Category
Pipeline
27 contracts tracked across 9 states.
Contracts
27
States covered
9
Vendors
8+
Top states for pipeline
Top vendors in pipeline
| Vendor | Contracts | Volume |
|---|---|---|
| IMD FLUID SYSTEM TECHNOLOGIES INC | 5 | $268K |
| GREY WOLF SERVICES LLC | 3 | $60K |
| AMERICAN CLASSIC CONSTRUCTION INC. | 2 | $154K |
| WCA CONSTRUCTION, LLC | 1 | $9.7M |
| ATLAS-OLH JV, LLC | 1 | $250K |
| PRECISION SURVEYS INC | 1 | $213K |
| OSCAR RENDA CONTRACTING INC | 1 | $138K |
| T BAILEY, LLC | 1 | $2.3M |
Recent pipeline contracts (27)
| Title | State | Vendor | Value | Solicitation |
|---|---|---|---|---|
| NGWSP REACH 1 PIPELINE REPAIRS | NM | WCA CONSTRUCTION, LLC | $9.7M | — |
| WATER SYSTEM PIPELINE CIVIL CONSTRUCTION INSPECTOR BLOCK 4C-8 - UPPER COLORADO BASIN REGION, LITTLE WATER AND NASCHITTI, NORTHWESTERN, NEW MEXICO | NM | ATLAS-OLH JV, LLC | $250K | — |
| NGWSP REACH 1 PIPELINE SURVEYS AND PLATS | NM | PRECISION SURVEYS INC | $213K | — |
| REACH 12A EMERGENCY PIPE REPAIR | NM | OSCAR RENDA CONTRACTING INC | $138K | — |
| HYRUM PIPE - DELIVER REINFORCED CONCRETE PIPE FOR HYRUM PIPE PROJECT IAW THE ATTACHED SPECIFICATIONS AND DRAWINGS. | UT | AMERICAN CLASSIC CONSTRUCTION INC. | $95K | — |
| UPPER LETTS MATERIALS - DELIVERY OF HDPE PIPE AND PRECAST CONCRETE UNITS, FOR THE UPPER LETTS PROJECT IAW THE ATTACHED SPECIFICATIONS. | UT | AMERICAN CLASSIC CONSTRUCTION INC. | $59K | — |
| HYRUM PVC PIPE | UT | GREY WOLF SERVICES LLC | $15K | — |
| PIPE AND ASSOCIATED FITTINGS | WA | T BAILEY, LLC | $2.3M | — |
| LEAVENWORTH NATIONAL FISH HATCHERY SURFACE WATER INTAKE FISH SCREENS AND FISH PASSAGE PHASE II PIPE REHABILITATION, COLUMBIA BASIN PROJECT, WASHINGTON | WA | TEK CONSTRUCTION, INC. | $672K | — |
| LODGE GRASS 1 PIPE DROP | MT | SILVER MOUNTAIN CONSTRUCTION LLC | $868K | — |
| PIPE, PVC, SOLID | MT | GREY WOLF SERVICES LLC | $33K | — |
| RIVER OUTLET WORKS PIPE RELINING AT GLEN CANYON POWER PLANT | AZ | HARTMAN-WALSH PAINTING COMPANY | $7.5M | — |
| WAPATOX PIPELINE REROUTE SURVEY | WA | PARAMETRIX INC | $86K | — |
| CALL ORDER UNIT 1 ADS PIPE 30" 300 LINEAR FEET DELIVERED ON 30 MAY OR 05 JUNE 2024. DELIVERY COORDINATION WITH GABE BECK AT TELEPHONE 928-373-8230. | AZ | GREY WOLF SERVICES LLC | $12K | — |
| AUBURN RECREATION SEWER PIPE AND INFRASTRUCTURE REPAIR | CA | ROD TRANSPORT INC | $1.3M | — |
| BLANKET PURCHASE AGREEMENT CALL - PIPE AND FITTINGS MARCH 2025 | CA | IMD FLUID SYSTEM TECHNOLOGIES INC | $149K | — |
| BLANKET PURCHASE AGREEMENT - PIPE AND FITTINGS - IMD FLUID SYSTEMS - CALL AUGUST 2023 | CA | IMD FLUID SYSTEM TECHNOLOGIES INC | $66K | — |
| BLANKET PURCHASE AGREEMENT - PIPE AND FITTINGS - IMD FLUID SYSTEMS - CALL JUNE 2023 | CA | IMD FLUID SYSTEM TECHNOLOGIES INC | $31K | — |
| BPA CALL - PIPE AND FITTINGS - NOV 2023 | CA | IMD FLUID SYSTEM TECHNOLOGIES INC | $22K | — |
| SCCAO CCTV PIPE INSPECTION FOR THE TRACY FISH COLLECTION FACILITY | CA | INTEGRITY INSPECTIONS | $11K | — |
| THE NEW MELONES WELL PIPE CURRENTLY HAS A HOLE AND NEEDS TO BE REPAIRED. | CA | MOUNTAIN METHODS, INC. | $9K | — |
| DELIVERY ORDER FOR RIDGID PIPE INSPECTION SYSTEM (1) 63583 35MM SL HR 325FT REEL PN: 713472 (1)RIDGID 63658 RMA200A SEWER CAMERA PN: 725840 & (1) RIDGID CS12X 57288 MONITOR PN: 681700 | CO | EASTERN POWER TECHNOLOGIES INC | $25K | — |
| BLANKET PURCHASE AGREEMENT - PIPE AND FITTINGS - IMD FLUID SYSTEMS - CALL JUNE 2023 | CA | IMD FLUID SYSTEM TECHNOLOGIES INC | — | — |
| DAVIE DITCH PIPELINE PROJECT SEE ATTACHMENTS WITH SPECIFICATIONS AND DRAWINGS IN THEIR ENTIRETY. | CO | K & D CONSTRUCTION INC | $1.7M | — |
| COPPER PIPE - SOLICITED ON EBUY RFQ1596414 FOR PAYMENT PURPOSES ONLY | DC | JENKS INC | $8K | — |
| BRACKISH GROUNDWATER NATIONAL DESALINATION RESEARCH FIRE SUPPRESSION PIPELINE REPAIR | NM | GENERAL HYDRONICS UTILITIES LLC | $11K | — |
| WATER PIPE/FITTINGS/VALVES | FL | K5 DEFENSE LLC | $41K | — |