT PLANT'S POWER SOURCES. THE INTENDED BENEFICIARIES INCLUDE CUSTOMERS OF THE ORIGINAL SHERWOOD VALLEY RANCHERIA PUBLIC WATER SYSTEM. | California (EPA federal awards) | SHERWOOD VALLEY RANCHERIA | $298K | — |
| DESCRIPTION:THIS AGREEMENT WILL PROVIDE FINANCIAL ASSISTANCE TO THE RECIPIENT FOR THE IMPLEMENTATION OF ITS PROGRAM TO ENSURE THAT UNDERGROUND SOURCES OF DRINKING WATER ARE PROTECTED FROM ENDANGERING INJECTION ACTIVITIES, IN WHICH TREATED WASTEWATER IS INJECTED INTO THE GROUND BETWEEN IMPERMEABLE LAYERS OF ROCK FORMATION. THE PURPOSE OF THIS GRANT IS TO SUPPORT CALGEM TO CONTINUE TO CARRY OUT ITS MANDATED REGULATORY AND OVERSIGHT ACTIVITIES IN OIL AND GAS OPERATIONS ASSOCIATED WITH CLASS II UIC IN THE STATE. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $606,000.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE DEVELOPMENT AND MAINTENANCE OF INVENTORIES OF INJECTION SYSTEMS; THE DEVELOPMENT AND MAINTENANCE OF DATABASES HOUSING COMPLIANCE INFORMATION ON UNDERGROUND INJECTION WELL ACTIVITIES; THE IMPLEMENTATION OF PERMITTING ACTIVITIES; AND THE IMPLEMENTATION OF ENFORCEMENT PROGRAMS.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED OUTCOME IS THAT UNDERGROUND SOURCES OF DRINKING WATER ARE PROTECTED FROM UNDERGROUND INJECTION ACTIVITIES. THE DELIVERABLES INCLUDE: AN END-OF-YEAR REPORT (7520-1, 7520-2A, 7520-2B, 7520-3, AND 7520-4) TO BE SUBMITTED TO EPA WITHIN 45 DAYS FOLLOWING THE CLOSE OF THE FISCAL YEAR; MID-YEAR PROGRAM ACTIVITY MEASURES (7520-2A, 7520-2B, AND 7520-4.); A FINAL PERFORMANCE REPORT WILL BE PROVIDED TO THE EPA IN ACCORDANCE WITH THE AWARD DOCUMENT NO LATER THAN 120 CALENDAR DAYS AFTER THE END DATE OF THE PERIOD OF PERFORMANCE. | California (EPA federal awards) | CONSERVATION, CALIFORNIA DEPARTMENT OF | $606K | — |
| THE PURPOSE OF THIS TASK ORDER IS TO PERFORM CORRECTIVE INFRASTRUCTURE WORK TO ISOLATE SERVICE LINE LATERALS IN ORDER TO RETURN POTABLE DRINKING WATER TO STANDING STRUCTURES IN THE TOWN OF LAHAINA, MAUI. THIS WORK IS CRITICAL FOR THE RESTORATION AND | California (EPA federal awards) | ENVIRONMENTAL QUALITY MANAGEMENT, INC | $4.1M | — |
| HORSLEY WITTEN GROUP FURNISHES SERVICES TO THE U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) REGION 9 PUBLIC WATER SYSTEM SUPERVISION (PWSS) PROGRAM AND THE UNDERGROUND INJECTION CONTROL (UIC) PROGRAM FOR DIRECT IMPLEMENTATION (DI) OF THE SDWA ON INDIAN | California (EPA federal awards) | HORSLEY WITTEN GROUP, INC. | $1.5M | — |
| DESCRIPTION:THIS AGREEMENT WILL PROVIDE FUNDS TO CAPITALIZE THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND (DWSRF) WITH AN EMPHASIS ON LEAD SERVICE LINE REPLACEMENT AND ASSOCIATED ACTIVITIES DIRECTLY CONNECTED TO THE IDENTIFICATION, PLANNING, DESIGN, AND REPLACEMENT OF LEAD SERVICE LINES. AS PART OF THIS AGREEMENT, THE STATE ENSURES COMPLIANCE WITH FEDERAL AND STATE REGULATIONS, WHICH ARE DESIGNED TO PROTECT PUBLIC HEALTH. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $250,107,000. PRE-AWARD COSTS HAVE BEEN APPROVED BACK TO 7/1/2022.ACTIVITIES:THE STATE HAS SUBMITTED AN INTENDED USE PLAN (IUP) AS PART OF THE APPLICATION PACKAGE FOR THIS CAPITALIZATION GRANT . THIS IUP CONTAINS A LIST OF THE CAPITAL PROJECTS THAT ADDRESS LEAD SERVICE LINE REPLACEMENT AND ASSOCIATED ACTIVITIES DIRECTLY CONNECTED TO THE IDENTIFICATION, PLANNING, DESIGN, AND REPLACEMENT OF LEAD SERVICE LINES, WHICH MAY RECEIVE FUNDING FROM THIS GRANT. THE RECIPIENT MAY ALSO USE SOME OF THE FUNDING FOR SPECIFIC 'SET-ASIDES' TO PROVIDE TECHNICAL ASSISTANCE TO SMALL SYSTEMS, PROGRAM ADMINISTRATION, STATE PROGRAM MANAGEMENT AND OTHER ALLOWABLE USES. SUBRECIPIENT:NO SUBAWARDS. OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S DWSRF WITH PRIMARY PURPOSE TO REDUCE LEAD IN DRINKING WATER BY FUNDING PROJECTS EMPHASIZING THE IDENTIFICATION AND REMOVAL OF LEAD SERVICE LINES. THE FUND MAY ALSO BE USED TO INCREASE TECHNICAL, FINANCIAL AND MANAGERIAL CAPACITY OF PUBLIC WATER SYSTEMS, AND PROVIDE ASSURANCE OF A CLEANER AND SAFER POTABLE WATER SUPPLY BY FUNDING IMPROVEMENTS TO MULTIPLE WATER INFRASTRUCTURE PROJECTS. THESE PUBLIC HEALTH BENEFITS WILL BE STATEWIDE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $250.1M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD (CASWRCB) UNDER THE SAFE DRINKING ACT: SECTION 1452 AND INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) PL117-58. THE PURPOSE OF THIS AGREEMENT IS FOR A CAPITALIZATION GRANT WHICH PROVIDES FUNDS FOR THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND (DWSRF) PROGRAM WITH THE PRIMARY PURPOSE TO ADDRESS EMERGING CONTAMINANTS IN DRINKING WATER WITH A FOCUS ON PROJECTS ADDRESSING PERFLUOROALKYL AND POLYFLUOROALKYL SUBSTANCES (PFAS). EMERGING CONTAMINANTS REFER TO SUBSTANCES AND MICROORGANISMS, INCLUDING MANUFACTURED OR NATURALLY OCCURRING PHYSICAL, CHEMICAL, BIOLOGICAL, RADIOLOGICAL, OR NUCLEAR MATERIALS, WHICH ARE KNOWN OR ANTICIPATED IN THE ENVIRONMENT, THAT MAY POSE NEWLY IDENTIFIED OR RE-EMERGING RISKS TO HUMAN HEALTH, AQUATIC LIFE, OR THE ENVIRONMENT. THESE SUBSTANCES, MICROORGANISMS OR MATERIALS CAN INCLUDE MANY DIFFERENT TYPES OF NATURAL OR MANUFACTURED CHEMICALS AND SUBSTANCES - SUCH AS THOSE IN SOME COMPOUNDS OF PERSONAL CARE PRODUCTS, PHARMACEUTICALS, INDUSTRIAL CHEMICALS, PESTICIDES, AND MICROPLASTICS. IN ADDITION, THE CASWRCB HAS PROVIDED A REQUEST AND ALL THE NECESSARY DOCUMENTATION TO TRANSFER THE FULL CLEAN WATER EMERGING CONTAMINANT (CW EC) GRANT TO DRINKING WATER EMERGING CONTAMINANT (DW EC). THE CW EC FUNDS OF $15,208,000 ARE AWARDED AS EPA IN-KIND IN GRANT NUMBER 4X-98T78001 AND WILL BE AWARDED TO CALIFORNIA IN THIS, THE DW EC GRANT. THE CASWRCB WILL PROVIDE THE FUNDS IN CALIFORNIA ENTIRELY AS ADDITIONAL SUBSIDY, CONSISTENT WITH THE LAW, TO PROTECT WATER QUALITY AND PUBLIC HEALTH IN CALIFORNIA AND TO VITALIZE THE ECONOMY THROUGH THE CREATION OF JOBS. THIS PROCESS SATISFIES THE STATUTORY REQUIREMENT THAT THE CWSRF AWARD BE MADE PRIOR TO THE FUNDS TRANSFER. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $97,636,000.00. PRE-AWARD COSTS ARE APPROVED BACK TO JULY 1, 2023. ACTIVITIES:SECTION 1452 OF THE SAFE DRINKING WATER ACT (SDWA) AUTHORIZES THE STATE TO UTILIZE FUNDS TO FURTHER THE HEALTH PROTECTION OBJECTIVES OF SDWA. THE STATE HAS SUBMITTED AN INTENDED USE PLAN (IUP) AS PART OF THE APPLICATION PACKAGE FOR THIS CAPITALIZATION GRANT. THIS IUP CONTAINS A LIST OF THE CAPITAL PROJECTS THAT ADDRESS EMERGING CONTAMINANTS THAT MAY RECEIVE FUNDING FROM THIS GRANT. THE RECIPIENT MAY ALSO USE SOME OF THE FUNDING FOR SPECIFIC 'SET-ASIDES' TO PROVIDE TECHNICAL ASSISTANCE TO SMALL SYSTEMS, PROGRAM ADMINISTRATION, STATE PROGRAM MANAGEMENT AND OTHER ALLOWABLE USES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S DWSRF WITH PRIMARY PURPOSE TO ADDRESS EMERGING CONTAMINANTS IN DRINKING WATER WITH A FOCUS ON PROJECTS ADDRESSING PFAS. THE FUND CAN BE USED FOR ELIGIBLE SET-ASIDE ACTIVITIES RELATED TO PFAS AND OTHER EMERGING CONTAMINANTS. THESE PUBLIC HEALTH BENEFITS WILL BE STATEWIDE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $100.0M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES A CAPITALIZATION GRANT FOR THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND (DWSRF) PROGRAM. THE AWARD FURTHERS THE PUBLIC HEALTH PROTECTION OBJECTIVES OF THE SAFE DRINKING WATER ACT (SDWA). THIS GRANT AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $50,283,000.00. PRE-AWARD COSTS ARE APPROVED BACK TO 7/1/24. ACTIVITIES:THE RECIPIENT OF THESE FUNDS WILL PROVIDE LOW INTEREST RATE FINANCING TO ELIGIBLE PUBLIC WATER SYSTEMS FOR THE COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE DRINKING WATER IMPROVEMENT PROJECTS. THE RECIPIENT MAY ALSO USE SOME OF THE FUNDING FOR SPECIFIC SET-ASIDES, INCLUDING BUT NOT LIMITED TO PROVIDING TECHNICAL ASSISTANCE TO SMALL SYSTEMS, FOR OPERATOR CERTIFICATION ACTIVITIES, AND SOURCE WATER PROTECTION ACTIVITIES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE FINANCING, PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE PUBLIC HEALTH-RELATED PROJECTS. DELIVERABLES WILL ALSO BE USED TO INCREASE THE TECHNICAL, MANAGERIAL, AND FINANCIAL CAPACITY OF PUBLIC WATER SYSTEMS. THE EXPECTED OUTCOME IS PUBLIC HEALTH PROTECTION. THE INTENDED BENEFICIARIES INCLUDE CITIZENS THROUGHOUT THE STATE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $50.3M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO STATE OF CALIFORNIA TO ASSIST AN UNDERSERVED COMMUNITY TO MEET AND COMPLY WITH SDWA DRINKING WATER REGULATIONS. FUNDS ARE TO CARRY OUT PROJECTS AND ACTIVITIES NEEDED FOR PUBLIC WATER SYSTEMS TO COMPLY WITH THE SAFE DRINKING WATER ACT, PROGRAMS TO PROVIDE HOUSEHOLD WATER QUALITY TESTING, AND ACTIVITIES FOR A STATE TO RESPOND TO A DRINKING WATER CONTAMINANT. THIS AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $4,667,000. SEE TERMS AND CONDITIONS.ACTIVITIES:THE ACTIVITIES INCLUDE INSTALLATION OF GAC TREATMENT FOR 1,2,3-TRICHLOROPROPANE (TCP) CONTAMINATION.SUBRECIPIENT:SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT TO PIXLEY PUBLIC WATER DISTRICT. CSWRCB USES FINANCING AGREEMENTS MAY INCLUDE APPROPRIATE CONDITIONS AND CRITICAL DUE DATES TO ENSURE THAT PROJECTS ARE COMPLETED SUCCESSFULLY AND EXPEDITIOUSLY IN CONFORMANCE WITH APPLICABLE REQUIREMENTS. IF THE SUBAWARD RECIPIENT MISSES A CRITICAL DUE DATE OR FAILS TO FULFILL A CONDITION OF THE AGREEMENT, THE CSWRCB MAY TERMINATE THE AGREEMENT. THE COMPLETION OF CONSTRUCTION DATE WILL BE ESTABLISHED BY MUTUAL AGREEMENT BETWEEN THE CSWRCB AND THE SUBAWARD RECIPIENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE PIXLEY TCP TREATMENT DESIGN TO ADDRESS THE SYNTHETIC ORGANIC CONTAMINANT 1,2,3-TRICHLOROPROPANE (TCP). THE EXPECTED OUTCOMES INCLUDE PROVIDING A REDUCTION IN THE NUMBER OF PUBLIC WATER SYSTEMS OUT OF COMPLIANCE. THE INTENDED BENEFICIARIES INCLUDE PIXLEY PUBLIC UTILITY DISTRICT. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $4.7M | — |
| EPA IS REQUESTING ASSISTANCE IN DEVELOPING LEAD SERVICE LINE INVENTORIES IN THE STATE OF NEVADA. ASSISTANCE WILL INCLUDE RESEARCHING EXISTING INFORMATION ON COMMUNITY WATER SYSTEM DISTRIBUTION LINES, CONDUCT TRAININGS, AND ASSISTING IN COMPLETING INV | California (EPA federal awards) | PG ENVIRONMENTAL, LLC | $109K | — |
| DESCRIPTION:THE PURPOSE OF THIS GRANT IS TO PROVIDE A CAPITALIZATION GRANT, FUNDED BY THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58), FOR THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND (DWSRF) PROGRAM. THE AWARD FURTHERS THE PUBLIC HEALTH PROTECTION OBJECTIVES OF THE SAFE DRINKING WATER ACT (SDWA). THIS GRANT AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $247,974,000.00. PRE-AWARD COSTS ARE APPROVED BACK TO 7/1/24 ACTIVITIES:THE RECIPIENT OF THESE FUNDS WILL PROVIDE LOW INTEREST RATE FINANCING TO ELIGIBLE PUBLIC WATER SYSTEMS FOR THE COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE DRINKING WATER IMPROVEMENT PROJECTS. THE RECIPIENT MAY ALSO USE SOME OF THE FUNDING FOR SPECIFIC SET-ASIDES, INCLUDING BUT NOT LIMITED TO PROVIDING TECHNICAL ASSISTANCE TO SMALL SYSTEMS, FOR OPERATOR CERTIFICATION ACTIVITIES, AND SOURCE WATER PROTECTION ACTIVITIES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE FINANCING, PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE PUBLIC HEALTH-RELATED PROJECTS. DELIVERABLES WILL ALSO BE USED TO INCREASE THE TECHNICAL, MANAGERIAL, AND FINANCIAL CAPACITY OF PUBLIC WATER SYSTEMS. THE EXPECTED OUTCOME IS PUBLIC HEALTH PROTECTION. THE INTENDED BENEFICIARIES INCLUDE CITIZENS THROUGHOUT THE STATE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $248.0M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES A CAPITALIZATION GRANT FOR THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND (DWSRF) PROGRAM. THE AWARD FURTHERS THE PUBLIC HEALTH PROTECTION OBJECTIVES OF THE SAFE DRINKING WATER ACT (SDWA). THIS GRANT AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $117,662,000.00. PRE-AWARD COSTS ARE APPROVED BACK TO 7/1/25. ACTIVITIES:THE RECIPIENT OF THESE FUNDS WILL PROVIDE LOW-INTEREST RATE FINANCING TO ELIGIBLE PUBLIC WATER SYSTEMS FOR THE COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE DRINKING WATER IMPROVEMENT PROJECTS. THE RECIPIENT MAY ALSO USE SOME OF THE FUNDING FOR SPECIFIC SET-ASIDES, INCLUDING BUT NOT LIMITED TO PROVIDING TECHNICAL ASSISTANCE TO SMALL SYSTEMS, FOR OPERATOR CERTIFICATION ACTIVITIES, AND SOURCE WATER PROTECTION ACTIVITIES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE FINANCING, PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE PUBLIC HEALTH-RELATED PROJECTS. DELIVERABLES WILL ALSO BE USED TO INCREASE THE TECHNICAL, MANAGERIAL, AND FINANCIAL CAPACITY OF PUBLIC WATER SYSTEMS. THE EXPECTED OUTCOME IS PUBLIC HEALTH PROTECTION. THE INTENDED BENEFICIARIES INCLUDE CITIZENS THROUGHOUT THE STATE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $117.7M | — |
| THIS AGREEMENT IS FOR A CAPITALIZATION GRANT WHICH PROVIDES FUNDS FOR THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND PROGRAM TO PROVIDE LOW INTEREST FINANCING TO RECIPIENTS FOR COSTS ASSOCIATED WITH THE PLANNING, DESIGN AND CONSTRUCTION OF ELIGIBLE DRINKING WATER IMPROVEMENT PROJECTS AND ACTIVITIES TO PROTECT HUMAN HEALTH. THIS GRANT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $97,072,000. PRE-AWARD COSTS HAVE BEEN APPROVED BACK TO JULY 1, 2019. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $98.0M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES A CAPITALIZATION GRANT, FUNDED BY THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58), FOR THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND PROGRAM (DWSRF). THESE FUNDS ARE FOR DWSRF-ELIGIBLE PROJECTS THAT ADDRESS EMERGING CONTAMINANTS IN DRINKING WATER WITH A FOCUS ON PROJECTS ADDRESSING PERFLUOROALKYL AND POLYFLUOROALKYL SUBSTANCES (PFAS). THE AWARD FURTHERS THE PUBLIC HEALTH PROTECTION OBJECTIVES OF THE SAFE DRINKING WATER ACT (SDWA). AS PART OF ITS GRANT APPLICATION, THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD PROVIDED A REQUEST AND ALL THE NECESSARY DOCUMENTATION TO TRANSFER THE FULL CLEAN WATER (CW) EMERGING CONTAMINANTS ALLOTMENT TO THE DRINKING WATER EMERGING CONTAMINANTS FUND. THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD WILL PROVIDE THE FUNDS IN CALIFORNIA ENTIRELY AS ADDITIONAL SUBSIDY, CONSISTENT WITH THE LAW, TO PROTECT WATER QUALITY AND PUBLIC HEALTH IN CALIFORNIA AND TO VITALIZE THE ECONOMY THROUGH THE CREATION OF JOBS. THIS PROCESS SATISFIES THE STATUTORY REQUIREMENT THAT THE CWSRF AWARD BE MADE PRIOR TO THE FUNDS TRANSFER. THIS AGREEMENT PROVIDES PARTIAL FEDERAL FUNDING IN THE AMOUNT OF $82,428,000. THE CW EMERGING CONTAMINANT FUNDS OF $15,208,000 ARE AWARDED AS EPA IN-KIND UNDER GRANT #4X-97T42401-0; THIS AMOUNT WILL BE ADDED TO THIS AGREEMENT VIA AN AMENDMENT. PRE-AWARD COSTS ARE APPROVED BACK TO 7/1/25. ACTIVITIES:THE RECIPIENT OF THESE FUNDS WILL PROVIDE LOW-INTEREST RATE FINANCING TO ELIGIBLE PUBLIC WATER SYSTEMS FOR THE COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE DRINKING WATER IMPROVEMENT PROJECTS. THE RECIPIENT MAY ALSO USE SOME OF THE FUNDING FOR SPECIFIC SET-ASIDES, INCLUDING BUT NOT LIMITED TO PROVIDING TECHNICAL ASSISTANCE TO SMALL SYSTEMS, FOR OPERATOR CERTIFICATION ACTIVITIES, AND SOURCE WATER PROTECTION ACTIVITIES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE FINANCING, PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE EMERGING CONTAMINANT-FOCUSED, PUBLIC HEALTH-RELATED PROJECTS. DELIVERABLES WILL ALSO BE USED TO INCREASE THE TECHNICAL, MANAGERIAL, AND FINANCIAL CAPACITY OF PUBLIC WATER SYSTEMS. THE EXPECTED OUTCOME IS PUBLIC HEALTH PROTECTION. THE INTENDED BENEFICIARIES INCLUDE CITIZENS THROUGHOUT THE STATE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $97.6M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES A CAPITALIZATION GRANT, FUNDED BY THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58), FOR THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND PROGRAM (DWSRF). THESE FUNDS ARE FOR DWSRF-ELIGIBLE PROJECTS THAT ADDRESS EMERGING CONTAMINANTS IN DRINKING WATER WITH A FOCUS ON PROJECTS ADDRESSING PERFLUOROALKYL AND POLYFLUOROALKYL SUBSTANCES (PFAS). THE AWARD FURTHERS THE PUBLIC HEALTH PROTECTION OBJECTIVES OF THE SAFE DRINKING WATER ACT (SDWA). AS PART OF ITS GRANT APPLICATION, THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD PROVIDED A REQUEST AND ALL THE NECESSARY DOCUMENTATION TO TRANSFER THE FULL CLEAN WATER EMERGING CONTAMINANTS ALLOTMENT TO THE DRINKING WATER EMERGING CONTAMINANTS FUND. THE CW EMERGING CONTAMINANT FUNDS OF $15,208,000 WERE AWARDED AS EPA IN-KIND IN GRANT NUMBER 4X-97T11901 AND ARE NOW AWARDED TO CALIFORNIA IN THIS, THE DW EMERGING CONTAMINANTS GRANT. THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD WILL PROVIDE THE FUNDS IN CALIFORNIA ENTIRELY AS ADDITIONAL SUBSIDY, CONSISTENT WITH THE LAW, TO PROTECT WATER QUALITY AND PUBLIC HEALTH IN CALIFORNIA AND TO VITALIZE THE ECONOMY THROUGH THE CREATION OF JOBS. THIS PROCESS SATISFIES THE STATUTORY REQUIREMENT THAT THE CWSRF AWARD BE MADE PRIOR TO THE FUNDS TRANSFER. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $97,636,000.00. PRE-AWARD COSTS ARE APPROVED BACK TO JULY 1, 2024. ACTIVITIES:THE RECIPIENT OF THESE FUNDS WILL PROVIDE LOW-INTEREST RATE FINANCING TO ELIGIBLE PUBLIC WATER SYSTEMS FOR THE COSTS ASSOCIATED WITH THE PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE DRINKING WATER IMPROVEMENT PROJECTS. THE RECIPIENT MAY ALSO USE SOME OF THE FUNDING FOR SPECIFIC SET-ASIDES, INCLUDING BUT NOT LIMITED TO PROVIDING TECHNICAL ASSISTANCE TO SMALL SYSTEMS, FOR OPERATOR CERTIFICATION ACTIVITIES, AND SOURCE WATER PROTECTION ACTIVITIES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE FINANCING, PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE EMERGING CONTAMINANT-FOCUSED, PUBLIC HEALTH-RELATED PROJECTS. DELIVERABLES WILL ALSO BE USED TO INCREASE THE TECHNICAL, MANAGERIAL, AND FINANCIAL CAPACITY OF PUBLIC WATER SYSTEMS. THE EXPECTED OUTCOME IS PUBLIC HEALTH PROTECTION. THE INTENDED BENEFICIARIES INCLUDE CITIZENS THROUGHOUT THE STATE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $97.6M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD. SECTION 1452 OF THE SAFE DRINKING WATER ACT (SDWA) AUTHORIZES THE STATE TO UTILIZE FUNDS TO FURTHER THE HEALTH PROTECTION OBJECTIVES OF SDWA. THIS AGREEMENT WILL PROVIDE FUNDS TO CAPITALIZE THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND (DWSRF) TO PROVIDE LOW INTEREST FINANCING FOR COSTS ASSOCIATED WITH THE PLANNING, DESIGN AND CONSTRUCTION OF ELIGIBLE DRINKING WATER IMPROVEMENT PROJECTS AND ACTIVITIES TO PROTECT HUMAN HEALTH. AS PART OF THIS AGREEMENT, THE RECIPIENT ENSURES COMPLIANCE WITH FEDERAL AND STATE REGULATIONS, WHICH ARE DESIGNED TO PROTECT PUBLIC HEALTH. THIS GRANT AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $54,183,000, OF WHICH INCLUDES THE FY21 BASE DWSRF RE-ALLOTMENT OF $911,000 AND $352,500 FOR EPA IN-KIND. PRE-AWARD COSTS ARE APPROVED BACK TO 7/1/23.ACTIVITIES:THE DWSRF WILL BE USED FOR LOANS AND OTHER AUTHORIZED ASSISTANCE TO PUBLIC WATER SYSTEMS FOR ELIGIBLE PROJECTS, INCLUDING IMPROVING DRINKING WATER TREATMENT, WATER DISTRIBUTION, IMPROVING SOURCE OF WATER SUPPLY, REPLACING OR CONSTRUCTING FINISHED WATER STORAGE TANKS, AND OTHER INFRASTRUCTURE PROJECTS NEEDED TO PROTECT PUBLIC HEALTH. THE RECIPIENT MAY ALSO USE SOME OF THE FUNDING FOR SPECIFIC 'SET-ASIDES' TO PROVIDE TECHNICAL ASSISTANCE TO SMALL SYSTEMS, PROGRAM ADMINISTRATION, STATE PROGRAM MANAGEMENT AND OTHER ALLOWABLE USES.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S DWSRF. THE FUND CAN THEN BE USED TO INCREASE TECHNICAL, FINANCIAL AND MANAGERIAL CAPACITY OF PUBLIC WATER SYSTEMS, AND PROVIDE ASSURANCE OF A CLEANER AND SAFER POTABLE WATER SUPPLY BY FUNDING IMPROVEMENTS TO MULTIPLE WATER INFRASTRUCTURE PROJECTS. THESE PUBLIC HEALTH BENEFITS WILL BE STATEWIDE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $54.2M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD. SAFE DRINKING WATER ACT (SDWA): SECTION 1452 AND INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) PL 117-58 AUTHORIZES THE STATE TO UTILIZE FUNDS TO FURTHER THE HEALTH PROTECTION OBJECTIVES OF SDWA. THIS AGREEMENT WILL PROVIDE FUNDS TO CAPITALIZE THE RECIPIENT'S DRINKING WATER STATE REVOLVING FUND (DWSRF) WITH AN EMPHASIS ON LEAD SERVICE LINE REPLACEMENT AND ASSOCIATED ACTIVITIES DIRECTLY CONNECTED TO THE IDENTIFICATION, PLANNING, DESIGN, AND REPLACEMENT OF LEAD SERVICE LINES. AS PART OF THIS AGREEMENT, THE STATE ENSURES COMPLIANCE WITH FEDERAL AND STATE REGULATIONS, WHICH ARE DESIGNED TO PROTECT PUBLIC HEALTH. THIS GRANT AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $28,650,000 WHICH INCLUDES $8,308,500 IN EPA IN-KIND. PRE-AWARD COSTS ARE APPROVED BACK TO 7/1/23. ACTIVITIES:THE STATE HAS SUBMITTED AN INTENDED USE PLAN (IUP) AS PART OF THE APPLICATION PACKAGE FOR THIS CAPITALIZATION GRANT. THIS AGREEMENT WILL PROVIDE FUNDS TO CAPITALIZE THE RECIPIENT'S DWSRF WITH AN EMPHASIS ON LEAD SERVICE LINE REPLACEMENT AND ASSOCIATED ACTIVITIES DIRECTLY CONNECTED TO THE IDENTIFICATION, PLANNING, DESIGN, AND REPLACEMENT OF LEAD SERVICE LINES. THIS IUP CONTAINS A LIST OF THE CAPITAL PROJECTS THAT MAY RECEIVE FUNDING FROM THIS GRANT AND A DESCRIPTION OF THE ELIGIBLE ACTIVITIES FUNDED BY THE SET-ASIDES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE BENEFITS OF THIS GRANT WILL BE TO CAPITALIZE THE RECIPIENT'S DWSRF WITH AN EMPHASIS ON LEAD SERVICE LINE REPLACEMENT AND ASSOCIATED ACTIVITIES DIRECTLY CONNECTED TO THE IDENTIFICATION, PLANNING, DESIGN, AND REPLACEMENT OF LEAD SERVICE LINES. THE FUND CAN BE USED TO DEVELOP OR UPDATE LEAD SERVICE LINE INVENTORIES AND PROVIDE TECHNICAL ASSISTANCE TO SMALL WATER SYSTEMS UNDERTAKING LEAD SERVICE LINE INVENTORIES OR CONSTRUCTION PROJECTS. THESE PUBLIC HEALTH BENEFITS WILL BE STATEWIDE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $28.6M | — |
| DESCRIPTION:THE PRIMARY PURPOSE OF THIS GRANT IS TO CAPITALIZE THE RECIPIENT'S CLEAN WATER STATE REVOLVING FUND (CWSRF) PROGRAM WITH A PRIMARY PURPOSE TO ADDRESS EMERGING CONTAMINANTS. EMERGING CONTAMINANTS REFER TO SUBSTANCES AND MICROORGANISMS, INCLUDING MANUFACTURED OR NATURALLY OCCURRING PHYSICAL, CHEMICAL, BIOLOGICAL, RADIOLOGICAL, OR NUCLEAR MATERIALS, WHICH ARE KNOWN OR ANTICIPATED IN THE ENVIRONMENT, THAT MAY POSE NEWLY IDENTIFIED OR RE-EMERGING RISKS TO HUMAN HEALTH, AQUATIC LIFE, OR THE ENVIRONMENT. THESE SUBSTANCES, MICROORGANISMS OR MATERIALS CAN INCLUDE MANY DIFFERENT TYPES OF NATURAL OR MANUFACTURED CHEMICALS AND SUBSTANCES - SUCH AS THOSE IN SOME COMPOUNDS OF PERSONAL CARE PRODUCTS, PHARMACEUTICALS, INDUSTRIAL CHEMICALS, PESTICIDES, AND MICROPLASTICS. THIS PROJECT IS FUNDED UNDER THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA). SECTION 302 OF THE SAFE DRINKING WATER ACT AMENDMENTS OF 1996, 42 U.S.C. 300J-12, AND SUBSEQUENT PUB. L. 109-54, TITLE II, AUG 2, 2005, 119 STAT. 530 ALLOWS FOR THE TRANSFER OF THESE FUNDS TO THE DWSRF AT CALIFORNIA'S REQUEST. THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD HAS PROVIDED SUCH A REQUEST AND HAS PROVIDED THE NECESSARY DOCUMENTATION. THE CW FEDERAL FUNDS IN THE AMOUNT OF $15,208,000 WILL BE AWARDED AS EPA IN-KIND AND AFTER GRANT ACCEPTANCE THE FUNDS WILL BE REPROGRAMMED AND AWARDED TO CALIFORNIA IN THE DW EMERGING CONTAMINANTS GRANT. THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD WILL LOAN THE FUNDS OUT IN CALIFORNIA ENTIRELY AS ADDITIONAL SUBSIDY, CONSISTENT WITH THE LAW, TO PROTECT WATER QUALITY AND PUBLIC HEALTH IN CALIFORNIA AND TO VITALIZE THE ECONOMY THROUGH THE CREATION OF JOBS. THIS PROCESS SATISFIES THE STATUTORY REQUIREMENT THAT THE CWSRF AWARD BE MADE PRIOR TO THE FUNDS TRANSFER. ACTIVITIES:THE FULL ALLOTMENT WILL BE TRANSFERRED TO THE DWSRF EMERGING CONTAMINANTS GRANT TO THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD. THE ACTIVITIES ARE TO PROVIDE LOW INTEREST FINANCING TO NUMEROUS SUBRECIPIENTS FOR COST ELIGIBLE UNDER SECTION 1452 OF THE SAFE DRINKING WATER ACT (SDWA) AND THE PRIMARY PURPOSE MUST BE TO ADDRESS EMERGING CONTAMINANTS.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE FINANCING PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE WATER QUALITY IMPROVEMENT AND PROTECTION PROJECTS. THE EXPECTED OUTCOMES ARE TO IMPROVE AND PROTECT WATER QUALITY WITH AN EMPHASIS ON EMERGING CONTAMINANTS. THE INTENDED BENEFICIARIES INCLUDE CITIZENS THROUGHOUT THE STATE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $15.2M | — |
| DESCRIPTION:THE PRIMARY PURPOSE OF THIS GRANT IS TO CAPITALIZE THE RECIPIENT'S CLEAN WATER STATE REVOLVING FUND (CWSRF) PROGRAM TO ADDRESS EMERGING CONTAMINANTS. EMERGING CONTAMINANTS REFER TO SUBSTANCES AND MICROORGANISMS, INCLUDING MANUFACTURED OR NATURALLY OCCURRING PHYSICAL, CHEMICAL, BIOLOGICAL, RADIOLOGICAL, OR NUCLEAR MATERIALS, WHICH ARE KNOWN OR ANTICIPATED IN THE ENVIRONMENT, THAT MAY POSE NEWLY IDENTIFIED OR RE-EMERGING RISKS TO HUMAN HEALTH, AQUATIC LIFE, OR THE ENVIRONMENT. THESE SUBSTANCES, MICROORGANISMS OR MATERIALS CAN INCLUDE MANY DIFFERENT TYPES OF NATURAL OR MANUFACTURED CHEMICALS AND SUBSTANCES - SUCH AS THOSE IN SOME COMPOUNDS OF PERSONAL CARE PRODUCTS, PHARMACEUTICALS, INDUSTRIAL CHEMICALS, PESTICIDES, AND MICROPLASTICS. THIS PROJECT IS FUNDED UNDER THE INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA). SECTION 302 OF THE SAFE DRINKING WATER ACT AMENDMENTS OF 1996, 42 U.S.C. 300J-12, AND SUBSEQUENT PUB. L. 109-54, TITLE II, AUG 2, 2005, 119 STAT. 530 ALLOWS FOR THE TRANSFER OF THESE FUNDS TO THE DWSRF AT CALIFORNIA'S REQUEST. THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD HAS PROVIDED SUCH A REQUEST AND HAS PROVIDED THE NECESSARY DOCUMENTATION. THE CW FEDERAL FUNDS IN THE AMOUNT OF $15,208,000 WILL BE AWARDED AS EPA IN-KIND AND AFTER GRANT ACCEPTANCE THE FUNDS WILL BE REPROGRAMMED AND AWARDED TO CALIFORNIA IN THE DW EMERGING CONTAMINANTS GRANT. THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD WILL LOAN THE FUNDS OUT IN CALIFORNIA ENTIRELY AS ADDITIONAL SUBSIDY, CONSISTENT WITH THE LAW, TO PROTECT WATER QUALITY AND PUBLIC HEALTH IN CALIFORNIA AND TO VITALIZE THE ECONOMY THROUGH THE CREATION OF JOBS. THIS PROCESS SATISFIES THE STATUTORY REQUIREMENT THAT THE CWSRF AWARD BE MADE PRIOR TO THE FUNDS TRANSFER. ACTIVITIES:THE FULL ALLOTMENT WILL BE TRANSFERRED TO THE DWSRF EMERGING CONTAMINANT GRANT TO THE CALIFORNIA STATE WATER RESOURCES CONTROL BOARD. THE RECIPIENTS OF THESE FUNDS WILL PROVIDE LOW INTEREST FINANCING TO NUMEROUS SUBRECIPIENTS FOR COSTS ELIGIBLE UNDER SECTION 603(C) OF THE CLEAN WATER ACT, WITH THE PRIMARY PURPOSE OF ADDRESSING EMERGING CONTAMINANTS.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE FINANCING PLANNING, DESIGN, AND CONSTRUCTION OF ELIGIBLE WATER QUALITY IMPROVEMENT AND PROTECTION PROJECTS. THE EXPECTED OUTCOMES ARE TO IMPROVE AND PROTECT WATER QUALITY WITH AN EMPHASIS ON EMERGING CONTAMINANTS. THE INTENDED BENEFICIARIES INCLUDE CITIZENS THROUGHOUT THE STATE. | California (EPA federal awards) | STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD | $15.2M | — |
| THIS AGREEMENT PROVIDES FUNDING TO IMPLEMENT A PROGRAM OF VOLUNTARY TESTING FOR LEAD IN DRINKING WATER AT LOCAL CHILD CARE CENTERS. SPECIFICALLY, THE RECIPIENT WILL CONDUCT DRINKING WATER TESTING, PROVIDE EDUCATIONAL OUTREACH TO THE CHILD CARE CENTER COMMUNITY ON LEAD HAZARDS, COMMUNICATE TESTING RESULTS, AND SUPPORT FOLLOW-UP CORRECTIONS AS NEEDED. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $6,137,000. SEE TERMS AND CONDITIONS. PREAWARD COSTS HAVE BEEN APPROVED BACK TO JULY 1, 2020. | California (EPA federal awards) | DEPARTMENT OF SOCIAL SERVICES CALIFORNIA | $8.4M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE COACHELLA WATER DISTRICT TO IMPLEMENT ITS PROJECT FOR THE WATER TRANSMISSION AND CONSOLIDATION PROJECT AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT AND THE 2023 CONSOLIDATED APPROPRIATIONS ACT. THE EPA GRANT COMBINES FUNDS FROM TWO APPROPRIATIONS: FY22 $2,700,000 AND FY23 $3,452,972 FOR TOTAL FEDERAL FUNDING OF $6,152,972. THE RECIPIENT'S COST SHARE WAIVER REQUESTS WERE APPROVED BY EPA ON AUGUST 25, 2023. PREAWARD COSTS ARE APPROVED BACK TO JULY 1, 2024. SEE TERMS AND CONDITIONS. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE: 1) DESIGN: CVWD HAS RETAINED A CONSULTANT TO DESIGN THE VALLEY VIEW WATER CONSOLIDATION PROJECT. THE PROJECT IS CURRENTLY AT THE 30% DESIGN STATUS. 60%, 90% AND FINAL DESIGN PACKAGES WILL BE PREPARED INCLUDING ENGINEERS' COST ESTIMATES. ONCE DESIGN IS COMPLETE, CVWD WILL ADVERTISE BIDS AND SELECT A CONTRACTOR TO CONSTRUCT THE PROJECT. DELIVERABLES: 30%, 60%, 90% AND FINAL DESIGN PACKAGES 2) ENVIRONMENTAL DOCUMENTATION: CVWD PREPARED THE VALLEY VIEW WATER CONSOLIDATION PROJECT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION (IS/MND) AS WELL AS THE SUBSEQUENT IS/MND, TO EVALUATE THE PROJECT. DURING THE DESIGN PROCESS, A PIPELINE WAS REALIGNED AND IS BEING ADDRESSED IN AN ADDENDUM. THE ENVIRONMENTAL DOCUMENTS WERE AND ARE BEING PREPARED TO ADDRESS THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) AS WELL AS FEDERAL CROSSCUTTERS. DELIVERABLES: VALLEY VIEW WATER CONSOLIDATION PROJECT IS/MND, SUBSEQUENT IS/MND, AND ADDENDUM 3) CONSTRUCTION: CVWD WILL EXECUTE A CONTRACT WITH A CONTRACTOR AND ISSUE NOTICE TO PROCEED. THE CONTRACTOR WILL CONSTRUCT THE PROJECT PER THE FINAL PLANS AND SPECIFICATIONS. DELIVERABLES: PHOTOGRAPHIC DOCUMENTATION OF PROGRESS; PHOTOGRAPHIC DOCUMENTATION OF COMPLETION.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE DESIGN OF THE WATER TRANSMISSION AND CONSOLIDATION PROJECT WHICH ARE EXPECTED TO LEAD TO IMPROVED DRINKING WATER QUALITY FOR THE RESIDENCE OF THE COACHELLA VALLEY. | California (EPA federal awards) | COACHELLA VALLEY WATER DISTRICT PUBLIC FACILITIES CORPORATION | $6.2M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO CITY OF FULLERTON TO IMPLEMENT THE WELL A CONSTRUCTION PROJECT AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. THE PROJECT IS TO EQUIP A NEWLY DRILLED WELL WITH A HIGH-CAPACITY PUMP, MOTOR, ASSOCIATED VALVES, AND PROVIDE A STRUCTURAL FOUNDATION AND SOUND ENCLOSURE AT THE CITY'S MAIN PLANT WATER PRODUCTION SITE, LOCATED IN THE CITY OF ANAHEIM. WELL 7 HAS REMAINED OFFLINE SINCE APRIL 2014 DUE TO POOR WATER QUALITY AND PRODUCTION. IN DECEMBER 2014, THE CITY DRILLED A NEW DEEP WATER WELL TO REPLACE WELL 7 TO INCREASE GROUNDWATER SUPPLY. THE WELL 7A CONSTRUCTION PROJECT (PROJECT) WILL EQUIP THE NEW WELL AND PROVIDE THE INFRASTRUCTURE NECESSARY TO SUPPLEMENT DRINKING WATER SUPPLY TO THE CITY OF FULLERTON. THIS AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $959,752. PREAWARD COSTS ARE APPROVED BACK TO MARCH 15, 2025. SEE TERMS AND CONDITIONS. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A DRINKING WATER INFRASTRUCTURE PROJECT: WELL 7A CONSTRUCTION PROJECT: WELL EQUIPPING AND PROJECT CONSTRUCTION: TRENCH AND EXCAVATION SAFETY MEASURES SITE WORK SOUND ENCLOSURE - STRUCTURAL FOUNDATION AND PADS SOUND ENCLOSURE - PANELS WELL PUMP AND APPURTENANCES WELL AND YARD PIPING AND VALVESSUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE THE CITY OF FULLERTON. THE EXPECTED OUTCOMES INCLUDE: - CONSTRUCTION SUBMITTALS, CONSTRUCTION - FINAL CONSTRUCTION AS-BUILTS - A POST-CONSTRUCTION ON-SITE PROJECT REVIEW - QUARTERLY PROGRESS REPORTS - A DRAFT AND FINAL PROJECT REPORT THE EXPECTED OUTCOMES INCLUDE: INCREASED DRINKING WATER AVAILABILITY IMPROVED DRINKING WATER QUALITY REDUCED ENERGY CONSUMPTION | California (EPA federal awards) | CITY OF FULLERTON | $960K | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF LOMITA FOR THE REPLACEMENT OF EXISTING WATER MAINS ALONG FOUR STREETS IN THE CITY OF LOMITA: NARBONNE AVENUE, WALNUT STREET, EBONY LANE, AND 247TH PLACE AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT FOR THIS PROJECT. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $940,000. SEE TERMS AND CONDITIONS. THE EXISTING WATER MAINS WILL BE ABANDONED IN PLACE, AND NEW WATER MAINS WILL BE INSTALLED. AS A PART OF THE NEW WATER MAIN CONSTRUCTION, MANHOLE LIDS, VAULT BOXES, HYDRANTS, AND WATER METER LIDS WILL ALSO BE INSTALLED. CONSTRUCTION WILL INCLUDE MOBILIZATION, TRENCHING, PIPE ABANDONMENT, PIPE INSTALLATION AND TESTING, BACKFILLING, PAVEMENT REMOVAL, PAVEMENT REPLACEMENT, STRIPING, AND DEMOBILIZATION. THE NARBONNE SOUTH PORTION OF THE PROJECT REPLACES A TOTAL OF APPROXIMATELY 1,600 LINEAR FEET OF WATER MAIN ALONG NARBONNE AVENUE WITH AN EXPECTED CONSTRUCTION DURATION OF 6 MONTHS. THE ZONE G PORTION OF THE PROJECT, INCLUDING APPROXIMATELY 5,000 LINEAR FEET OF WATER MAINS ALONG WALNUT STREET, EBONY LANE, AND 247TH PLACE, IS EXPECTED TO HAVE A CONSTRUCTION DURATION OF 9 MONTHS. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $940,000. SEE TERMS AND CONDITIONS. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF THE CONSTRUCTION FOR THE REPLACEMENT OF THE WATER MAINS. ACTIVITIES CONSIST OF THE ABANDONMENT OF THE CURRENT WATER MAIN, INSTALLATION OF THE NEW WATER MAIN, AS WELL AS THE INSTALLATION OF MANHOLE LIDS, VAULT BOXES, HYDRANTS, AND WATER METER LIDS. CONSTRUCTION WILL INCLUDE MOBILIZATION, TRENCHING, PIPE ABANDONMENT, PIPE INSTALLATION AND TESTING, BACKFILLING, PAVEMENT REMOVAL, PAVEMENT REPLACEMENT, STRIPING, AND DEMOBILIZATION. THE NARBONNE SOUTH PORTION OF THE PROJECT REPLACES A TOTAL OF APPROXIMATELY 1,600 LINEAR FEET OF WATER MAIN ALONG NARBONNE AVENUE WITH AN EXPECTED CONSTRUCTION DURATION OF 6 MONTHS. THE ZONE G PORTION OF THE PROJECT, INCLUDES APPROXIMATELY 5,000 LINEAR FEET OF WATER MAINS ALONG WALNUT STREET, EBONY LANE, AND 247TH PLACE, IS EXPECTED TO HAVE A CONSTRUCTION DURATION OF APPROXIMATELY 9 MONTHS.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLE INCLUDES THE SUCCESSFUL INSTALLATION AND OPERATION OF NEW WATER MAINS THAT WILL BE VERIFIED BY PRESSURE TESTS AND WATER QUALITY TESTS TO MAKE SURE THE WATER RUNNING THROUGH THE NEW PIPES MEETS DRINKING WATER QUALITY STANDARDS, SPECIFICALLY CALIFORNIA TITLE 22 SAMPLE TESTING. THE EXPECTED OUTCOMES INCLUDE SAFE AND RELIABLE DRINKING WATER QUALITY. THE INTENDED BENEFICIARIES INCLUDE THE CITIZENS OF THE CITY OF LOMITA IN THE COUNTY OF LOS ANGELES IN CALIFORNIA. | California (EPA federal awards) | CITY OF LOMITA | $940K | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $3,950,000 TO THE CITY OF GUSTINE TO IMPLEMENT ITS PROJECT TO CONSTRUCT THE TANK AND BOOSTER PUMP STATION IMPROVEMENTS AND WATER LOOP LINE COMPLETION PROJECT AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION. PREAWARD COSTS ARE APPROVED BACK TO 1/1/2026. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A DRINKING WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF: CONVEYANCE SYSTEM IMPROVEMENTS, PUMP STATION UPGRADES, AND INCREASED WATER STORAGE CAPACITY. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE PROCUREMENT AND CONSTRUCTION OF THE WATER STORAGE TANK, BOOSTER PUMP STATION IMPROVEMENTS AND WATER LOOP LINE COMPLETION PROJECT. THE EXPECTED OUTCOMES INCLUDE A NEW WATER STORAGE TANK, BOOSTER PUMP STATION IMPROVEMENTS AND WATER LOOP LINE COMPLETION. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS OF THE CITY OF GUSTINE. | California (EPA federal awards) | CITY OF GUSTINE | $4.0M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO CANYON LAKE WATER TREATMENT PLANT IMPROVEMENT PROJECT (CLWTP). THE CLWTP, LOCATED IN ELSINORE VALLEY MUNICIPAL WATER DISTRICT (EVMWD), CALIFORNIA, WAS SHUT DOWN IN 2020 IN RESPONSE TO ELEVATED PFAS LEVELS. THE PURPOSE OF THE PROJECT INVOLVES INSTALLING TREATMENT UPGRADES AT THE CLWTP TO ALLOW FOR REOPERATION OF THE FACILITY. THE EXISTING INTAKE PUMP STATION WILL BE COMPLETELY REPLACED WITH A NEW INTAKE PUMP STATION, FLOATING BARGE, ELECTRICAL BUILDING, AND RAW WATER PIPELINE. THE STATIC AND RAPID MIXERS WILL BE REPLACED TO ACCOMMODATE 7MGD CAPACITY AND MAINTAIN A MINIMUM OF 30 SECOND DETENTION TIME. FERRIC SULFATE AND POLYMER WILL BE ADDED AT THE RAPID MIX PROCESS TO SUPPORT TOTAL ORGANIC CARBON (TOC) REMOVAL THROUGH ENHANCED COAGULATION. THE UP-FLOW CLARIFIER WILL BE REPLACED WITH A NEW FLOCCULATION AND SEDIMENTATION BASIN EQUIPPED WITH PLATE SETTLERS CAPABLE OF OPERATING AT THE RAW WATER FLOW OF 7 MGD. CHEMICAL SYSTEMS WILL BE ADDED INCLUDING FERRIC SULFATE, POTASSIUM PERMANGANATE, AND POLYMER. PFAS TREATMENT WILL BE ADDED AFTER THE DUAL MEDIA FILTRATION AND WILL REQUIRE BOOSTER PUMPING POTENTIALLY PRECEDED BY A WEIR, TO ACCOMMODATE INCREASED HEAD FROM THE TREATMENT SYSTEM. THE PROJECT WILL BE COMPLETED WITHIN AN EXISTING WATER TREATMENT FACILITY. PHASE 1 IS A PLANNING PHASE AND PHASE 2, (FY23) IS THE CONSTRUCTION PHASE. THIS AGREEMENT PROVIDES PHASED FEDERAL FUNDING IN THE AMOUNT OF $780,000. PREAWARD COSTS HAVE BEEN APPROVED BACK TO 2/1/2025. ACTIVITIES:THE ACTIVITIES TO BE DESIGNED INVOLVE INSTALLING TREATMENT UPGRADES AT THE CLWTP TO ALLOW FOR REOPENING AND OPERATION OF THE FACILITY. THE EXISTING INTAKE PUMP STATION WILL BE COMPLETELY REPLACED WITH A NEW INTAKE PUMP STATION, FLOATING BARGE, ELECTRICAL BUILDING, AND RAW WATER PIPELINE. THE STATIC AND RAPID MIXERS WILL BE REPLACED TO ACCOMMODATE 7MGD CAPACITY AND MAINTAIN A MINIMUM OF 30 SECOND DETENTION TIME. FERRIC SULFATE AND POLYMER WILL BE ADDED AT THE RAPID MIX PROCESS TO SUPPORT TOTAL ORGANIC CARBON (TOC) REMOVAL THROUGH ENHANCED COAGULATION. THE UP-FLOW CLARIFIER WILL BE REPLACED WITH A NEW FLOCCULATION AND SEDIMENTATION BASIN EQUIPPED WITH PLATE SETTLERS. CHEMICAL SYSTEMS WILL BE ADDED INCLUDING FERRIC SULFATE, POTASSIUM PERMANGANATE, AND POLYMER. PFAS TREATMENT WILL BE ADDED AFTER THE DUAL MEDIA FILTRATION. THE PROJECT WILL BE COMPLETED WITHIN AN EXISTING WATER TREATMENT FACILITY.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE DELIVERABLE IS AN IMPROVED CAPACITY AT THE FACILITY AND REOPEN THE CLWTP. THE OUTCOME WILL PROVIDE FRESH DRINKING WATER WITH A SIGNIFICANT REDUCTION IN PFAS TO COMMUNITY MEMBERS IN ELSINORE AND CANYON LAKE, CALIFORNIA. | California (EPA federal awards) | ELSINORE VALLEY MUNICIPAL WATER DISTRICT | $3.8M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO VALLEY CENTER MUNICIPAL WATER DISTRICT TO IMPLEMENT ITS PROJECT FOR A PIPELINE REPLACEMENT AS DIRECTED IN THE 2023 AND 2024 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $3,775,000. SEE TERMS AND CONDITIONS. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A DRINKING WATER INFRASTRUCTURE IMPROVEMENT PROJECT FOCUSED ON PIPELINE REPLACEMENT. WORKPLAN ACTIVITIES CONSIST OF CONVEYANCE SYSTEM IMPROVEMENTS, INCLUDING THE REPLACEMENT OF AGING WATER DISTRIBUTION PIPELINES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE COMPLETION OF 100% DESIGN PLANS AND SPECIFICATIONS, INSTALLATION OF A NEW WATER MAIN AND ASSOCIATED APPURTENANCES, POST-CONSTRUCTION SITE REVIEW, QUARTERLY PROGRESS REPORTS, AND SUBMISSION OF A FINAL PROJECT REPORT. THE EXPECTED OUTCOME OF THE REPLACEMENT OF THE PIPELINE INCLUDES INCREASE WATER SERVICE RELIABILITY BY REDUCING THE POSSIBILITY OF CATASTROPHIC PIPELINE FAILURE. THE INTENDED BENEFICIARIES INCLUDE THE RESIDENTS SERVED BY THE VALLEY CENTER MUNICIPAL WATER DISTRICT. | California (EPA federal awards) | VALLEY CENTER MUNICIPAL WATER DISTRICT | $3.8M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO CITY OF FRESNO TO INCREASE DRINKING WATER SYSTEM RESILIENCE TO NATURAL HAZARDS. THE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $3,700,214. SEE GENERAL TERMS AND CONDITIONS.ACTIVITIES:THE ACTIVITIES INCLUDE PLANNING, DESIGN, CONSTRUCTION OF COPPER PIPING TO REPLACE DETERIORATED POLYETHYLENE PIPES IN THE CITY'S DRINKING WATER DISTRIBUTION SYSTEM.SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE APPROXIMATELY 891 SERVICE LINES (OR APPROXIMATELY 20,025 LINEAR FEET) OF FAILING POLYETHYLENE PIPES REPLACED WITH COPPER PIPES; MORE TIMELY SUPPLY LINE REPLACEMENTS; INCREASED RESILIENCY TO NATURAL HAZARDS; INCREASED DROUGHT AWARENESS; AND PIPE COST SAVINGS. THE EXPECTED OUTCOMES INCLUDE WATER SAVINGS OF APPROXIMATELY 58.5 ACRE#8208;FEET AT PROJECT COMPLETION; IMPROVED SYSTEM WATER SUPPLY AND WATER ENVIRONMENT. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS OF THE CITY OF FRESNO. | California (EPA federal awards) | FRESNO, CITY OF | $3.7M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO STANISLAUS COUNTY TO CONSTRUCT A NEW COMBINED DOMESTIC WATER SYSTEM FOR PROVIDING POTABLE WATER AND FIRE PROTECTION FOR THE BUSINESS PARK AND COMMUNITY OF CROWS LANDING AND COMPLETE TOPSIDE IMPROVEMENTS FOR TWO WELLS AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. THIS AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $3,452,972. THE RECIPIENT COST SHARE OF $863,243 IS WAIVED FOR THIS AWARD. PREAWARD COSTS ARE APPROVED BACK TO 11/05/2025. SEE TERMS AND CONDITIONS. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A DRINKING WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF THE ADMINISTRATION OF THE CONSTRUCTION CONTRACT, LABOR COMPLIANCE, CONSTRUCTION MANAGEMENT, ENVIRONMENTAL COMPLIANCE, AND ACTUAL CONSTRUCTION. CONSTRUCTION INCLUDES WELL SYSTEM IMPROVEMENTS CONSISTING OF THE INSTALLATION OF A NEW WELL PUMP AND MOTOR, TREATMENT/DISINFECTION FACILITIES, SITE IMPROVEMENTS, ELECTRICAL WORK, AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) INSTALLATION. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE ADVERTISEMENTS FOR BIDS BY CONSTRUCTION CONTRACTORS, CONSTRUCTION CONTRACT WITH THE SELECTED BIDDER, A POST-CONSTRUCTION ON-SITE PROJECT REVIEW BY THE EPA (OR DELEGATE), AND QUARTERLY AND FINAL REPORTS. THE EXPECTED OUTCOMES INCLUDE INCREASED WATER AVAILABILITY AND DECREASED DEPARTMENT OF ENVIRONMENTAL RESOURCES VIOLATIONS, REDUCED CSD STAFF TIME SPENT ON OPERATIONS AND RESPONDING TO OPERATIONAL ISSUES, AND WATER SUPPLY RELIABILITY. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS AND STAFF OF CROWS LANDING INDUSTRIAL BUSINESS PARK. | California (EPA federal awards) | COUNTY OF STANISLAUS | $3.5M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF SACRAMENTO TO IMPLEMENT ITS SHASTA GROUNDWATER WELLS PROJECT AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $3,452,972. PRE-AWARD COSTS ARE APPROVED BACK TO MAY 27, 2025. SEE TERMS AND CONDITIONS.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE CONSTRUCTION OF THE SHASTA GROUNDWATER WELLS PROJECT TO PROVIDE DRINKING WATER INFRASTRUCTURE IMPROVEMENTS IN THE CITY OF SACRAMENTO, CA. WORKPLAN ACTIVITIES CONSIST OF: TASK 1 - PLANNING AND DESIGN, TASK 2 - CONSTRUCTION AND ACTIVATION, TASK 3 - PROJECT MANAGEMENT AND CONTROLS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE:100% DESIGN PLANS AND SPECIFICATIONS; A POST-CONSTRUCTION ON-SITE PROJECT REVIEW BY EPA (OR DELEGATE); QUARTERLY PROGRESS REPORTS; AND A DRAFT AND FINAL PROJECT REPORT. THE EXPECTED OUTCOMES INCLUDE INCREASED GROUNDWATER TREATMENT CAPACITY FROM 3,000-GPM TO 5,000-GPM; ADDITIONAL ANNUAL VOLUME OF GROUNDWATER AVAILABLE FOR CONSUMPTION, REDUCED CITY STAFF TIME SPENT MANUALLY OPERATING AND MAINTAINING FACILITY; AND MONTHLY LABOR HOURS REDUCED 300 HRS/MONTH. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS OF THE CITY OF SACRAMENTO. | California (EPA federal awards) | CITY OF SACRAMENTO | $3.5M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO CITY OF RIPON FOR THE SOUTH SAN JOSE JOAQUIN IRRIGATION DISTRICT (SSJID) SURFACE WATER CONNECTION PROJECT AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $3,452,972. PREAWARD COSTS ARE APPROVED BACK TO 2/1/2026. REFER TO TERMS AND CONDITIONS.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE INSTALLATION OF A NEW WATER MAIN TO CONNECT THE CITY TO THE SOUTH SAN JOAQUIN IRRIGATION DISTRICT'S (SSJID'S) TREATED SURFACE WATER SYSTEM TO IMPROVE THE CITY'S DRINKING WATER INFRASTRUCTURE. WORKPLAN ACTIVITIES CONSIST OF (1) PRE-CONSTRUCTION ACTIVITIES, FUNDED ENTIRELY BY THE CITY, AND (2) CONSTRUCTION AND PROJECT MANAGEMENT, FUNDED THROUGH THE EPA COMMUNITY GRANT AND THE CITY'S COST SHARE. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE --100% DESIGN PLANS AND SPECIFICATIONS --REQUEST FOR PROPOSALS (RFP) -- CONTRACTOR CONTRACT -- STORM WATER POLLUTION PREVENTION PLAN (SWPPP) --AS-BUILTS --A POST-CONSTRUCTION ON-SITE PROJECT REVIEW BY EPA (OR DELEGATE) --QUARTERLY PROGRESS REPORTS -- A DRAFT AND FINAL PROJECT REPORT THE EXPECTED OUTCOMES INCLUDE (1) INCREASED WATER AVAILABLE FOR CONSUMPTION DUE TO ACCESS TO NEW WATER SOURCE; ADDITIONAL TARGET ANNUAL VOLUME OF WATER AVAILABLE FOR CONSUMPTION 1305 MG/YEAR. (2) REDUCED ENERGY CONSUMPTION--TARGET QUANTITY OF OF ENERGY SAVED IS 660 MWH/MG. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS AND BUSINESSES IN THE CITY OF RIPON. | California (EPA federal awards) | CITY OF RIPON | $3.5M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO BORREGO WATER DISTRICT TO IMPLEMENT ITS PROJECT FOR THE BORREGO SPRINGS ROAD TRANSMISSION MAIN AND SUN GOLD PIPELINE REPLACEMENT PROJECTS AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $3,392,667.00. REFER TO TERMS AND CONDITIONS.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE: 1) PREPARATION OF NEPA DOCUMENTS INCLUDING BIOLOGICAL AND CULTURAL RESOURCES; 2) PREPARATION OF PLANS AND SPECS PLUS BID PACKAGE; AND 3) FINAL REPORT TO EPA. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES ARE NEPA DOCUMENTS AND BID DOCUMENTS WHICH ARE EXPECTED TO LEAD TO IMPROVED DRINKING WATER FOR THE RESIDENTS OF THE BORREGO WATER DISTRICT. | California (EPA federal awards) | BORREGO WATER DISTRICT PUBLIC FACILITIES CORPORATION | $3.4M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO HOOPA VALLEY TRIBE UNDER THE SAFE DRINKING WATER ACT (SDWA): SECTION 1452 AND INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA) (PL 117-58). THE PURPOSE OF THIS AGREEMENT IS TO IMPLEMENT PROJECTS AND ACTIVITIES THAT ASSIST PUBLIC WATER SYSTEMS SERVING TRIBES TO COMPLY WITH NATIONAL PRIMARY DRINKING WATER REGULATIONS (NPDWRS) OR OTHERWISE FURTHER THE HEALTH PROTECTION OBJECTIVES OF THE SDWA. SPECIFICALLY, THE RECIPIENT WILL REPLACE AND REHABILITATION DRINKING WATER TANKS AND BOOSTER STATIONS AT THE HOOPA VALLEY PUBLIC UTILITIES DISTRICT. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT $3,341,903. SEE TERMS AND CONDITIONS. ACTIVITIES:THE ACTIVITIES INCLUDE THE CONSTRUCTION OF MULTIPLE DRINKING WATER TANKS, BOOSTER STATIONS, ASSOCIATED PIPING, VALVING, TANK DISINFECTION, AND OTHER ASSOCIATED INFRASTRUCTURE AND ACTIVITIES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE VID DOCUMENTATION, DOCUMENTATION OF CONSTRUCTION PROGRESS, INCLUDING A FINAL REPORT. THE EXPECTED OUTCOMES INCLUDE THE COMPLETION OF CONSTRUCTION AND A FINAL REPORT DOCUMENTING PROJECT COMPLETION. THE INTENDED BENEFICIARIES INCLUDE CUSTOMERS OF THE HOOPA VALLEY PUBLIC WATER UTILITIES DISTRICT. | California (EPA federal awards) | HOOPA VALLEY PUBLIC UTILITIES DISTRICT | $3.3M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF ATWATER TO IMPLEMENT ITS PROJECT TO EXTEND DRINKING WATER AND WASTEWATER UTILITIES BETWEEN BUHACH ROAD AND GURR ROAD ON GREEN SANDS ROAD AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. THIS AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $3,000,000. THE RECIPIENT'S COST SHARE WAIVER REQUEST HAS BEEN APPROVED BY EPA ON JUNE 28, 2023. PREAWARD COSTS ARE APPROVED BACK TO APRIL 1, 2026. SEE TERMS AND CONDITIONS. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A DRINKING WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF EXPANSION OF DRINKING AND WASTEWATER PIPELINES AND LIFT STATION. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE RFPS FOR DESIGN AND CONSTRUCTION, DESIGN AND CONSTRUCTION CONTRACTS, COMPLETE DESIGN PLANS, SWPPP, AND QUARTERLY REPORTING. THE EXPECTED OUTCOMES INCLUDE DELIVERY OF CLEAN DRINKING WATER TO CUSTOMERS AND TREATED WASTEWATER, REDUCED ENERGY CONSUMPTION, AND WATER/SEWER CONSOLIDATION. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS OF ATWATER AND GREATER MERCED COUNTY. | California (EPA federal awards) | CITY OF ATWATER | $3.0M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FEDERAL FUNDING IN THE AMOUNT OF $2,840,000 TO THE CITY OF SAN BUENAVENTURA (VENTURA WATER) TO IMPLEMENT ITS PROJECT TO COMPLETE A SECTION OF THE A STATE WATER INTERCONNECTION PROJECT AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. PREAWARD COSTS ARE APPROVED BACK TO 12/22/2025. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A DRINKING WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF: GRANT ADMINISTRATION, GRANT AGREEMENT EXECUTION, PERFORMANCE REPORTING, AND FINANCIAL REPORTING, PIPELINE INSTILLATION, HORIZONTAL DIRECTIONAL DRILLING. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE: PERFORMANCE REPORTS, FINAL PERFORMANCE REPORT, FINANCIAL REPORTS, FINAL FINANCIAL REPORT, CONSTRUCTION NOTICE TO PROCEED, CONSTRUCTION PHOTOS, AND ENGINEER'S CERTIFICATION . THE EXPECTED OUTCOMES INCLUDE: THE PROJECT WILL PROVIDE ACCESS TO UP TO 13,150 AFY OF SWP SUPPLIES AND AN EXPECTED LONG-TERM AVERAGE OF 6,500 AFY. THESE VALUES ARE BASED ON THE CITY'S AND UWCD'S EXISTING SWP ENTITLEMENTS OF 10,000 AFY AND 3,150 AFY, RESPECTIVELY, AND SWP DELIVERY CAPABILITY ESTIMATES PRODUCED BY THE CALIFORNIA DEPARTMENT OF WATER RESOURCES (TECHNICAL ADDENDUM TO THE STATE WATER PROJECT FINAL DELIVERY CAPABILITY REPORT 2019 [AUGUST 26, 2020], TABLE B-32). THE CITY'S CURRENT ENTITLEMENT IS LIMITED TO 2,000 AFY DUE TO A 20-YEAR LEASE AGREEMENT WITH SAN GORGONIO PASS WATER AGENCY. THE PROJECT WILL ENABLE DELIVERY OF WATER FROM THE CITY'S SYSTEM INTO CALLEGUAS' SYSTEM, PROVIDING A CRITICAL ALTERNATIVE WATER SUPPLY IN THE EVENT OF AN IMPORTED SUPPLY DISRUPTION (DUE TO EARTHQUAKE, INFRASTRUCTURE FAILURE, OR OTHER CAUSES). SPECIFICALLY, THE PROJECT WILL ALLOW THE CITY TO DELIVER UP TO 13 CUBIC FEET PER SECOND OF WATER TO CALLEGUAS DURING AN IMPORTED WATER OUTAGE, WHICH CAN THEN BE DELIVERED TO SELECT CALLEGUAS CUSTOMERS. THE PROJECT WILL IMPROVE THE CITY'S ABILITY TO MEET SECONDARY WATER QUALITY STANDARDS FOR TDS OF 1,000 MG/L IN THE EAST END OF THE CITY, INCLUDING THE UNINCORPORATED AREA OF SATICOY, WHICH IS WITHIN THE CITY'S SPHERE OF INFLUENCE. GROUNDWATER FROM THE SANTA PAULA BASIN IS SERVED TO EAST END CUSTOMERS BUT IS HIGHLY MINERALIZED AND DOES NOT CURRENTLY MEET SECONDARY STANDARDS FOR TDS, SULFATES, AND CONDUCTIVITY. CURRENTLY, TDS CONCENTRATIONS AVERAGE AROUND 1,300 MG/L. WITH THE PROJECT, THE CITY WILL BE ABLE TO BLEND SWP WATER, WHEN AVAILABLE, WITH GROUNDWATER FROM THE SANTA PAULA BASIN PRIOR TO DELIVERY TO CUSTOMERS TO IMPROVE WATER QUALITY AND MEET SECONDARY WATER QUALITY STANDARDS. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS OF THE CITY OF SAN BUENAVENTURA. | California (EPA federal awards) | CITY OF SAN BUENAVENTURA | $2.8M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO SOLANO IRRIGATION DISTRICT TO IMPLEMENT ITS PROJECT TO DESIGN AND CONSTRUCT A NEW DRINKING WATER WELL AND SERVICE LINE CONNECTING THE NEW WELL TO THE EXISTING DISTRIBUTION SYSTEM WITHIN QUAIL CANYON AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $2,824,000. PRE-AWARD COSTS ARE APPROVED BACK TO 06/21/2023. SEE TERMS AND CONDITIONS.ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE REPLACING AN OLD AND UNDERPRODUCING DRINKING WATER WELL WITHIN THE QUAIL CANYON IMPROVEMENT DISTRICT (QUAIL CANYON) SERVICE AREA, ALONG WITH INSTALLATION OF A NEW SERVICE LINE CONNECTING THE NEW WELL TO THE EXISTING DISTRIBUTION SYSTEM. WORKPLAN ACTIVITIES CONSIST OF: - TASK 1 - PLANNING AND DESIGN - TASK 2 - PROJECT CONSTRUCTION AND IMPLEMENTATION - TASK 3 - PROJECT MANAGEMENT AND CONTROLS SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE - 100% DESIGN PLANS AND SPECIFICATIONS - A POST-CONSTRUCTION ON-SITE PROJECT REVIEW BY EPA (OR DELEGATE) - QUARTERLY PROGRESS REPORTS - A FINAL PROJECT REPORT THE EXPECTED OUTCOMES INCLUDE: (1) INCREASED WATER AVAILABLE FOR CONSUMPTION DUE TO NEW WELL REPLACING EXISTING FAILING WELL; AND (2) ABILITY TO ADD ADDITIONAL CUSTOMERS WITH FAILING DOMESTIC WELLS IN THE AREA DEPENDING UPON FINAL RELIABLE WELL OUTPUT AT CONCLUSION OF PROJECT THE INTENDED BENEFICIARIES INCLUDE THE COMMUNITY (RESIDENTS AND BUSINESSES) IN THE QUAIL CANYON SERVICE AREA. | California (EPA federal awards) | SOLANO IRRIGATION DISTRICT | $2.8M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE HOOPA TRIBE. SECTION 1452 OF THE SAFE DRINKING WATER ACT (SDWA) AUTHORIZES THE STATE TO UTILIZE FUNDS TO FURTHER THE HEALTH PROTECTION OBJECTIVES OF SDWA. THE RECIPIENT WILL EVALUATE OPTIONS TO IMPROVE THE DRINKING WATER INTAKE STRUCTURE ON THE TRINITY RIVER. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $192,322.00.ACTIVITIES:THE GRANT WILL BE USED TO IMPROVE SECURITY AND RESILIENCE OF THE INTAKE ON THE TRINITY RIVER FOR PWS 090605067. WORK INCLUDES INSTALLATION OF CAMERAS, SECURITY, AND RIPRAP. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLE INCLUDE A PRELIMINARY ENGINEERING REPORT DESCRIBING ALTERNATIVES. THE PRELIMINARY ENGINEERING REPORT MAY BE USED TO APPLY FOR FUNDING IN THE FUTURE. THIS MAY RESULT IN CONSTRUCTION OF A MORE RESILIENT DRINKING WATER INTAKE. | California (EPA federal awards) | HOOPA VALLEY PUBLIC UTILITIES DISTRICT | $192K | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $2,500,000 TO CARMICHAEL WATER DISTRICT TO CONSTRUCT THE LADERA ASR WELL AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT. PREAWARD COSTS ARE APPROVED BACK TO 6/1/2025. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A DRINKING WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF CONSTRUCTION OF THE NEW ASR WELL, NECESSARY ABOVEGROUND IMPROVEMENTS AND ASSOCIATED PUMPING STATION UPGRADES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE A NEW OPERATIONAL ASR WELL AT THE LADERA SITE IN CARMICHAEL WATER DISTRICT. THE EXPECTED OUTCOMES INCLUDE INCREASED DRINKING WATER RELIABILITY DURING DROUGHT PERIODS AND MORE SECURE OPERATIONAL FLEXIBILITY TO MEET CURRENT WATER DEMANDS. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS OF CARMICHAEL WATER DISTRICT SERVICE AREA. | California (EPA federal awards) | CARMICHAEL WATER DISTRICT | $2.5M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO PICO RIVERA WATER AUTHORITY TO IMPLEMENT ITS PROJECT TO INSTALL 3-UNITS OF AQUEOUS VETS LIQUID PHASE ADSORPTION SYSTEMS DESIGNED TO TREAT CONTAMINATED PROCESS STREAMS TO REMOVE PERFLUOROOCTANE SULFONIC ACID (PFOS) AND PERFLUOROOCTANOIC ACID (PFOA) FROM POTABLE WATER AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $2,500,000. PRE-AWARD COSTS ARE APPROVED BACK TO MARCH 1, 2025. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED ARE THE DESIGN OF THE POLYFLUOROALKYL SUBSTANCES (PFAS) TREATMENT SYSTEM, CONSTRUCTION, CONSTRUCTION MANAGEMENT, AND INSPECTION SERVICES. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE DESIGN PLANS, CONSTRUCTION, START-UP, AND COMMISSIONING UNDER THE AMENDED PERMIT ISSUED BY THE CALIFORNIA DIVISION OF DRINKING WATER FOR (THE RESIDENTS AND CUSTOMERS OF PICO RIVERA. | California (EPA federal awards) | CITY OF PICO RIVERA | $2.5M | — |
|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| California (EPA federal awards) | CITY OF SANTA FE SPRINGS | $2.2M | — |
| DESCRIPTION:THE AGREEMENT PROVIDES FUNDING TO THE HOOPA VALLEY PUBLIC UTILITIES DISTRICT TO ASSIST THE PUBLIC WATER SYSTEM IN MEETING THE REQUIREMENTS OF THE SAFE DRINKING WATER ACT (SDWA). SPECIFICALLY, THE RECIPIENT WILL REPLACE TWO ANTIQUATED WATER STORAGE TANK FACILITIES WITH IDENTIFIED DEFICIENCIES TO DELIVER SAFE DRINKING WATER TO THE COMMUNITY. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $603,799.ACTIVITIES:THE ACTIVITIES INCLUDE FINAL DESIGN COMPLETION, COMPLETION OF BID DOCUMENTS, SELECTION OF A CONTRACTOR, DEMOLITION OF THE EXISTING TANKS, CONSTRUCTION OF THE NEW TANKS, AND PURCHASE OF A CONSTRUCTION VEHICLE. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE DESIGN SPECIFICATIONS, CONSTRUCTION CONTRACT, COMPLETE BID DOCUMENTS, INSPECTION REPORTS, PROGRESS PHOTOS, TESTING RESULTS, AND CERTIFICATE OF FINAL COMPLETION. THE EXPECTED OUTCOMES INCLUDE COMPLETED CONSTRUCTION OF THE TWO DRINKING WATER STORAGE TANKS. THE INTENDED BENEFICIARIES INCLUDE CUSTOMERS OF THE HOOPA VALLEY PUBLIC WATER SYSTEM. | California (EPA federal awards) | HOOPA VALLEY PUBLIC UTILITIES DISTRICT | $2.2M | — |
| DESCRIPTION:THE PURPOSE OF THIS GRANT IS TO PROVIDE FUNDING TO SAN JOAQUIN COUNTY TO IMPLEMENT ITS LINCOLN VILLAGE MAINTENANCE DISTRICT WATER SYSTEM IMPROVEMENTS PROJECT AS DIRECTED IN THE 2024 CONSOLIDATED APPROPRIATIONS ACT. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $2,000,000.00. EPA APPROVED RECIPIENT'S COST SHARE WAIVER REQUEST ON 5/12/2025. PRE-AWARD COSTS ARE APPROVED BACK TO APRIL 1, 2026. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE REPLACEMENT OF AGING WATER MAINS TO IMPROVE DRINKING WATER INFRASTRUCTURE BY IMPROVING DRINKING WATER QUALITY AND CONSERVING WATER. WORKPLAN ACTIVITIES INCLUDE: 1. REPLACE APPROXIMATELY 5,033 FEET OF AGING AND LEAKING PIPELINES AND INSTALL NECESSARY VALVES 2. REPLACE 16 FIRE HYDRANTS 3. UPGRADE 91 WATER SERVICE CONNECTIONS WITH ALL REQUIRED APPURTENANCES 4. UPGRADE THE THREE EXISTING INTERCONNECTIONS WITHIN THE LINCOLN VILLAGE WATER SYSTEM SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE BID PACKAGE; PLANS/DRAWINGS; CONTRACT AWARD; CONSTRUCTION PROGRESS REPORTS; PHOTOGRAPHIC DOCUMENTATION; PROJECT FINAL REPORT. THE EXPECTED OUTCOMES INCLUDE REDUCE ENERGY CONSUMPTION, AND MINIMIZE WATER LOSSES, AND IMPROVE DRINKING WATER QUALITY. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS AND BUSINESSES IN THE LINCOLN VILLAGE MAINTENANCE DISTRICT SERVICE AREA. | California (EPA federal awards) | COUNTY OF SAN JOAQUIN | $2.0M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO WEST VALLEY WATER DISTRICT TO IMPLEMENT ITS PROJECT THE BLOOMINGTON ALLEYWAY PIPELINE PROJECT AS DIRECTED IN THE 2022 CONSOLIDATED APPROPRIATIONS ACT. ACTIVITIES INCLUDE DESIGN AND CONSTRUCT A NEW WATER MAIN AND INSTALL FIRE HYDRANTS WITHIN THE DISTRICT'S BLOOMINGTON SERVICE AREA. THIS ASSISTANCE AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $2,000,000. RECIPIENT'S COST SHARE WAIVER REQUEST WAS APPROVED BY EPA ON 8/15/2025. SEE TERMS AND CONDITIONS. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A DRINKING WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF DESIGN AND CONSTRUCTION OF A NEW WATER MAIN AND INSTALL FIRE HYDRANTS WITHIN THE DISTRICT'S BLOOMINGTON SERVICE AREA. CONSTRUCTION ACTIVITIES INCLUDE PROJECT STAGING, SURFACE AND INFRASTRUCTURE PREPARATION, EXCAVATION, EXISTING MAIN ISOLATION, AND INSTALLATION OF THE NEW MAIN AND HYDRANTS INSTALLATION. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE CONSTRUCTION CONTRACT, A SWPPP, AS-BUILTS. PROGRESS AND COMPLETION OF THESE DELIVERABLES WILL BE DOCUMENTED IN QUARTERLY PROJECT REPORTS. THE EXPECTED OUTCOMES INCLUDE INCREASED CUSTOMER SATISFACTION BECAUSE DISTRICT STAFF WILL BE ABLE TO ACCESS THE WATER SERVICE METERS TO ADDRESS CUSTOMER CONCERNS, REDUCED DISTRICT STAFF TIME SPENT RESPONDING TO INFRASTRUCTURE FAILURES AND SERVICE METER MAINTENANCE/READS. THE INTENDED BENEFICIARIES INCLUDE RESIDENTS OF BLOOMINGTON AND WVWD STAFF. | California (EPA federal awards) | WEST VALLEY WATER DISTRICT | $2.0M | — |
| DESCRIPTION:THIS AGREEMENT PROVIDES FUNDING TO THE CITY OF CHINO TO IMPLEMENT TREATMENT MEASURES FOR RAW WATER FROM WELLS 12 AND 14 AND CONSTRUCT A STATE-OF-THE-ART CENTRALIZED GROUNDWATER TREATMENT PLANT. THIS WORK ENSURES REACTIVATION OF WELLS 12 AND 14 AND ALLEVIATES THE CITY'S RELIANCE ON A SOURCE OF IMPORTED WATER WHILE ADDRESSING CURRENT CONTAMINANTS AS WELL AS EMERGING CONTAMINANTS IN THE WATER SUPPLY, AS DIRECTED IN THE 2023 CONSOLIDATED APPROPRIATIONS ACT OR AS IDENTIFIED IN AN APPROVED TECHNICAL CORRECTION IF ONE HAS BEEN APPROVED FOR THIS PROJECT. THIS AGREEMENT PROVIDES FULL FEDERAL FUNDING IN THE AMOUNT OF $2,000,000. PREAWARD COSTS ARE APPROVED BACK TO 5/27/2025. REFER TO TERMS AND CONDITIONS. ACTIVITIES:THE ACTIVITIES TO BE PERFORMED INCLUDE THE EXECUTION AND IMPLEMENTATION OF A DRINKING WATER INFRASTRUCTURE CONSTRUCTION PROJECT. WORKPLAN ACTIVITIES CONSIST OF DESIGN, ENVIRONMENTAL, ENGINEERING CONSTRUCTION SUPPORT AND CONSTRUCTION SERVICES (PRE-TREATMENT EQUIPMENT, GAC SYSTEM, REGENERABLE ION EXCHANGE SYSTEM, REPLACEMENT OF GROUNDWATER WELL EQUIPMENT AND CONTROL INTEGRATION AS WELL AND BRINE WASTE PIPELINES, WATER LINES AND FIBER OPTIC LINES) WHICH WILL PROVIDE WATER TREATMENT PLANT IMPROVEMENTS. SUBRECIPIENT:NO SUBAWARDS ARE INCLUDED IN THIS ASSISTANCE AGREEMENT.OUTCOMES:THE ANTICIPATED DELIVERABLES INCLUDE CONSTRUCTION AND DESIGN BID DOCUMENTS, QUARTERLY REPORTS DOCUMENTING PROGRESS, AND A FINAL REPORT TO DOCUMENT COMPLETION OF CONSTRUCTION. THE EXPECTED OUTCOMES INCLUDE THE DESIGN, ENVIRONMENTAL, ENGINEERING CONSTRUCTION SUPPORT AND CONSTRUCTION SERVICES (PRETREATMENT EQUIPMENT, GAC SYSTEM, REGENERABLE ION EXCHANGE SYSTEM, REPLACEMENT OF GROUNDWATER WELL EQUIPMENT AND CONTROL INTEGRATION AS WELL AND BRINE WASTE PIPELINES, WATER LINES AND FIBER OPTIC LINES). THIS WILL ENHANCE THE CITY'S WATER SUPPLY RESILIENCE AND PROVIDE CLEAN DRINKING WATER. THE INTENDED BENEFICIARIES INCLUDE THE COMMUNITY OF THE CITY OF CHINO. | California (EPA federal awards) | CITY OF CHINO | $2.0M | — |