Arizona canal aqueduct contracts

20 contracts tracked across 1 municipality.

Contracts
20
municipalities
1
Distinct vendors
14

municipalities with the most canal aqueduct contracts

Top vendors in Arizona canal aqueduct

VendorContractsVolume
AC LOPEZ CONSTRUCTION INC4$5.0M
PALOMA IRRIGATION & DRAINAGE D3$250K
GILA RIVER INDIAN COMMUNITY2$6.2M
QUECHAN INDIAN TRIBE1$400K
GROVER'S HILL IRRIGATION DISTRICT1$93K
MARICOPA STANFIELD IRRIGATION1$61K

Recent canal aqueduct contracts in Arizona

TitlemunicipalityVendorValueSolicitation
MOD/MODE/US BYPASS CANAL REPAIRSArizona (Bureau of Reclamation federal awards)AC LOPEZ CONSTRUCTION INC$949K—
PURPOSE: TO PROVIDE A SOLAR COVER ARRAY OVER CASA BLANCA CANAL NEAR SACATON, AZ.ACTIVITIES TO BE PERFORMED: -NEPA REVIEW-PERMIT ACQUISITION-ENGINEERING DESIGN AND CONSULTATION-PRE-CONSTRUCTION-ORDER LONG-LEAD ITEMS-CONSTRUCTION AND INSTALLATION-CONSTRUCTION COMPLETION-DATA COLLECTION AND DISSEMINATION -COMPLETION AND FINAL REPORTEXPECTED DELIVERABLES OR OUTCOMES: THE RECIPIENT WILL COMPLETE A SOLAR ARRAY OVER THE CASA BLANCA CANAL NEAR SACATON, AZ.INTENDED BENEFICIARIES: THE UNITED STATES PUBLIC, INCLUDING THE GILA INDIAN COMMUNITY ARE THE INTENDED BENEFICIARIES. SUBRECIPIENT ACTIVITIES: THE RECIPIENT WILL CONTRACT THE FINAL DESIGN, CONSTRUCTION, AND ELECTRICAL WORK FOR THIS PROJECT.Arizona (Bureau of Reclamation federal awards)GILA RIVER INDIAN COMMUNITY$5.7M—
THE QUECHAN INDIAN TRIBE UNDERSTANDS THERE IS A NEED FOR IMPROVEMENTS TO THE IRRIGATION INFRASTRUCTURE THAT SUSTAINS CULTURE AND LIVELIHOODS OF THE TRIBE AND ITS MEMBERS. THE TRIBE CURRENTLY PUMPS WATER FROM THE COLORADO RIVER (RIVER) TO SUPPLY WATER TO TRIBALLY OWNED RANCHES 4 AND 7. CURRENTLY THE TRIBE HAS DIFFICULTY IN PUMPING WATER FROM THE RIVER TO THE RANCHES DURING TIMES WHEN THE RIVER WATER LEVELS ARE AT LOW LEVELS. AFTER EXAMINING DIFFERENT ALTERNATIVES, THE TRIBE HAS CONCLUDED THE BEST OPTION WOULD BE TO UTILIZE WATER FROM THE NEARBY MOHAVE CANAL.THE MOHAVE CANAL IS PART OF THE YUMA PROJECT RESERVATION DIVISION (YPRD), AN IRRIGATION CONVEYANCE SYSTEM OWNED BY THE US BUREAU OF RECLAMATION (RECLAMATION) AND OPERATED AND MAINTAINED BY BARD WATER DISTRICT (BWD). THIS PROJECT INVOLVES THE CONSTRUCTION OF A PUMP STATION, INSTALLATION OF A PIPELINE, AND INLET AND OUTLET STRUCTURES. THIS PROJECT WOULD DIVERT WATER FROM THE MOHAVE CANAL AND UTILIZE A LOW-LIFT HIGH-YIELD PUMP STATION TO TRANSPORT WATER THROUGH A 24-INCH PIPELINE AND DELIVER WATER TO THE SAME LOCATION THAT THE CURRENT PUMP STATION DELIVERS WATER. THE PROJECT WOULD ALSO INCLUDE THE CONSTRUCTION OF A SOLAR PANEL FIELD TO POWER THE PUMP STATION AND WOULD DECOMMISSION AND REMOVE A FAILING DIESEL PUMP STATION SITED ON THE BANK OF THE RIVER. THE PROJECT WILL UTILIZE CLEAN RENEWABLE ENERGY TO PROVIDE A DEPENDABLE SUPPLY OF WATER TO THE TRIBES 443 ACRES OF AGRICULTURAL LAND LOCATED IN RANCHES 4 AND 7.Arizona (Bureau of Reclamation federal awards)QUECHAN INDIAN TRIBE$400K—
UNDER THIS AGREEMENT, THE RECIPIENT SHALL INSTALL 3 AUTOMATIC, SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) CONTROLLED GATES WITHIN THE GILA BEND MAIN CANAL, PART OF THE PALOMA IRRIGATION AND DRAINAGE DISTRICT WATER DELIVERY SYSTEM, GILA BEND, ARIZONAArizona (Bureau of Reclamation federal awards)PALOMA IRRIGATION & DRAINAGE D$100K—
GROVERS HILL IRRIGATION DISTRICT (GHID) ORIGINALLY CONVEYED WATER TO ITS USERS VIA MORE THAN 16.5 MILES OF CONCRETE AND EARTHEN CANALS. THE 125 YEAR OLD CONCRETE AND EARTHEN CANAL CONVEYANCE SYSTEM IS IN THE PROCESS OF BEING UPGRADED TO A HIGH DENSITY POLYETHYLENE (HDPE) PIPELINE SYSTEM. THIS FOUR PHASE CONSTRUCTION PROJECT WAS PARTIALLY FUNDED BY A BUREAU OF RECLAMATION WATERSMART GRANT THAT GHID RECEIVED IN 2020. PHASE 1 WAS COMPLETED IN 2020 AND IMPLEMENTED 16,460 LINEAL FEET OF HDPE PIPELINE ON A PORTION OF THE LOWER CANAL. PHASE 2 WAS COMPLETED IN 2021 AND REPLACED THE MIDDLE CANAL IN ITS ENTIRETY WITH THE INSTALLATION OF APPROXIMATELY 20,799 LINEAL FEET OF HDPE PIPELINE. PHASE 3 AND PHASE 4 CONSTRUCTION IS CURRENTLY UNDERWAY, REPLACING 17,751 LINEAL FEET OF CONCRETE LINED CANAL WITH HDPE PIPELINE. CONSTRUCTION OF PHASE 4 IS ESTIMATED TO BE COMPLETE BEFORE APRIL 15TH, 2023. THE PRIMARY PURPOSE OF THE FOUR PHASE CONSTRUCTION PROJECT WAS TO REDUCE THE WATER LOST FROM EVAPORATION AND SEEPAGE BY REPLACING THE EXISTING EARTHEN CANALS WITH HDPE PIPE. THE EFFICIENCY OF THE SYSTEM HAS ALSO BEEN ENHANCED THROUGH THE INSTALLATION OF NECESSARY VALVES AND METERS TO TRACK WATER USAGE OF THE FARMERS AND GARDENERS THROUGH ALL FOUR PHASES OF THE PROJECT.CONDUCTING THIS SYSTEM OPERATION REVIEW (SOR) WILL ENABLE GHID TO ASSESS AND MEASURE WATER USAGE, WATER AVAILABILITY, SYSTEM IMPROVEMENTS TO REDUCE SEDIMENT, IMPROVE DELIVERY THROUGH AUTOMATED SYSTEMS, AND IMPROVE WATER CONSERVATION EFFORTS.Arizona (Bureau of Reclamation federal awards)GROVER'S HILL IRRIGATION DISTRICT$93K—
THE PALOMA IRRIGATION AND DRAINAGE DISTRICT, LOCATED IN SOUTHERN ARIZONA, WILL MODERNIZE A SEGMENT OF THEIR SYSTEM BY INSTALLING THREE NEW AUTOMATED TURNOUT GATES FOR WATER DELIVERY TO PRODUCERS OFF THE 34-MILE LONG GILA BEND MAIN CANAL. THE NEW GATES WILL PROVIDE MORE RELIABLE AND EFFICIENT WATER DELIVERIES, PREVENTION SPILLS, REDUCED OVERFLOWS, AND IMPROVED COORDINATION WITH WATER USERS. THE PROJECT IS IDENTIFIED AS A PRIORITY IN THE DISTRICT'S CAPITAL IMPROVEMENT PLAN AND WATER CONSERVATION PLAN.Arizona (Bureau of Reclamation federal awards)PALOMA IRRIGATION & DRAINAGE D$75K—
PROJECT 1: INSTALLATION OF RUBICON GATE (8 FOOT) AT GILA BEND MAIN CANALArizona (Bureau of Reclamation federal awards)PALOMA IRRIGATION & DRAINAGE D$75K—
THIS PROPOSED PROJECT WOULD BE PART OF THE DISTRICT S STRATEGY TO UPGRADE THEIR AGING FACILITIES AND SCADA SYSTEM. THE PROPOSED IMPROVEMENTS ARE TO REMOVE THE EXISTING LATERAL WC TURNOUT GATE AND INSTALL A NEW 42 RUBICON SLIPMETER GATE. A COFFERDAM OR PIPE PLUG WILL NEED TO BE INSTALLED AS THE SANTA ROSA CANAL (SRC) CANNOT BE DEWATERED DUE TO CONSTANT DELIVERY TO FARMERS AND THE AK-CHIN INDIAN COMMUNITY (AK-CHIN) DOWNSTREAM OF THIS SRC CHECK STRUCTURE AND TURNOUT, AS WELL AS REQUIRED APPURTENANCES TO MAINTAIN AND OPERATE THE NEW SLIPMETER GATE. THE NEW SLIPMETER GATE WILL ELIMINATE THE SPILLS DUE TO THE GATE LEAKING AND PROVIDE ACCURATE FLOW MEASUREMENT FOR FUTURE SRC LATERAL WC TURNOUT SERVICE.THIS SMALL-SCALE WATER EFFICIENCY PROJECT IS A PRIORITY TO MARICOPA-STANFIELD IRRIGATION AND DRAINAGE DISTRICT AND WAS APPROVED BY OUR BOARD. WE HOPE TO LEVERAGE FUNDING FROM THE WATERSMART PROGRAM TO HELP MARICOPA STANFIELD IRRIGATION AND DRAINAGE DISTRICT COMPLETE THIS MULTIPHASE PROJECT, MEETING BOTH THE DISTRICT S AND RECLAMATION S GOALS TO CONSERVE AND BETTER MANAGE OUR WATER RESOURCES AND INCREASE EFFICIENCY OF OUR SYSTEM. STAKEHOLDERS INCLUDE FARMERS AND CUSTOMERS IN THE DISTRICT, THE CENTRAL ARIZONA IRRIGATION AND DRAINAGE, AK-CHIN, AND THE BUREAU OF RECLAMATION. IN ADDITION TO AK-CHIN, THE DISTRICT BORDERS THE GILA RIVER INDIAN COMMUNITY (GRIC) TO THE NORTHEAST AND THE TOHONO O ODHAM NATION TO THE SOUTH. THE DISTRICT WOULD LIKE TO WORK WITH BOTH NATIVE AMERICAN COMMUNITIES TO BE GOOD NEIGHBORS AND STEWARDS TO PROTECT THE NATURAL ENVIRONMENT THAT WE SHARE ALONG OUR BORDERS.Arizona (Bureau of Reclamation federal awards)MARICOPA STANFIELD IRRIGATION$61K—
THE YUMA COUNTY WATER USER'S ASSOCIATION, LOCATED IN SOUTHWESTERN ARIZONA, WILL CONVERT 1,280 FEET OF OPEN DITCH INTO BURIED POLYVINYL CHLORIDE PIPELINE. THE PROJECT WILL PROVIDE A MORE EFFICIENT AND RELIABLE WATER DELIVERY SYSTEM BY REDUCING EVAPORATION SEEPAGE. PIPING THE SECTION OF CANAL WILL ELIMINATE AN ABOVE-GRADE FEATURE AND SYSTEM OPERATORS WILL BENEFIT FROM NEAR INSTANT DELIVERY, FLOW RATE CHANGES, AND SHUT-OFFS. THIS TYPE OF PROJECT IS IDENTIFIED AS A PRIORITY OF THE ASSOCIATION'S FIVE-YEAR WATER CONSERVATION PLAN.Arizona (Bureau of Reclamation federal awards)YUMA COUNTY WATER USERS ASSOCIATION——
CANAL PANEL REPAIRS AT CVCAArizona (Bureau of Reclamation federal awards)AC LOPEZ CONSTRUCTION INC$857K—
THE BUREAU OF RECLAMATION IS REQUIRED TO WORK WITH THE NAVAJO NATION TO OPERATE AND MAINTAIN FISH PASSAGES AND FISH HATCHERIES AS WELL AS CONSTRUCT AND IMPROVE HABITATS FOR ENDANGERED FISH THROUGH THE SJRIP AUTHORIZED BY P.L. 106-392. THESE ACTIVITIES INCLUDE THE CONSTRUCTION AND OPERATION OF THE HOGBACK CANAL FISH WEIR AND IRRIGATION FACILITY. THESE MANAGEMENT ACTIONS ARE CONDUCTED UNDER THE AUTHORITY AND DIRECTION OF VARIOUS BIOLOGICAL OPINIONS ISSUED BY THE USFWS IN ACCORDANCE WITH SECTION 7 OF THE ENDANGERED SPECIES ACT. AT THE HOGBACK CANAL THERE ARE TWO IRRIGATION PUMPS IN THE CANAL THAT OPERATE USING A VARIABLE FREQUENCY DRIVE (VFD) ELECTRICAL SYSTEM. THESE VFDS INTERFERE WITH THE FISH MONITORING EQUIPMENT THAT HAS BEEN INSTALLED TO IDENTIFY FISH ENTRAINMENT IN THE CANAL. THIS PROJECT WILL ALLOW NAVAJO NATION TO REPAIR AND REPLACE TWO IRRIGATION PUMPS IN THE HOGBACK CANAL WITH PUMPS THAT WILL NOT INTERFERE WITH THE FISH MONITORING EQUIPMENT. THESE PUMPS WILL FACILITATE THE CONTINUED OPERATION OF THE PIT-TAG ANTENNAS THAT HAVE BEEN INSTALLED TO DETECT FISH USING THE CANAL AND FISH WEIR. 1)PURCHASE AND INSTALLATION OF A NEW 50 HP PUMP AND 150 HP PUMP WITH NEW INTAKES AND A SOFT-START THAT ARE COMPATIBLE WITH THE FISH MONITORING EQUIPMENT. 2)MODIFY DISCHARGE, MANIFOLD, AND WATER LINE PIPING TO ACCOMMODATE NEW PUMPS.3)REBUILD EXISTING 300 HP PUMP AND RETROFIT WITH A SOFT START. THIS WORK WILL INCLUDE TRANSPORT OF THE PUMP TO THE REPAIR FACILITY AND RETURN TO SHIPROCK IRRIGATION DISTRICT.4)MODIFY ELECTRIC SUPPLY TO THE NEW PUMPS PER ELECTRICAL CODE.THE WORK TO BE PERFORMED AS PART OF THE ELECTRICAL UPGRADES INCLUDES:50 HP SECTION1)DISCONNECT AND REMOVE EXISTING VFD AND CABINET.2)TRENCH AND INSTALL NEW CONDUIT RUN FROM THE STARTER TO THE PROPOSED MOTOR PAD LOCATION ON THE WEST SIDE OF THE EXISTING STRUCTURE3)ADD AN ADDITIONAL CONDUIT TO THE EXISTING 50 HP MOTOR4)INSTALL THE NEW SOFT-START AND ENCLOSURE TO THE BACK SIDE OF THE UNISTRUT STRUCTURE. EXTEND THE EXISTING CONDUIT FROM THE EXISTING LOCATION TO THE NEW DRIVE LOCATION.5)INSTALL NEW 3-WAY DISCONNECT (ON-OFF-ON) IN THE LOCATION OF THE EXISTING 50 HP DRIVE.6)INSTALL NEW CONDUIT FROM THE 3-WAY TO THE DRIVE AND FIELD DEVICES.7)INSTALL NEW CONDUCTORS TO THE PROPOSED 50 HP CONCRETE PAD.8)ADD A LIQUID-TIGHT CONDUIT FOR THE NEW 50 HP MOTOR.9)REPLACE THE LIQUID TIGHT CONDUIT AND CONNECTORS FOR EXISTING 50 HP MOTOR150 HP SECTION10) DISCONNECT AND REMOVE EXISTING VFD AND CABINET.11)INSTALL THE NEW SOFT START AND ENCLOSURE TO THE BACK SIDE OF THE UNISTRUT STRUCTURE. EXTEND THE EXISTING CONDUIT FROM THE EXISTING LOCATION TO THE NEW DRIVE LOCATION.12)INSTALL A NEW 3-WAY DISCONNECT (ON-OFF-ON) IN THE LOCATION OF THE EXISTING 150 HP DRIVE.13)INSTALL NEW CONDUIT FROM THE 3-WAY TO THE DRIVE AND FIELD DEVICES.Arizona (Bureau of Reclamation federal awards)NAVAJO NATION TRIBAL GOVERNMENT$659K—
PURPOSE: TO PROVIDE A SOLAR COVER OVER WATER CANALS NEAR CHANDLER, AZ.ACTIVITIES TO BE PERFORMED: -COMPLIANCE NEPA-FINAL DESIGN-ORDER LONG-LEAD ITEMS (SOLAR PANELS, SIGNS, DRILLED SHAFTS)-FINAL PROJECT REPORT EXPECTED DELIVERABLES OR OUTCOMES: THE RECIPIENT WILL COMPLETE A SOLAR ARRAY OVER THE TOP LEVEL CANAL NEAR CHANDLER, AZ.INTENDED BENEFICIARIES: THE UNITED STATES PUBLIC AND THE RECIPIENT ARE THE INTENDED BENEFICIARIES. SUBRECIPIENT ACTIVITIES: THE RECIPIENT WILL CONTRACT THE FINAL DESIGN WORK FOR THIS PROJECT.Arizona (Bureau of Reclamation federal awards)GILA RIVER INDIAN COMMUNITY$517K—
73-19L-1 CANAL LINING PROJECTArizona (Bureau of Reclamation federal awards)COLORADO RIVER INDIAN TRIBES$209K—
MOD/MODE/US BYPASS CANAL REPAIRSArizona (Bureau of Reclamation federal awards)IOI CONSTRUCTION CORP.$776K—
MOD/MODE/US BYPASS CANAL REPAIRSArizona (Bureau of Reclamation federal awards)AC LOPEZ CONSTRUCTION INC$737K—
ASBESTOS ABATEMENT ALONG SALINITY CANAL, YUMA, AZArizona (Bureau of Reclamation federal awards)GOLD WAVE INC$28K—
EVALUATE FACTORS THAT INFLUENCE WILDLIFE USE OF CROSSING STRUCTURES ACROSS CANALS IN ARIZONA BY 1)DOCUMENTING SPECIES THAT USE CANAL CROSSING STRUCTURES 2)IDENTIFYING CHARACTERISTICS OF CROSSING STRUCTURES AND LANDSCAPE FEATURES AT LOCAL AND BROAD EXTENTS THAT PROMOTE WILDLIFE USE OF THESE STRUCTURES 3)EVALUATING LEVELS OF HUMAN USE OF CROSSING STRUCTURES AND THE POTENTIAL EFFECTS OF RECREATION ON WILDLIFE USE OF THESE AREAS.Arizona (Bureau of Reclamation federal awards)ARIZONA STATE UNIVERSITY$233K—
THE BUCKEYE WATER CONSERVATION AND DRAINAGE DISTRICT, LOCATED IN CENTRAL ARIZONA, WILL INSTALL TWO SOLAR-POWERED AUTOMATIC, SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) CONTROLLED GATES ON LATERAL 44. THE INSTALLATION AND AUTOMATION OF THE GATES WILL MINIMIZE FLOODING HAZARDS TO LOCAL RESIDENTIAL DEVELOPMENT, REDUCE BREACHING OF THE MAIN CANAL, AND IMPROVE THE MANAGEMENT AND EFFICIENCY OF THE WATER SYSTEM. THE PROJECT ADDRESSES THE GOALS AND OBJECTIVES TO AUTOMATE THE IRRIGATION SYSTEM IDENTIFIED IN THE DISTRICTS WATER CONSERVATION PLAN.Arizona (Bureau of Reclamation federal awards)BUCKEYE WATER CONSERVATION & DRAINAGE DISTRICT$100K—
CANAL SPILL REDUCTIONArizona (Bureau of Reclamation federal awards)ROOSEVELT IRRIGATION DISTRICT$60K—
E24 UNIT 1 EXP CANAL LINING PHASE 1 AT CNWRArizona (Bureau of Reclamation federal awards)AC LOPEZ CONSTRUCTION INC$2.5M—