Arizona dam reservoir contracts
31 contracts tracked across 1 municipality.
Contracts
31
municipalities
1
Distinct vendors
26
municipalities with the most dam reservoir contracts
Top vendors in Arizona dam reservoir
| Vendor | Contracts | Volume |
|---|---|---|
| HARTMAN-WALSH PAINTING COMPANY | 2 | $6.1M |
| EMPIRE SOUTHWEST, LLC | 2 | $16K |
| SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT | 2 | $154.1M |
| ARIZONA STATE UNIVERSITY | 2 | $1.0M |
| PRECISION CRANE & HOIST SERVICES, INC. | 2 | $19K |
| NEXUS POWER SOLUTIONS LLC | 1 | $2.0M |
Recent dam reservoir contracts in Arizona
| Title | municipality | Vendor | Value | Solicitation |
|---|---|---|---|---|
| LOWER ARIZONA PENSTOCK RECOATING (HOOVER DAM, AZ SIDE) | Arizona (Bureau of Reclamation federal awards) | HARTMAN-WALSH PAINTING COMPANY | $5.7M | — |
| URGENT KA5A TRANSFORMER DAMAGE REPAIR & REHAB (HOOVER DAM) | Arizona (Bureau of Reclamation federal awards) | NEXUS POWER SOLUTIONS LLC | $2.0M | — |
| PROGRAMMATIC AGREEMENT DEVELOPMENT FOR THE VERDE RESERVOIR SEDIMENT MITIGATION PROJECT | Arizona (Bureau of Reclamation federal awards) | LOGAN SIMPSON DESIGN INC. | $365K | — |
| GLEN CANYON DAM - WATER, SEWER AND ELECTRICAL SERVICES - 10 YEAR UTILITY | Arizona (Bureau of Reclamation federal awards) | PAGE UTILITY ENTERPRISES | $300K | — |
| BPA CALL FOR DAVIS DAM EMERGENCY GENERATOR SERVICE YR 1 | Arizona (Bureau of Reclamation federal awards) | EMPIRE SOUTHWEST, LLC | $10K | — |
| DAVIS DAM EMERGENCY GENERATOR REPAIR | Arizona (Bureau of Reclamation federal awards) | EMPIRE SOUTHWEST, LLC | $6K | — |
| DAVIS DAM FY24 LIFECYCLE DESKTOP | Arizona (Bureau of Reclamation federal awards) | STERLING COMPUTERS CORPORATION | $1K | — |
| THE PROPOSED SALT RIVER PROJECTCENTRAL ARIZONA PROJECT SRPCAP INTERCONNECTION FACILITY SCIF WILL IMPROVE REGIONAL WATER SYSTEM REDUNDANCY AND FLEXIBILITY, WHILE INCREASING THE ABILITY TO USE AND MOVE ELIGIBLE NONPROJECT WATER SUPPLIES STORED IN THE SALT RIVER FEDERAL RECLAMATION PROJECT SRFRP SYSTEM TO DELIVERY POINTS ALONG THE CAP CANAL. THE SCIF WOULD ALLOW FOR DELIVERY OF WATER FROM THE SRP SYSTEM INTO THE CAP CANAL, CREATING CONNECTIVITY WITH THE COLORADO RIVER SYSTEM BY BOTH DIRECT DELIVERIES AND EXCHANGES. THIS SINGLE INTERCONNECTION IS AN EFFICIENT MEANS FOR FURTHER DEVELOPMENT OF REGIONAL REDUNDANCY AND FLEXIBILITY BY LEVERAGING THE EXISTING 336MILE CAP CANAL TO ALLOW USERS ALONG THE CAP AND ALONG THE COLORADO RIVER TO EXCHANGE WATER SUPPLIES WITH USERS ON THE SRFRP WITHOUT BUILDING NEW, LENGTHY CANALS AND PIPELINES. THE REDUNDANCY AND OPERATIONAL FLEXIBILITY CREATED BY THE SCIF WOULD CREATE SIGNIFICANT PUBLIC VALUE IN MANAGING CENTRAL ARIZONAS WATER SUPPLIES THROUGH AN INCREASINGLY UNCERTAIN FUTURE OF DROUGHT AND SURFACE WATER SHORTAGES. THE TOTAL POTENTIAL ANNUAL WATER DELIVERY THROUGH THE SCIF IS APPROXIMATELY 360,000ACRE FEET AF, ALLOWING ELIGIBLE NONPROJECT SUPPLIES STORED WITHIN SRPS RESERVOIR SYSTEMS AND WATER SERVICE AREA TO BE MOVED OR EXCHANGED OVER A BROADER GEOGRAPHIC AREA. MORE THAN FOUR MILLION AF OF SURFACE WATER HAS BEEN STORED UNDERGROUND IN SRPS WATER SERVICE AREA AND IN INTERCONNECTED IRRIGATION DISTRICTS LIKE THE ROOSEVELT WATER CONSERVATION DISTRICT RWCD AND THE ROOSEVELT IRRIGATION DISTRICT RID. THE SCIF COULD ALLOW EXISTING WELL INFRASTRUCTURE TO BE USED TO RECOVER PREVIOUSLY STORED SURFACE WATER AND ALLOW FOR EXCHANGES TO OCCUR WITHIN BOTH CAPS AND SRPS WATER SYSTEMS. OTHER SUPPLIES IN SRPS SYSTEM THAT ARE ELIGIBLE TO BE USED OUTSIDE OF SRPS WATER SERVICE AREA OR ELIGIBLE FOR STORAGE UNDERGROUND COULD BE MOVED THROUGH THE SCIF INTO THE CAP CANAL TO FACILITATE UPSTREAM AND DOWNSTREAM DELIVERIES AT LOCATIONS CONNECTED TO THE CAP CANAL.THE REDUNDANCY AND OPERATIONAL FLEXIBILITY CREATED BY THE SCIF WILL CREATE SIGNIFICANT PUBLIC VALUE IN MANAGING CENTRAL ARIZONAS WATER SUPPLIES, WHERE THERE ARE MANY DISADVANTAGED COMMUNITIES, THROUGH AN INCREASINGLY UNCERTAIN FUTURE OF DROUGHT AND SURFACE WATER SHORTAGES.THE RECIPIENT WILL COMPLETE THE DESIGN AND CONSTRUCTION OF THE SCIF. UNDER THIS AGREEMENT, ONLY ACTIVITIES DURING THE CONSTRUCTION PHASE OF THE PROJECT WILL BE FUNDED. THE PROJECT WILL INCLUDE A PUMPING PLANT WITH A MAXIMUM DESIGN CAPACITY UP TO 500 CUBIC FEET PER SECOND CFS AND CONDUIT CONNECTING THE SRFRPS SOUTH CANAL TO THE CENTRAL ARIZONA WATER CONSERVATION DISTRICTS CAWCD GRANITE REEF AQUEDUCT. THE FACILITYS INTAKE WILL BE FED BY A TURNOUT FROM THE EXISTING SOUTH CANAL LEADING TO A SEDIMENTATION BASIN AND DEBRIS SCREENS UPSTREAM OF THE PUMP STATION FOREBAY. THE PUMP STATION WILL MOVE WATER THROUGH APPROXIMATELY 3,000 FEET OF DISCHARGE PIPELINES FROM THE PUMPING STATION TO THE DISCHARGE STRUCTURE ON THE CAP CANAL A VERTICAL LIFT OF NEARLY 200 FT. THE DISCHARGE STRUCTURE IS A 140FOOTLONG X 98FOOTWIDE CONCRETE BASIN WITH OVERFLOW WEIR. | Arizona (Bureau of Reclamation federal awards) | SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT | $154.0M | — |
| THIS PROJECT WILL DEVELOP A LONG SHORT-TERM MEMORY MODEL USING NEAR-DAILY CUBESAT DATA, GROUND OBSERVATIONS, AND LIDAR SNOW MAPS FROM THE AIRBORNE SNOW OBSERVATORIES, INC., TO GENERATE AN ADVANCED SNOW ESTIMATION PRODUCT. APPLIED FOR THE FIRST TIME IN ARIZONA, AIRBORNE SNOW OBSERVATORIES, INC. SNOW MAPS WILL BE USED TO ENHANCE A PROCESS-BASED DISTRIBUTED HYDROLOGIC MODEL. THE PROJECT WILL USE THE HIGH-RESOLUTION HYDROLOGIC MODEL TO TRANSLATE WEATHER AND SNOWPACK CONDITIONS TO FORECASTED INFLOWS TO A RESERVOIR SYSTEM. THIS COLLABORATIVE EFFORT BETWEEN ARIZONA STATE UNIVERSITY AND THE SALT RIVER PROJECT WILL IMPROVE SNOW ESTIMATION IN FORESTED ENVIRONMENTS FOR WATER SUPPLY, FLOOD HAZARD, AND WATER RESILIENCE FORECASTING. AS THE LARGEST WATER SUPPLIER FOR THE PHOENIX METROPOLITAN AREA, SALT RIVER PROJECT OPERATES SIX RESERVOIRS IN THE SALT AND VERDE RIVER BASIN. THIS MODELING APPROACH WILL PROVIDE SALT RIVER PROJECT WITH NEW WATER SUPPLY FORECASTING CAPABILITIES. A SNOW WATER EQUIVALENT PRODUCT WILL BE DEVELOPED FROM NEAR-DAILY PLANETSCOPE (3-METER, 8-BAND) AND SKYSAT (0.5-METER, 4-BAND) MULTISPECTRAL IMAGERY MERGED WITH GROUND AND AERIAL DATA (SNOW TELEMETRY, SNOWTOGRAPHY, LIDAR SURVEYS) AND CONSTRAINED BY DAILY, HIGH-RESOLUTION SNOW WATER EQUIVALENT FROM THE HYDROLOGIC MODEL THROUGH THE LONG SHORT-TERM MEMORY APPROACH. THE LONG SHORT-TERM MEMORY SNOW WATER EQUIVALENT PRODUCT WILL BE COMPARED TO AN INDEPENDENT GRIDDED PRODUCT AND THEN APPLIED TO INITIALIZE THE SNOW WATER SUPPLY FORECASTS THAT GENERATE RESERVOIR INFLOWS FOR SHORT-, MEDIUM-, AND LONG-LEAD TIMES. OUTCOMES WILL BE INCORPORATED INTO THE SALT RIVER PROJECT RESERVOIR OPERATIONS PLAN. | Arizona (Bureau of Reclamation federal awards) | ARIZONA STATE UNIVERSITY | $974K | — |
| GLEN CANYON DAM ADAPTIVE MANAGEMENT PROGRAM GCDAMP - NAVAJO NATION PARTICIPATION AND MONITORING | Arizona (Bureau of Reclamation federal awards) | NAVAJO NATION TRIBAL GOVERNMENT | $606K | — |
| THE RECIPIENT AND SUBCONTRACTOR WILL PERFORM ACTIVITIES TOWARDSREESTABLISHING GILA RIVER DIVERSIONS AT SACATON DIVERSION DAM FEASIBILITY ANALYSIS AND 30%DESIGN PROJECT. THE FOLLOWING TASKS FOR THIS SCOPE OF WORK WILL BE:MILESTONE TASK ACTIVITY 1: PROJECT MANAGEMENT DATA COLLECTION GILA RIVER FLOW EVALUATION STRUCTURAL COMPETENCE ASSESSMENT SACATON DIVERSION DAM MODIFICATION DESIGN SDD ALTERNATIVES EVALUATION SDD PRELIMINARY DESIGN GRAVITY PIPELINE AND RESERVOIR DESIGN PUMP STATION DESIGN PRESSURIZED PIPELINE DESIGN 30% SUBMITTAL PACKAGE | Arizona (Bureau of Reclamation federal awards) | GILA RIVER INDIAN COMMUNITY | $319K | — |
| EO 14398 DAVIS DAM SEWER EVAPORATION POND RELINING - TASK ORDER | Arizona (Bureau of Reclamation federal awards) | JAMES F THOMSON JR | $700K | — |
| HULSEY DAM HER | Arizona (Bureau of Reclamation federal awards) | WHEELER MACHINERY CO | $127K | — |
| IGF::OT::IGF - OTHER FUNCTIONS -REFUSE/RECYCLE COLLECTION&REMOVAL FOR THE GLEN CANYON DAM FIELD DIVISION FOR A BASE AND FOUR ONE YEAR OPTIONS. | Arizona (Bureau of Reclamation federal awards) | ALLIED WASTE SERVICES OF PAGE, INC. | $88K | — |
| TRASH AND RECYCLE SERVICES FOR DAVIS DAM - OY | Arizona (Bureau of Reclamation federal awards) | ALLIED WASTE TRANSPORTATION, INC. | $31K | — |
| THE RECIPIENT WILL PLAN AND DESIGN FOR CONSTRUCTION AND OPERATION OF NEW RAW WATER DELIVERY AND DOMESTIC DRINKING WATER TREATMENT FACILITIES FOR THE SAN CARLOS REGIONAL WATER SYSTEM WHICH SERVES THE CENTRAL PORTION OF THE RESERVATION IN EASTERN ARIZONA. THE MAJORITY OF THE TRIBAL POPULATION RESIDES IN THIS AREA WITHOUT ACCESS TO SAFE, CLEAN, AND RELIABLE DRINKING WATER. THESE COMMUNITIES SUFFER FREQUENT WATER SERVICE CURTAILMENTS OR COMPLETE SHUTDOWNS DUE TO POOR SOURCE GROUNDWATER QUALITY, ELECTRICAL OUTAGES, OR SYSTEM MECHANICAL FAILURES, OFTEN DURING THE HOT, SUMMER SEASON. FAMILIES MUST BOIL WATER OR FIND ALTERNATIVE MEANS TO MEET BASIC POTABLE WATER NEEDS FOR DRINKING, COOKING, WASHING CLEANING, AND SANITATION HYGIENE - SOMETIMES TRAVELING MANY MILES FROM HOME TO DO SO. PLANNING AND DESIGN WILL ANALYZE ALTERNATIVES AND DESIGN A WATER DELIVERY SYSTEM TO CONVEY WATER FROM AN EXISTING NEARBY RESERVOIR TO NEW TREATMENT FACILITIES FOR SUPPLY TO THESE UNDERSERVED HOMES, PROVIDING MORE RELIABLE ACCESS TO SAFE, CLEAN DRINKING WATER. THE PROJECT WILL DELIVER UP TO 100 PERCENT OF WATER NEEDED FOR DOMESTIC WATER PURPOSES FOR THESE COMMUNITIES. | Arizona (Bureau of Reclamation federal awards) | SAN CARLOS APACHE TRIBAL COUNCIL | $6.0M | — |
| THE SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT IN ARIZONA WILL DEVELOP A REAL TIME RESERVOIR OPERATIONS MODEL FOR THE SALT AND VERDE RIVERS THE MODEL WILL BE USED TO PREDICT CHANGES TO LAKE LEVELS BASED ON A CONTINUOUS RUNOFF SIMULATION, ENHANCING THE SALT RIVER PROJECT S ABILITY TO ANALYZE AND REACT TO FORECASTED HYDROLOGICAL EVENTS IN THE WATERSHEDS THAT IMPACT OPERATIONS AND INFRASTRUCTURE THE MODEL WILL FORECAST STREAMFLOW AT SPECIFIED LOCATIONS THAT DIRECTLY IMPACT RESERVOIR OPERATIONS, INFORMING OPERATIONS DECISIONS AND FACILITATING EARLY RESPONSES TO FLOODING CAUSED BY STORM EVENTS OR LANDSCAPE CHANGES CREATED BY WILDFIRE THE SALT RIVER PROJECT IS CARRYING OUT THE PROJECT WITH THE SUPPORT OF THE ARIZONA MUNICIPAL WATER USERS ASSOCIATION AND THE CITIES OF TEMPE, CHANDLER, AND SCOTTSDALE | Arizona (Bureau of Reclamation federal awards) | SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT | $133K | — |
| THE HISTORIC SITES ACT (SECTION 461) ESTABLISHES A NATIONAL POLICY TO PRESERVE FOR PUBLIC USE, HISTORIC AND ARCHEOLOGICAL SITES, OBJECTS, AND ANTIQUITIES OF NATIONAL SIGNIFICANCE FOR THE INSPIRATION AND BENEFIT OF THE PEOPLE OF THE UNITED STATES. CURATING THE COLLECTIONS WITH THE REPOSITORY ALLOWS ACCESS TO THE COLLECTION BY BOTH PRIVATE AND PUBLIC ENTERPRISES AND THE GENERAL PUBLIC. ACCESS TO THE COLLECTION IS USED FOR EDUCATIONAL PURPOSES, INSPIRATION, CULTURAL RESOURCES, RESEARCH, AND ENJOYMENT. CONTINUED CURATION OF THIS COLLECTION WILL PROVIDE IMPROVED ACCESS TO THIS RESOURCE. THE CENTER FOR ARCHAEOLOGY AND SOCIETY REPOSITORY (CASR) WILL CONTINUE TO PROVIDE LONG-TERM CURATION TO BOR COLLECTIONS. CASR WILL PROVIDE RECLAMATION WITH BOTH PHYSICAL AND ANY DIGITAL RECORDS AND ARCHIVES ASSOCIATED WITH NAVAJO RESERVOIR NAGPRA COLLECTIONS. RECLAMATION WILL TAKE CUSTODY OF THESE RECORDS AND ARCHIVES, AND CASR WILL RETAIN A DIGITAL RECORD OF THE TRANSFER AND DESTROY ANY TRANSFERRED DIGITAL RECORDS. CASR WILL ASSIST RECLAMATION WITH REPATRIATION TASKS FOR NAVAJO RESERVOIR NAGPRA COLLECTIONS, INCLUDING INVENTORY REVIEW, REHOUSING, AND OTHER TASKS AS REQUESTED. | Arizona (Bureau of Reclamation federal awards) | ARIZONA STATE UNIVERSITY | $70K | — |
| TAILBAY STOPLOG COATING (HOOVER DAM, AZ SIDE) | Arizona (Bureau of Reclamation federal awards) | HARTMAN-WALSH PAINTING COMPANY | $407K | — |
| GLEN CANYON DAM RE-KEY REQUIREMENT | Arizona (Bureau of Reclamation federal awards) | SCDATACOM, LLC | $54K | — |
| HOOVER DAM 2ND FLOOR BOOSTER PUMP REPLACEMENT | Arizona (Bureau of Reclamation federal awards) | PHOENIX PUMPS INC | $25K | — |
| HD/DD ANNUAL FIRE EXTINGUISHER INSPECTION & RECERTIFICATION - BPA CALL 3 - DAVIS DAM | Arizona (Bureau of Reclamation federal awards) | PAPER HEARTS LLC | $19K | — |
| DAVIS DAM 27-TON CRANE MOTOR REWIND | Arizona (Bureau of Reclamation federal awards) | PRECISION CRANE & HOIST SERVICES, INC. | $12K | — |
| DAVIS DAM 2026 ANNUAL CRANE INSPECTIONS | Arizona (Bureau of Reclamation federal awards) | PRECISION CRANE & HOIST SERVICES, INC. | $8K | — |
| CURATING THE COLLECTIONS WITH THE REPOSITORY ALLOWS ACCESS TO THE COLLECTION BY BOTH PRIVATE AND PUBLIC ENTERPRISES AND THE GENERAL PUBLIC. ACCESS TO THE COLLECTION IS USED FOR EDUCATIONAL PURPOSES, INSPIRATION, CULTURAL RESOURCES, RESEARCH AND ENJOYMENT. CONTINUED CURATION OF THIS COLLECTION WILL PROVIDE IMPROVED ACCESS TO THIS RESOURCE. FURTHER, THE INFORMATION GAINED BY THE RESEARCH INTO THE COLLECTIONS WILL BE USED TO SATISFY RECLAMATIONS OBLIGATIONS UNDER NAGPRA. THE PURPOSE OF THIS GRANT IS TO PROVIDE CURATION, AND TO INSPECT, INVENTORY, MAINTAIN, AND CONSERVE THE ARCHAEOLOGICAL COLLECTION AND TO REPATRIATE THOSE ITEMS THAT FALL UNDER THE NATIVE AMERICAN GRAVE PROTECTION AND REPATRIATION ACT (NAGPRA). THE BUREAU OF RECLAMATION GENERATES COLLECTIONS OF ARCHEOLOGICAL MATERIALS AND RECORDS IN ACCORDANCE WITH MULTIPLE FEDERAL LAWS. FOLLOWING 36 CFR 79, THESE FEDERAL PROPERTIES MUST BE CURATED BY A REPOSITORY OR MUSEUM MEETING DEPARTMENT OF THE INTERIOR STANDARDS. THE RECIPIENT MEETS THESE STANDARDS, AS WELL AS THOSE OF THE AMERICAN ASSOCIATION OF MUSEUMS. THE MUSEUM HAS CURATED THE COLLECTIONS FROM GLEN CANYON DAM, BECAUSE UNDER THE TERMS OF THE ORIGINAL AGREEMENTS BETWEEN THE UNITED STATES AND THE MUSEUM, THEY WERE STIPULATED TO RETAIN THE COLLECTIONS. ACTIVITIES INCLUDE FULL CURATION, ANNUAL INVENTORY OF THE COLLECTION, ACCESSION PROCESSING, DE-ACCESSION PROCESSING, FACILITY REPORT, AND SPECIAL PROCESSING AS REQUESTED. | Arizona (Bureau of Reclamation federal awards) | MUSEUM OF NORTHERN ARIZONA INC | $83K | — |
| DESIGN OF MAIN CANAL RE-REGULATION RESERVOIR, COLORADO RIVER IRRIGATION PROJECT | Arizona (Bureau of Reclamation federal awards) | COLORADO RIVER INDIAN TRIBES | $76K | — |
| LAND MANAGEMENT AND PUBLIC SAFETY SERVICES AT DAVIS DAM | Arizona (Bureau of Reclamation federal awards) | ACADIA PROTECTIVE SERVICES II, LLC | $1.9M | — |
| FY 25 ANNUAL CRANE INSPECTION - DAVIS DAM IAW ATTACHED STATEMENT OF WORK (SOW) | Arizona (Bureau of Reclamation federal awards) | GLOBEX CORP | $8K | — |
| TRIBAL MONITORING OF THE GRAND CANYON AND GLEN CANYON ENSURE THAT THE PRINCIPLES OF THE GRANDCANYON PROTECTION ACT ARE CARRIED OUT FOR THE PUBLIC GOOD. THE TRIBAL MONITORING PROGRAMPROVIDES VALUABLE INFORMATION ON THE HEALTH OF THESE CANYONS AND ENSURES THEIR PROTECTION FORFUTURE GENERATIONS. THE INPUT OF TRIBES DURING MEETINGS PROVIDES UNIQUE PERSPECTIVES BASED ON LONG AFFILIATION WITH THE CANYONS AND LEADS TO BETTER OUTCOMES PREDICATED ON TRIBAL-CENTRIC VALUES.THE SCOPE OF WORK BELOW DESCRIBES THE ACTIVITIES THAT SHALL BE CARRIED OUT BY THE TRIBE AS AN ACTIVE AND ENGAGED STAKEHOLDER IN THE GLEN CANYON DAM ADAPTIVE MANAGEMENT PROGRAM (GCDAMP). PARTICIPATION IN MEETINGS: ADAPTIVE MANAGEMENT WORK GROUP REPRESENTATIVE (OR AUTHORIZED ALTERNATE) OR TECHNICAL WORK GROUP REPRESENTATIVE (OR AUTHORIZED ALTERNATE), AS APPROPRIATE, SHALL ATTEND AND ACTIVELY PARTICIPATE IN THE FOLLOWING MEETINGS:1.ADAPTIVE MANAGEMENT WORK GROUP MEETINGS (MINIMUM 2 PER YEAR).2.TECHNICAL WORK GROUP (TWG) MEETINGS (MINIMUM 4 PER YEAR).3.BUDGET AD HOC (AS SCHEDULED).4.OTHER AMP AD HOC GROUP MEETINGS (AS SCHEDULED).5.PROGRAMMATIC AGREEMENT (PA) (AND HISTORIC PRESERVATION PLAN (HPP), AS SCHEDULED).6.DOCUMENTS REVIEW AND MEETING PREPARATION: THE GLEN CANYON DAM ADAPTIVE MANAGEMENT PROGRAM PRODUCES NUMEROUS DOCUMENTS WITHIN ANY GIVEN FISCAL YEAR THAT REQUIRE REVIEW AND COMMENT BY THE PARTICIPATING STAKEHOLDERS.7.GENERATION OF WRITTEN COMMENTS: IN ADDITION, PREPARATION FOR EACH MEETING OF THE GCDAMP SHALL OCCUR THROUGH THE REVIEW OF ALL DOCUMENTS POSTED FOR THE AMWG AND TWG MEETINGS.8.MILESTONE: A DELIVERABLE FOR THE GCDAMP PARTICIPATION IS TO PRODUCE AN ANNUAL PERFORMANCE EVALUATION REPORT FOR TRIBAL PARTICIPATION IN THE PROGRAM.II.MONITORING PROGRAM.HISTORIC PROPERTIES AND NATURAL RESOURCE MONITORING: THE PRIMARY GOAL OF THIS ACTIVITY IS TO MONITOR AND EVALUATE THE EFFECTS OF DAM OPERATIONS AND OTHER ACTIONS UNDER THE AUTHORITY OF THE SECRETARY OF THE INTERIOR ON HISTORIC PROPERTIES AND NATURAL RESOURCES IMPORTANT THE HOPI TRIBE. A SECONDARY GOAL IS TO CONDUCT CONDITION MONITORING OF HISTORIC PROPERTIES AND NATURAL RESOURCES TO ASSIST RECLAMATION IN COMPLIANCE WITH THE 2017 PA STIPULATION VI AND THE 2018 HPP. MILESTONE DELIVERABLES: ON AN ANNUAL BASIS, A REPORT DETAILING GRANTEE ACTIVITIES ON EACH RIVER TRIP AND WHETHER THE GOALS OF THE MONITORING PROGRAM HAVE BEEN ACCOMPLISHED.III.CULTURAL SENSITIVITY TRAINING.THIS PROJECT IS TO FUND TRIBAL EXPERTISE IN THE DEVELOPMENT OF A CULTURAL SENSITIVITY TRAINING GCDAMP FUNDED RESEARCHERS AND OTHER INTERESTED GCDAMP PARTICIPANTS. COMPLETION OF THIS PROJECT ALLOWS FOR COMPLIANCE WITH THE 2017 PA STIPULATION IV.A(9).IV.MISCELLANEOUS PROJECTS SUPPORTING THE PA AND HPP THE TRIBE PROPOSES TO ACCOMPLISH THE FOLLOWING ADDITIONAL TASKS OVER THE COURSE OF THE AGREEMENT THAT ARE CONSISTENT WITH THE TRIENNIAL WORK PLAN. THESE INCLUDE PROJECT D.9. HOPI GRAND CANYON (NGTUPQA) ORAL HISTORY PROJECT PROPOSAL AND FY23 SYNTHESIS PROJECT FROM REALLOCATED COVID FUNDS.FOR PROJECT D.9, THE HOPI CULTURAL PRESERVATION OFFICE (HCPO) IS PROPOSING A THREE-YEAR ETHNOGRAPHIC ORAL HISTORY PROJECT RELATED TO THE GRAND CANYON (NGTUPQA). THE PROJECT SHALL INVOLVE INTERVIEWING 20 HOPI ELDERS, TEN MEN AND TEN WOMEN ABOUT THEIR KNOWLEDGE OF THE GRAND CANYON. HCPO SHALL USE THE FUNDING TO PAY FOR NEW AUDIO AND VIDEO RECORDING EQUIPMENT, TO COMPENSATE FOR THE INTERVIEWEES TIME, AND TO HIRE ONE INDIVIDUAL TO RECORD AND TRANSCRIBE THESE INTERVIEWS.THE FY23 SYNTHESIS PROJECT FROM REALLOCATED COVID FUNDS PROJECT SERVES TO DIGITIZE PRE-2000 REPORTS AND TO ARCHIVE OVER 20 YEARS WORTH OF DOCUMENTATION IN A NEW MORE EASILY ACCESSED DIGITAL SYSTEM, AND PRODUCE A REPORT TO SYNTHESIZE THE DATA. RECLAMATION SHALL BE GIVEN A FINAL REPORT AND COPIES OF NON-SENSITIVE ARCHIVED MATERIALS. | Arizona (Bureau of Reclamation federal awards) | HOPI TRIBE | $505K | — |
| K12 DROP-ARM ROAD BARRIERS AT DAVIS DAM | Arizona (Bureau of Reclamation federal awards) | CUTTING EDGE CONTRACTORS INC | $1.4M | — |
| HULSEY DAM MATERIALS | Arizona (Bureau of Reclamation federal awards) | E. M. OIL TRANSPORT, INC. | $85K | — |